STATEMENT OF WORK
FOR
Campus Lectern Reconfigurations
Revised
Dated: 5 September 2017
1. DESCRIPTION OF SERVICES / GENERAL INFORMATION. The contractor shall provide all management, tools, supplies, equipment, transportation, and non-personal services necessary to accomplish the acquisition, installation and integration of lectern style furniture, blu-ray players, and document cameras, as further defined in the attachments. The contractor shall be required to transport all replaced equipment to a central storage area, palletize, and prep for disposition through Defense Reutilization and Marketing Office (DRMO), 4060 Wilson Way, Joint Base San Antonio – Fort Sam Houston, Texas, 78234.
1.1. DESCRIPTION OF SERVICES. Requirements for this project are defined in appendix B through M.
1.1.1. SCHEDULE. Provide a Project schedule coordinated with the Government
Representative to identify specific timelines for each phase of the project and provide an overall estimated completion date. The point of contact (POC) shall coordinate with the Government representatives for access to the building(s) specified in this Statement of Work (SOW) as necessary. The Contractor shall propose the start date to the Government representatives a minimum of three (3) work days prior to starting work, and shall subsequently schedule work dates and coordinate all work with the using agency and through the Government representatives.
1.1.2. PROJECT PLAN AND STATUS REPORTS. Provide a detailed upgrade and configuration Project Plan to the Government Representative. Hold weekly Integrated Project
Team (IPT) meetings with the Government representatives, that covers progress made each week, ensure timelines are met and discuss any issues that arise. Provide immediate notification of any change in installation and/or upgrade schedule to Government Representative
1.1.3. PROJECT SUPERVISION. Identify a POC and an alternate with authority to act for the
Contractor relating to daily contract operation. The POC shall be an individual with at least five
(5) years’ of experience that is responsible for contract performance and delivery; conducting project team meetings with the Government’s Project Manager; producing a thorough project schedule that specifies building and rooms to be completed each day (within the specified period of performance); and handling logistic requirements. The POC shall coordinate and direct all contractor resources for project success, and shall be the primary project point of contact between the Contractor and the Government representative.
1.1.4. SITE EXAMINATION. Contractors shall examine the site and determine for themselves the existing conditions and general character of the site. Claims for additional costs due to conditions that could have been verified by site investigation shall not be permitted.
1.1.5. EQUIPMENT DELIVERY. All equipment shall be held by the contractor and delivered at the start of the installation. Contractor shall provide itemized list of all equipment with make, model and serial number as well as that installation specific information (building and room number) to the designated Government representative.
1.1.6. IMPLEMENTATION OF HARDWARE OR SOFTWARE COMPONENTS. Work in conjunction with the Medical Education and Training Campus’s Government Representative to ensure satisfactory implementation of any and all hardware or software components that shall attach to or install on existing network systems or devices.
1.1.7. REMOVAL OF EXISTING EQUIPMENT. Remove unneeded, existing lectern equipment once new equipment has been installed, tested, and accepted. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling for screens, sound systems, and projectors are installed, tested, and accepted. Contractors shall label, package, and move/transfer removed Government equipment. The Government shall provide contractor with safe place to store all existing equipment until moved to building 4188. Contractor shall provide an equipment list and the Government shall sign for all removed equipment at point of delivery to building 4188.
1.1.8. Brand Name. “Brand Name” supply items (or equivalent) shall be provided as required in this requirement.
1.1.9. LABELING. All terminations shall be labeled in accordance with previously established standards as evidenced by existing infrastructure.
1.1.10. INSPECTION AND ACCEPTANCE. Inspection and acceptance shall be at the project site. Notify the Government Representative in writing when the entire project has been inspected and ready for the Government’s inspection. With this notification, prepare and submit a list of items that must be corrected or completed.
1.1.10.1. FINAL INSPECTION. The Government representatives or technical representatives shall conduct an inspection when the project is substantially completed prior to a final inspection of the facility.
Upon completion of the final inspection, if deficiencies are noted the Government representatives shall transmit a punch list report to the Contractor listing discrepancies requiring correction or completion. The Contractor has ten (10) days to complete the punch list
When all final inspection discrepancies have been corrected, the Government representative shall conduct a re-inspection with the POC, the Contractor, and any needed subcontractors to determine whether the project can be finally accepted upon written notice from the Contractor that the punch list items are complete.
Upon written notice from the Contractor that the re-inspection punch list items are complete, the
Government representative shall verify that the discrepancies have been completed and determine whether the project can be finally accepted.
1.1.10.4. GOVERNMENT ACCEPTANCE. In accordance with the terms of the contract, the
Government shall accept, within ten (10) duty days after Final Inspection. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the
Government’s rights under any warranty or guarantee.
1.2. GENERAL INFORMATION. The Contractor shall:
a) Conduct themselves in a professional, courteous manner, maintaining acceptable appearances and dress.
b) Report in (with the Government’s Representative) at the beginning of each day as well as check out and provide project status at the end of the day.
c) Be responsible for transportation to and from jobsite as required. Building/area access shall be provided to the Contractor by the Customer or an assigned contact.
d) Maintain a clean and safe work environment. All unused materials, containers, tools and equipment shall be removed whenever possible and all trash debris shall be removed at the end of each day.
e) Take all precautions to protect all floors, walls, windows and other surfaces from stains, marring or other damage and shall be responsible for any necessary repairs.
1.2.1. COMMERCIAL WARRANTY. The Contractor agrees that the supplies/equipment or services furnished under this contract shall be covered by the manufacturer’s warranties. The printed terms and conditions of such warranties shall be provided to the Government with the delivery of any supplies/equipment or services covered.
1.3. QUALITY CONTROL. The contractor shall be responsible for quality control for all work accomplished during the performance of the task.
1.3.1. CONTRACT MANAGEMENT. The Government representatives shall be identified to the Contractor prior to start of work and shall monitor Contractor compliance with terms and conditions of the contract and notify the Government Point of Contact in writing of any deficiencies with recommendations as to corrective action. The Government representative is not authorized to take any actions which may result in changes in the provisions, specifications, or pricing of this contract. No changes in or deviation from the scope of service shall be effected without a modification executed.
1.3.2. HOURS OF OPERATION. Work shall be completed within occupied buildings but unoccupied work areas. Work hours shall be 7:30 a.m. to 4:30 p.m., Monday through Friday, exclusive of Federal holidays. At the option of the government, work may be permitted on
Holidays, weekends or after 4:30 p.m. daily at no additional cost to the government.
1.3.3. HOLIDAYS OBSERVED. The Government holidays (non-workday weekdays) are New
Year’s Day; Dr. Martin Luther King, JR. Birthday; President’s Day; Memorial Day;
Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; Christmas
Day.
Note: When any of the above holidays falls on a Saturday, the preceding Friday shall be observed as the legal holiday; holidays falling on a Sunday shall be observed on the following
Monday
1.3.3.1 FACILITY CLOSURES. The Government shall notify the Contractor of anticipated closure of the facility, (i.e., training, holidays, administrative leave granted to the entire staff, or other closure including down days or family days) five (5) business days in advance or as soon as possible. In the event of unplanned closure of the facility due to natural disasters, military emergency, or severe weather, the Contractor shall be notified in the same manner as DOD civilian personnel. The Government shall not pay if work on the TO cannot be performed during these periods.
1.3.4. SECURITY REQUIREMENTS. Contractor shall provide the name, date of birth, driver’s license number and state of issue for all personnel which shall require access to Joint
Base San Antonio, Fort Sam Houston to accomplish contract requirements.
1.3.4.1 APPLICABLE DOCUMENTS. The Contractor shall ensure all construction for this project is completed in with 29 CFR (Code of Federal Regulation) 1910, Occupational Safety and Health Administration General Standards and 29 CFR 1926, to include OSHA Construction
Standards, Unified Facilities Criteria (UFC) 3-580-01 Telecommunications Building Cabling
Systems Planning and Design, Unified Facilities Criteria (UFC) 3-600-01 Fire Protection
Engineering for Facilities, UFC 4-010-01 Minimum Antiterrorism Standards for Buildings, International Building Code, and Uniform Mechanical Code, and DA Technical Guide for
Installation Information Infrastructure Architecture (I3A). Furthermore, all electrical work shall comply with NFPA Life Safety Code 101, the latest edition of NFPA 70, (National Electric
Code) and NFPA standards for communications.
1.3.4.2 FIRE AND SAFETY REGULATIONS. The Contractor shall comply with all Fort Sam
Houston Post Fire and Safety Regulations. The Contractor is required to comply with the
American General Contractors' Safety Manual and the Occupational Safety and Health Act. The
Contractor shall comply with all applicable Air Force Occupational Health and Safety Standards and Regulations.
1.3.5. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE
NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT
COMMANDER. The services required under this SOW are not designated as mission essential.
1.3.6. SPECIAL QUALIFICATIONS. The design and programming shall be accomplished under direction and supervision with an individual with ten (10) years’ of experience, licensing and certification sufficient to insure installation meets all government and testing standards, and all operational requirements. The physical installation of equipment will be accomplished by no less than three installers with a minimum of five (5) years’ of experience installing audio/video equipment similar to the environment of the Medical Education and Training Campus. The work shall be in strict accordance with the contract documents and standards of the industry. For those trades not requiring a license, the Contractor shall ensure qualified and experienced personnel in their trades are assigned to government project work
1.3.7. RECORDS MANAGEMENT. The Contractor shall manage all data created for
Government use or legally controlled by the Government, in support of the functional activity or required by Air Force publication, in accordance with the AF records management procedures in
Air Force Instruction (AFI) 33 - 322, Records Management Program, paragraph 10, Air Force
Manual (AFMAN) 37-123,paragraph 7.4, AFMAN 37-138, paragraph 2.13, and the Air Force
Records Disposition Schedule (AFRDS) located at https://afrims.amc.af.mil/rds_series.cfm or http://www.amc.af.mil/shared/media/document/AFD-060803-003.pdf “
1.3.8. AIR FORCE ANTITERRORISM (AT) PROGRAM. The AT program seeks to deter or limit the effects of terrorist acts against the AF by giving guidance on collecting and disseminating timely threat information, providing training to all AF members, developing comprehensive plans to deter and counter terrorist incidents, allocating funds and personnel and implementing AT measures. In accordance with AFI 10-245 paragraphs 2.18 and paragraph 2.25, DOD contractors and sub-contractor personnel shall be offered Level 1 - AT Awareness
Training. AT Awareness Training may be accomplished by either a Level I - qualified instructor, or by completing the "Force Protection" computer based training (CBT) course on the Advanced
Distributed Learning System (ADLS) https://golearn.csd.disa.mil/kc/login/login.asp or at https://jkodirect.jten.mil for individuals without access to Non-Secure Internet Protocol Router
Network, possessing a Common Access Card, nor enrolled in Defense Enrollment Eligibility
Reporting System. Compliance with the training will be monitored by the contracting officer’s representative.
2. DELIVERY SUMMARY.
Table I
Performance Objective SOW Paragraph Performance Threshold
1. Produce an agreed upon project schedule with the
Project Manager.
Schedule
(Paragraph 1.1.1)
Produce an agreed upon project schedule with the
Project Manager.
2. Conduct project team meeting with the PM and other government representatives.
Project Plan and Status Reports
(Paragraph 1.1.2)
Conduct project team meeting with the PM and other government representatives.
3. Identify a POC and an alternate with authority to act for the Contractor relating to daily contract operation.
Project Supervision
(Paragraph 1.1.3)
Contractor shall provide a
Project Manager responsible for contract performance and delivery.
4. Furnish and install all required components to support the installation and operation of the audio/video equipment in the classroom.
Specific Requirements
(Paragraph 1.1)
Contractor shall ensure existing hardware components fully integrates with new components, having less than a
1% error rate that is corrected
The Contractor shall connect, integrate, configure, program, and test existing AV equipment, screens, speakers, and projectors with newly installed equipment.
within 24 hours of noted deficiency
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Contractor may utilize electrical utilities and restrooms facilities as needed. The Contractor shall use good judgment in the conservation of government utilities. The Contractor shall adhere to and enforce prevailing energy conservation practices.
3.1 WORK/STORAGE AND PARKING. Do not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire. Storage and parking shall be near the job site or as designated by the Government representatives. Limited storage may be available to contractor upon request.
Storage of materials shall be coordinated with the Government representatives. The storage areas shall be free of debris, refuse, spills, leaks, stains, splashes and excessive materials. All storage areas shall be maintained in a neat, clean, and safe condition.
TABLE II
Required Documentation
Equipment list(s) with room number(s), item description, brand name, make and model with serial numbers and quantity as system equipment is delivered and installed.
Documentation for all Original Equipment Manufacturer equipment, including user guides, maintenance guides, administration/configuration manuals, and training documentation.
Track, document, and deliver all software, software configurations, programming, and software licenses used by the system.
Documentation and full disclosures of warranty items to include time period of coverage and how and from whom to obtain warranty services. This shall cover all equipment, installation and other items with warranties concerning warranty information.
Cable layout and equipment drawings (either in CAD or PDF format).
Names, titles, certifications, training, and years of experience of key personnel in the design and supervision of the installation.
4. APPENDICES.
A Acronyms
B MIF 1: Small Lectern and Interactive Display
C MIF 2: Small Lectern and Interactive Display
D MIF 3: Small Lectern and Interactive Display
E MIF 4: Small Lectern and Interactive Display
F MIF 5: Small Lectern and Interactive Display
G DCMT and MEDLOG: Small Lectern and Interactive Display
H MIF 1: Standard Lectern
I MIF 2: Standard Lectern
J MIF 3: Standard Lectern
K MIF 4: Standard Lectern
L MIF 5: Standard Lectern
M DCMT and MEDLOG: Document Camera Install and Lectern Reprogramming
APPENDIX A ACRONYMS
ADLS Advanced Distributed Learning System
AF Air Force
AFI Air Force Instruction
AFMAN Air Force Manual
AFRDS Air Force Records Disposition Schedule
AT Antiterrorism
Bldg Building
CFR Code of Federal Regulation
CAC Common Access Card
CAD Computer Aided Design
CBT Computer Based Training
DEERS Defense Enrollment Eligibility Reporting System
DRMO Defense Reutilization and Marketing Office
DOD Department of Defense
IPT Integrated Project Team
METC Medical Education and Training Campus
NFPA National Fire Protection Association
NIPRNet Non-Secure Internet Protocol Router Network
OSHA Occupational Safety and Health Act
OEM Original Equipment Manufacturer
POC Point of Contact
PDF Portable Document Format
PM Project Manager
QC Quality Control
SOW Statement of Work
UFC Unified Facilities Criteria
APPENDIX B
Medical Education and Training Campus (METC)
MIF 1: Small Lectern and Interactive Display
1.0 PROJECT INFORMATION: This requirement shall furnish and install 20 new 33” lecterns, 20 blu-ray players, 20 document cameras, and four 84” mobile, floor stand mounted, interactive displays in building 899 at the Medical Education and Training Campus on Fort Sam
Houston (Table I for specific location information). The Contractor shall provide all management, tools, supplies, equipment, labor, materials and documentation required including final design and labor required for the engineering, installation, and testing of this project.
Equipment shall be the most up-to-date training equipment possible to support current and future instructors and trainees.
2.0 DESCRIPTION OF WORK: Deliver a turn-key solution where a variety of presentation tools are integrated in the system to enhance the educational process. Integrated capabilities shall include notebook connectivity (network and A/V), document camera, Blu-Ray player, allocated spacing and connectivity for a government provided PC and annotation over any presented image and auxiliary audio visual connections, and confidence monitor capabilities.
Integrate new capabilities into existing audio/video infrastructure and ensure proper operation of lecterns, screens, speakers, and projector equipment. Salient characteristics are listed in (Table
II).
3.0 INFRASTRUCTURE INSTALLATION. Furnish, install and clearly label all required infrastructure to support proper operation of lecterns, screens, speakers, and projector equipment.
Coordinate with the Government PM prior to the infrastructure installation start date to determine that the site is ready for installation. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling for screens, sound systems, and projectors are installed, labeled, tested, and accepted. Prior to the infrastructure installation start date, a joint site inspection by the Contractor and Government Representative shall be held to verify project site status as being ready for installation and the successful completion of all tasks supporting this project.
4.0 SYSTEM INSTALLATION. Furnish and install all required lectern components necessary to connect, integrate, configure, program, and test controls for existing lectern components.
NOTE: On-site storage of project material is limited but available with coordination through
Government Representative. Upon completion of installation and final testing of system and infrastructure components, provide system documentation (user guides), applicable system code;
warranty information; block diagram by room, and initial on-site training services to the
Government.
5.0 LECTERN FURNITURE. Install existing AV components in lecterns. When plugged in, power must still flow to recharging stations within the system to maintain full battery capacity on wireless components. The lectern shall be equipped with an input/output box for connectivity with existing infrastructure. The lectern shall have a cooling fan for the PC to draw cool air through the enclosed cabinetry operating only while the PC is on and not interfering with the presenter’s delivery. The lectern shall have provisions for a Blu-Ray player, keyboard and mouse and a 21.5” preview monitor along with an HDMI cable for an external laptop computer. The lectern shall have convenient auxiliary AV cables for composite video and stereo audio cabling with RCA cables. The lectern shall contain a 7” touch-screen system control device that allows easy switching between sources, power off, audio switching, volume control, component control pages for DVD, and document camera functions as well as the projector.
The Contractor shall be responsible for disposal of existing lectern furniture.
6.0 LECTERN CONTROL PROGRAMMING. All current functions and operations of any existing lectern programming will remain intact. All peripheral devices will be controlled by the lectern control system. All standard functions of connected peripherals will be controlled by the touch panel. All standard user functions will be limited to one page on the touch panel.
Technician/administrative functions will be located on additional pages that will be password protected. All control panel icons will be clearly recognized or clearly labeled. All programming will be vetted and approved by Government Representative prior to integration.
7.0 SOUND SYSTEM. Integrate existing audio system for automatic audio-follows-source switching which includes an amplifier to support a room of up to 52 people. The sound system must be able to be controlled via the lectern touch panel.
Table I
MIF-1
ROOM
Blu-
Ray
Doc
Cam
Interactive
Display
Small
Lectern
110 1 1 1
111 1 1 1
112 1 1 1
113 1 1 1
114 1 1 1
120 1 1 1
129 1 1 1 1
130 1 1
203 1 1 1
204 1 1 1
205 1 1 1
207 1 1 1
208 1 1 1
209 1 1 1
210 1 1 1
211 1 1 1
302 1 1 1 1
318 1 1 1 1
324 1 1 1
416 1 1 1 1
Total: 20 20 4 20
TABLE II
MODEL DESCRIPTION SPECIFICATIONS QTY
33” flat top lectern with articulating monitor mount Flat top, 33” work surface
Thermostatically controlled internal fans for dust and temperature control to ensure temperature remains between 85º and 87º at all times, with three year warranty
Articulating monitor arm for 21.5” interactive display
Cut-out for 7” control panel
4” round cut-out for cable caddy and connector cables
Solid steel AV rack-frame
Lectern skin shall be capable of replacement without requirement of full replacement of entire lectern
8084i-G4-
SMP
Interactive Display 84” or larger Display
Optimal Interaction
HyPr Touch Technology
10 simultaneous touch, writing, erase points
Pen ID
Display:
Type LED
Aspect ratio 16:9
Optimal resolution 3840 × 2160 at 60 Hz
Horizontal frequency (typical) 135 kHz
Vertical frequency (typical) 60 Hz
Contrast ratio (typical) 5000:1
Brightness (maximum) 360 cd/m²
Pixel pitch 0.429 mm × 0.429 mm
Gamut 72% of NTSC
Viewing angle 178°
Response time (typical) 8 ms
1000BASE-T Ethernet
Two external ports for a four-port Gigabit
Ethernet switched network connecting the interactive display and the iQ appliance to an external network and an external device such as a computer
Presence detection
Audio: 10 W integrated speakers
Pen (x2)
Eraser
USB Cable
Power Cable
Mounting Holes
Software: SMART Learning Suite (Meeting
Pro)
Connectors:
OPS slot (for the iQ appliance)
Stereo 3.5 mm out
S/PDIF out
Stereo 3.5 mm in
VGA in
HDMI 2.0 in (x2)
DisplayPort in
USB Type-B (×4)
USB Type-A (x3)
RJ45 (×2)
USB 3.0 Type-A (×2)
USB 2.0 Type-B4
USB 2.0 Type-B
HDCP encrypted HDMI out
AC power in
AC power out
RS-232 in
RS-232 out
300AFHD
CVBSR232
Aver High-Definition
Mechanical Arm Document
Camera
Aver CVBS/RS232 Cable
This document camera must be compact in size, taking up no more than 15” x 7” of the desktop surface on the lectern.
Must be able to be controlled via RS232 serial cable.
Must have a lamp source of an LED light, to avoid frequent expenses to change bulbs.
Must have an auto and manual focus capability and 16X digital zoom (or better).
Must have the following input/output connections:
1080p (1920 x 1080) HDMI Output
USB
RGB Input/Output: 15-Pins D-sub
(VGA)
RS-232
DC 12V Input
VGA Input/Output
Composite Video: RCA Jack
DN-500BD Denon Professional Rack-mountable Blu-ray Player Broadcast grade blu-ray player
Rack mountable
Capable of playing back a variety of formats
Controlled by Crestron controller
CRE-TT-
101-B-T
Cable Caddy w/cables and 120v power Flush tabletop mount in a 4 inch (102
mm) round hole, 1/2 to 1-1/4 inch (13 to
32 mm) surface thickness
Provides pass-thru holes for up to four cables
HDMI, Type A, 6 ft (1.8 m)
VGA, HD15, 6 ft (1.8 m)
Stereo Audio, 3.5mm TRS, 6 ft (1.8 m)
LAN, Shielded CAT5e, RJ45, 7 ft
(2.1 m)
NEMA 5-15R grounded AC power receptacle; Maximum Load: 10 Amps @
125 Volts AC, 50/60 Hz
APPENDIX C
MIF 2: Small Lectern and Interactive Display
1.0 PROJECT INFORMATION: This requirement shall furnish and install 23 new 33” lecterns, 24 blu-ray players, 24 document cameras, and 24 84” mobile, floor stand mounted, interactive displays in building 895 at the Medical Education and Training Campus on Fort Sam
Houston (Table I for specific location information). The Contractor shall provide all management, tools, supplies, equipment, labor, materials and documentation required including final design and labor required for the engineering, installation, and testing of this project.
shall include notebook connectivity (network and A/V), document camera, Blu-Ray player, allocated spacing and connectivity for a government provided PC and annotation over any presented image and auxiliary audio visual connections, and confidence monitor capabilities.
Integrate new capabilities into existing audio/video infrastructure and ensure proper operation of
Coordinate with the Government PM prior to the infrastructure installation start date to determine that the site is ready for installation. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling for screens, sound systems, and projectors are installed, labeled, tested, and accepted. Prior to the infrastructure installation start date, a joint site inspection by the Contractor and Government Representative shall be held to verify
NOTE: On-site storage of project material is limited but available with coordination through
Government Representative. Upon completion of installation and final testing of system and infrastructure components, provide system documentation (user guides), applicable system code;
wireless components. The lectern shall be equipped with an input/output box for connectivity with existing infrastructure. The lectern shall have a cooling fan for the PC to draw cool air with RCA cables. The lectern shall contain a 7” touch-screen system control device that allows lectern control system. All standard functions of connected peripherals will be controlled by the touch panel. All standard user functions will be limited to one page on the touch panel.
Technician/administrative functions will be located on additional pages that will be password
MIF-2
Blu-
Ray
Doc
Cam
Interactive
Display
Small
Lectern
104 1 1 1 1
106 1 1 1 1
108 1 1 1 1
115 1 1 1 1
122 1 1 1 1
123 1 1 1 1
125 1 1 1 1
134 1
215 1 1 1 1
216 1 1 1 1
217 1 1 1 1
218 1 1 1 1
219 1 1 1 1
221 1 1 1 1
222 1 1 1 1
224 1 1 1 1
304 1 1 1
309 1 1 1 1
313 1 1 1 1
403 1 1 1 1
405 1 1 1 1
414 1 1 1 1
415 1 1 1 1
418 1 1 1
423 1 1 1 1
Total: 24 24 24 23
Flat top, 33” work surface
Thermostatically controlled internal fans for dust and temperature control to ensure temperature remains between 85º and 87º at all times, with three year warranty
Articulating monitor arm for 21.5” interactive display
Cut-out for 7” control panel
4” round cut-out for cable caddy and connector cables
Solid steel AV rack-frame
Lectern skin shall be capable of replacement without requirement of full replacement of entire lectern
8084i-G4-
SMP
Interactive Display 84” or larger Display
Optimal Interaction
HyPr Touch Technology
10 simultaneous touch, writing, erase points
Pen ID
Display:
Type LED
Aspect ratio 16:9
Optimal resolution 3840 × 2160 at 60 Hz
Horizontal frequency (typical) 135 kHz
Vertical frequency (typical) 60 Hz
Contrast ratio (typical) 5000:1
Brightness (maximum) 360 cd/m²
Pixel pitch 0.429 mm × 0.429 mm
Gamut 72% of NTSC
Viewing angle 178°
Response time (typical) 8 ms
1000BASE-T Ethernet
Two external ports for a four-port Gigabit
Ethernet switched network connecting the interactive display and the iQ appliance to an external network and an external device such as a computer
Presence detection
Audio: 10 W integrated speakers
Pen (x2)
Eraser
USB Cable
Power Cable
Mounting Holes
Software: SMART Learning Suite (Meeting
Pro)
Connectors:
OPS slot (for the iQ appliance)
Stereo 3.5 mm out
S/PDIF out
Stereo 3.5 mm in
VGA in
HDMI 2.0 in (x2)
DisplayPort in
USB Type-B (×4)
USB Type-A (x3)
RJ45 (×2)
USB 3.0 Type-A (×2)
USB 2.0 Type-B4
USB 2.0 Type-B
HDCP encrypted HDMI out
AC power in
AC power out size, taking up no more than 15” x 7” of the desktop surface on the lectern.
Must be able to be controlled via RS232 serial cable.
Must have a lamp source of an LED light, to avoid frequent expenses to change bulbs.
Must have an auto and manual focus capability and 16X digital zoom (or better).
Must have the following input/output connections:
1080p (1920 x 1080) HDMI Output
USB
RGB Input/Output: 15-Pins D-sub
(VGA)
RS-232
DC 12V Input
VGA Input/Output
Composite Video: RCA Jack
DN-500BD Denon Professional Rack-mountable Blu-ray Player Broadcast grade blu-ray player
Rack mountable
Capable of playing back a variety of formats
Controlled by Crestron controller
CRE-TT-
101-B-T
Cable Caddy w/cables and 120v power Flush tabletop mount in a 4 inch (102
mm) round hole, 1/2 to 1-1/4 inch (13 to
32 mm) surface thickness
Provides pass-thru holes for up to four cables
HDMI, Type A, 6 ft (1.8 m)
VGA, HD15, 6 ft (1.8 m)
Stereo Audio, 3.5mm TRS, 6 ft (1.8 m)
LAN, Shielded CAT5e, RJ45, 7 ft
(2.1 m)
NEMA 5-15R grounded AC power receptacle; Maximum Load: 10 Amps @
APPENDIX D
MIF 3: Small Lectern and Interactive Display
1.0 PROJECT INFORMATION: This requirement shall furnish and install 9 new 33” lecterns, 9 blu-ray players, 9 document cameras, and 9 84” mobile, floor stand mounted, interactive displays in building 1356 at the Medical Education and Training Campus on Fort Sam Houston
(Table I for specific location information). The Contractor shall provide all management, tools, supplies, equipment, labor, materials and documentation required including final design and labor required for the engineering, installation, and testing of this project. Equipment shall be the most up-to-date training equipment possible to support current and future instructors and trainees.
shall include notebook connectivity (network and A/V), document camera, Blu-Ray player, allocated spacing and connectivity for a government provided PC and annotation over any presented image and auxiliary audio visual connections, and confidence monitor capabilities.
Integrate new capabilities into existing audio/video infrastructure and ensure proper operation of
Coordinate with the Government PM prior to the infrastructure installation start date to determine that the site is ready for installation. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling for screens, sound systems, and projectors are installed, labeled, tested, and accepted. Prior to the infrastructure installation start date, a joint site inspection by the Contractor and Government Representative shall be held to verify
NOTE: On-site storage of project material is limited but available with coordination through
Government Representative. Upon completion of installation and final testing of system and infrastructure components, provide system documentation (user guides), applicable system code;
wireless components. The lectern shall be equipped with an input/output box for connectivity with existing infrastructure. The lectern shall have a cooling fan for the PC to draw cool air with RCA cables. The lectern shall contain a 7” touch-screen system control device that allows lectern control system. All standard functions of connected peripherals will be controlled by the touch panel. All standard user functions will be limited to one page on the touch panel.
Technician/administrative functions will be located on additional pages that will be password
MIF-3
Blu-
Ray
Doc
Cam
Interactive
Display
Small
Lectern
119 1 1 1 1
120 1 1 1 1
123 1 1 1 1
145 1 1 1 1
147 1 1 1 1
173 1 1 1 1
214 1 1 1 1
303 1 1 1 1
314 1 1 1 1
Total: 9 9 9 9
Flat top, 33” work surface
Thermostatically controlled internal fans for dust and temperature control to ensure temperature remains between 85º and 87º at all times, with three year warranty
Articulating monitor arm for 21.5” interactive display
Cut-out for 7” control panel
4” round cut-out for cable caddy and connector cables
Solid steel AV rack-frame
Lectern skin shall be capable of replacement without requirement of full replacement of entire lectern
8084i-G4-
SMP
Interactive Display 84” or larger Display
Optimal Interaction
HyPr Touch Technology
10 simultaneous touch, writing, erase points
Pen ID
Display:
Type LED
Aspect ratio 16:9
Optimal resolution 3840 × 2160 at 60 Hz
Horizontal frequency (typical) 135 kHz
Vertical frequency (typical) 60 Hz
Contrast ratio (typical) 5000:1
Brightness (maximum) 360 cd/m²
Pixel pitch 0.429 mm × 0.429 mm
Gamut 72% of NTSC
Viewing angle 178°
Response time (typical) 8 ms
1000BASE-T Ethernet
Two external ports for a four-port Gigabit
Ethernet switched network connecting the interactive display and the iQ appliance to an external network and an external device such as a computer
Presence detection
Audio: 10 W integrated speakers
Pen (x2)
Eraser
USB Cable
Power Cable
Mounting Holes
Software: SMART Learning Suite (Meeting
Pro)
Connectors:
OPS slot (for the iQ appliance)
Stereo 3.5 mm out
S/PDIF out
Stereo 3.5 mm in
VGA in
HDMI 2.0 in (x2)
DisplayPort in
USB Type-B (×4)
USB Type-A (x3)
RJ45 (×2)
USB 3.0 Type-A (×2)
USB 2.0 Type-B4
USB 2.0 Type-B
HDCP encrypted HDMI out
AC power in
AC power out
RS-232 in size, taking up no more than 15” x 7” of the desktop surface on the lectern.
Must be able to be controlled via RS232 serial cable.
Must have a lamp source of an LED light, to avoid frequent expenses to change bulbs.
Must have an auto and manual focus capability and 16X digital zoom (or better).
Must have the following input/output connections:
1080p (1920 x 1080) HDMI Output
USB
RGB Input/Output: 15-Pins D-sub (VGA)
RS-232
DC 12V Input
VGA Input/Output
Composite Video: RCA Jack
DN-500BD Denon Professional Rack-mountable Blu-ray Player Broadcast grade blu-ray player
Rack mountable
Capable of playing back a variety of formats
Controlled by Crestron controller
CRE-TT-
101-B-T
Cable Caddy w/cables and 120v power Flush tabletop mount in a 4 inch (102 mm) round hole, 1/2 to 1-1/4 inch (13 to 32 mm) surface thickness
Provides pass-thru holes for up to four cables
HDMI, Type A, 6 ft (1.8 m)
VGA, HD15, 6 ft (1.8 m)
Stereo Audio, 3.5mm TRS, 6 ft (1.8 m)
LAN, Shielded CAT5e, RJ45, 7 ft (2.1 m)
NEMA 5-15R grounded AC power receptacle; Maximum Load: 10 Amps @
APPENDIX E
MIF 4: Small Lectern and Interactive Display
1.0 PROJECT INFORMATION: This requirement shall furnish and install 10 new 33” lecterns, 10 blu-ray players, 10 document cameras, and 10-84” mobile, floor stand mounted, interactive displays in building 1364 at the Medical Education and Training Campus on Fort Sam
Houston (Table I for specific location information). The Contractor shall provide all management, tools, supplies, equipment, labor, materials and documentation required including final design and labor required for the engineering, installation, and testing of this project.
shall include notebook connectivity (network and A/V), document camera, Blu-Ray player, allocated spacing and connectivity for a government provided PC and annotation over any presented image and auxiliary audio visual connections, and confidence monitor capabilities.
Integrate new capabilities into existing audio/video infrastructure and ensure proper operation of
Coordinate with the Government PM prior to the infrastructure installation start date to determine that the site is ready for installation. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling for screens, sound systems, and projectors are installed, labeled, tested, and accepted. Prior to the infrastructure installation start date, a joint site inspection by the Contractor and Government Representative shall be held to verify
NOTE: On-site storage of project material is limited but available with coordination through
Government Representative. Upon completion of installation and final testing of system and infrastructure components, provide system documentation (user guides), applicable system code;
wireless components. The lectern shall be equipped with an input/output box for connectivity with existing infrastructure. The lectern shall have a cooling fan for the PC to draw cool air with RCA cables. The lectern shall contain a 7” touch-screen system control device that allows lectern control system. All standard functions of connected peripherals will be controlled by the touch panel. All standard user functions will be limited to one page on the touch panel.
Technician/administrative functions will be located on additional pages that will be password
MIF-4
Blu-
Ray
Doc
Cam
Interactive
Display
Small
Lectern
209 1 1 1 1
213 1 1 1 1
214 1 1 1 1
216 1 1 1 1
243 1 1 1 1
249 1 1 1 1
440A 1 1 1 1
440B 1 1 1 1
449 1 1 1 1
450 1 1 1 1
Total: 10 10 10 10
Flat top, 33” work surface
Thermostatically controlled internal fans for dust and temperature control to ensure temperature remains between 85º and 87º at all times, with three year warranty
Articulating monitor arm for 21.5”
4” round cut-out for cable caddy and connector cables
Solid steel AV rack-frame
Lectern skin shall be capable of replacement without requirement of full replacement of entire lectern
8084i-G4-
SMP
Interactive Display 84” or larger Display
Optimal Interaction
HyPr Touch Technology
10 simultaneous touch, writing, erase points
Pen ID
Display:
Type LED
Aspect ratio 16:9
Optimal resolution 3840 × 2160 at 60 Hz
Horizontal frequency (typical) 135 kHz
Vertical frequency (typical) 60 Hz
Contrast ratio (typical) 5000:1
Brightness (maximum) 360 cd/m²
Pixel pitch 0.429 mm × 0.429 mm
Gamut 72% of NTSC
Viewing angle 178°
Response time (typical) 8 ms
1000BASE-T Ethernet
Two external ports for a four-port Gigabit
Ethernet switched network connecting the interactive display and the iQ appliance to an external network and an external device such as a computer
Presence detection
Audio: 10 W integrated speakers
Pen (x2)
Eraser
USB Cable
Power Cable
Mounting Holes
Software: SMART Learning Suite (Meeting
Pro)
Connectors:
OPS slot (for the iQ appliance)
Stereo 3.5 mm out
S/PDIF out
Stereo 3.5 mm in
VGA in
HDMI 2.0 in (x2)
DisplayPort in
USB Type-B (×4)
USB Type-A (x3)
RJ45 (×2)
USB 3.0 Type-A (×2)
USB 2.0 Type-B4
USB 2.0 Type-B
HDCP encrypted HDMI out
AC power in
AC power out size, taking up no more than 15” x 7” of the desktop surface on the lectern.
Must be able to be controlled via RS232 serial cable.
Must have a lamp source of an LED light, to avoid frequent expenses to change bulbs.
Must have an auto and manual focus capability and 16X digital zoom (or better).
Must have the following input/output connections:
1080p (1920 x 1080) HDMI Output
USB
RGB Input/Output: 15-Pins D-sub
(VGA)
RS-232
DC 12V Input
VGA Input/Output
Composite Video: RCA Jack
DN-500BD Denon Professional Rack-mountable Blu-ray Player Broadcast grade blu-ray player
Rack mountable
Capable of playing back a variety of formats
Controlled by Crestron controller
CRE-TT-
101-B-T
Cable Caddy w/cables and 120v power Flush tabletop mount in a 4 inch (102
mm) round hole, 1/2 to 1-1/4 inch (13 to
32 mm) surface thickness
Provides pass-thru holes for up to four cables
HDMI, Type A, 6 ft (1.8 m)
VGA, HD15, 6 ft (1.8 m)
Stereo Audio, 3.5mm TRS, 6 ft (1.8 m)
LAN, Shielded CAT5e, RJ45, 7 ft
(2.1 m)
NEMA 5-15R grounded AC power
APPENDIX F
MIF 5: Small Lectern and Interactive Display
1.0 PROJECT INFORMATION: This requirement shall furnish and install 4 new 33” lecterns, 4 blu-ray players, 4 document cameras, and 5 84” mobile, floor stand mounted, interactive displays in building 1393 at the Medical Education and Training Campus on Fort Sam Houston
(Table I for specific location information). The Contractor shall provide all management, tools, supplies, equipment, labor, materials and documentation required including final design and labor required for the engineering, installation, and testing of this project. Equipment shall be the most up-to-date training equipment possible to support current and future instructors and trainees.
shall include notebook connectivity (network and A/V), document camera, Blu-Ray player, allocated spacing and connectivity for a government provided PC and annotation over any presented image and auxiliary audio visual connections, and confidence monitor capabilities.
Integrate new capabilities into existing audio/video infrastructure and ensure proper operation of
Coordinate with the Government PM prior to the infrastructure installation start date to determine that the site is ready for installation. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling for screens, sound systems, and projectors are installed, labeled, tested, and accepted. Prior to the infrastructure installation start date, a joint site inspection by the Contractor and Government Representative shall be held to verify
NOTE: On-site storage of project material is limited but available with coordination through
Government Representative. Upon completion of installation and final testing of system and infrastructure components, provide system documentation (user guides), applicable system code;
wireless components. The lectern shall be equipped with an input/output box for connectivity with existing infrastructure. The lectern shall have a cooling fan for the PC to draw cool air with RCA cables. The lectern shall contain a 7” touch-screen system control device that allows lectern control system. All standard functions of connected peripherals will be controlled by the touch panel. All standard user functions will be limited to one page on the touch panel.
Technician/administrative functions will be located on additional pages that will be password
MIF-5
Blu-
Ray
Doc
Cam
Interactive
Display
Small
Lectern
137 1 1 1 1
145 1
244 1 1 1 1
245 1 1 1 1
251 1 1 1 1
Total: 4 4 5 4
Flat top, 33” work surface
Thermostatically controlled internal fans for dust and temperature control to ensure temperature remains between 85º and 87º at all times, with three year warranty
Articulating monitor arm for 21.5” interactive display
Cut-out for 7” control panel
4” round cut-out for cable caddy and connector cables
Solid steel AV rack-frame
Lectern skin shall be capable of replacement without requirement of full replacement of entire lectern
8084i-G4-
SMP
Interactive Display 84” or larger Display
Optimal Interaction
HyPr Touch Technology
10 simultaneous touch, writing, erase points
Pen ID
Display:
Type LED
Aspect ratio 16:9
Optimal resolution 3840 × 2160 at 60 Hz
Horizontal frequency (typical) 135 kHz
Vertical frequency (typical) 60 Hz
Contrast ratio (typical) 5000:1
Brightness (maximum) 360 cd/m²
Pixel pitch 0.429 mm × 0.429 mm
Gamut 72% of NTSC
Viewing angle 178°
Response time (typical) 8 ms
1000BASE-T Ethernet
Two external ports for a four-port Gigabit
Ethernet switched network connecting the interactive display and the iQ appliance to an external network and an external device such as a computer
Presence detection
Audio: 10 W integrated speakers
Pen (x2)
Eraser
USB Cable
Power Cable
Mounting Holes
Software: SMART Learning Suite (Meeting
Pro)
Connectors:
OPS slot (for the iQ appliance)
Stereo 3.5 mm out
S/PDIF out
Stereo 3.5 mm in
VGA in
HDMI 2.0 in (x2)
DisplayPort in
USB Type-B (×4)
USB Type-A (x3)
RJ45 (×2)
USB 3.0 Type-A (×2)
USB 2.0 Type-B4
USB 2.0 Type-B
HDCP encrypted HDMI out
AC power in
AC power out size, taking up no more than 15” x 7” of the desktop surface on the lectern.
Must be able to be controlled via RS232 serial cable.
Must have a lamp source of an LED light, to avoid frequent expenses to change bulbs.
Must have an auto and manual focus capability and 16X digital zoom (or better).
Must have the following input/output connections:
1080p (1920 x 1080) HDMI Output
USB
RGB Input/Output: 15-Pins D-sub
(VGA)
RS-232
DC 12V Input
VGA Input/Output
Composite Video: RCA Jack
DN-500BD Denon Professional Rack-mountable Blu-ray Player Broadcast grade blu-ray player
Rack mountable
Capable of playing back a variety of formats
Controlled by Crestron controller
CRE-TT-
101-B-T
Cable Caddy w/cables and 120v power Flush tabletop mount in a 4 inch (102
mm) round hole, 1/2 to 1-1/4 inch (13 to
32 mm) surface thickness
Provides pass-thru holes for up to four cables
HDMI, Type A, 6 ft (1.8 m)
Stereo Audio, 3.5mm TRS, 6 ft (1.8 m)
LAN, Shielded CAT5e, RJ45, 7 ft
(2.1 m)
NEMA 5-15R grounded AC power
APPENDIX G
DCMT and MEDLOG: Small Lectern and Interactive Display
1.0 PROJECT INFORMATION: This requirement shall furnish and install 1 new 33” lectern, 1 document camera, and 2-84” mobile, floor stand mounted, interactive displays in buildings
2640 and 1394 at the Medical Education and Training Campus on Fort Sam Houston (Table I for specific location information). Additionally, this requirement shall furnish and install a standalone cabinet in building 1394 to house a government furnished Crestron DMPS, 7”
Crestron Touch Screen, Crestron Digital Media Receiver and Room Controllers, and PoE
Switch. The Contractor shall provide all management, tools, supplies, equipment, labor, materials and documentation required including final design and labor required for the engineering, installation, and testing of this project. Equipment shall be the most up-to-date training equipment possible to support current and future instructors and trainees.
shall include notebook connectivity (network and A/V), document camera, Blu-Ray player, allocated spacing and connectivity for a government provided PC and annotation over any presented image and auxiliary audio visual connections, and confidence monitor capabilities.
Integrate new capabilities into existing audio/video infrastructure and ensure proper operation of
Coordinate with the Government PM prior to the infrastructure installation start date to determine that the site is ready for installation. Remove and dispose of all existing irrelevant infrastructure cabling once new infrastructure cabling for screens, sound systems, and projectors are installed, labeled, tested, and accepted. Prior to the infrastructure installation start date, a joint site inspection by the Contractor and Government Representative shall be held to verify
NOTE: On-site storage of project material is limited but available with coordination through
Government Representative. Upon completion of installation and final testing of system and infrastructure components, provide system documentation (user guides), applicable system code;
wireless components. The lectern shall be equipped with an input/output box for connectivity with existing infrastructure. The lectern shall have a cooling fan for the PC to draw cool air and a 21.5” preview monitor along with an HDMI cable for an external laptop computer. The lectern shall have convenient auxiliary AV cables for composite video and stereo audio cabling with RCA cables. The lectern shall contain a 7” touch-screen system control device that allows lectern control system. All standard functions of connected peripherals will be controlled by the touch panel. All standard user functions will be limited to one page on the touch panel.
Technician/administrative functions will be located on additional pages that will be password
Blu-
Ray Doc Cam
Interactive
Display
Small
Lectern Cabinet
MIF-8 (2640)
ROOM
122 1 1 1
Dunlap Hall
(1394)
ROOM
238 1 1 1 1
Total: 1 2 1
Flat top, 33” work surface
Thermostatically controlled internal fans for dust and temperature control to ensure temperature remains between 85º and 87º at all times, with three year warranty
Articulating monitor arm for 21.5” interactive display
4” round cut-out for cable caddy and connector cables
Solid steel AV rack-frame
Lectern skin shall be capable of replacement without requirement of full
Stand Alone AV Equipment
Cabinet 19 RU (or larger)
Minimum Depth U S: 31.35”
Minimum Height U S: 39.5”
Minimum Width U S: 24.5”
Finish: Ebony Ash
8084i-G4-
SMP
Interactive Display 84” or larger Display
Optimal Interaction
HyPr Touch Technology
10 simultaneous touch, writing, erase points
Pen ID
Display:
Type LED
Aspect ratio 16:9
Optimal resolution 3840 × 2160 at 60 Hz
Horizontal frequency (typical) 135 kHz
Vertical frequency (typical) 60 Hz
Contrast ratio (typical) 5000:1
Brightness (maximum) 360 cd/m²
Pixel pitch 0.429 mm × 0.429 mm
Gamut 72% of NTSC
Viewing angle 178°
Response time (typical) 8 ms
1000BASE-T Ethernet
Two external ports for a four-port Gigabit
Ethernet switched network connecting the interactive display and the iQ appliance to an external network and an external device such as a computer
Presence detection
Audio: 10 W integrated speakers
Pen (x2)
Eraser
USB Cable
Power Cable
Mounting Holes
Software: SMART Learning Suite (Meeting
Pro)
Connectors:
OPS slot (for the iQ appliance)
Stereo 3.5 mm out
S/PDIF out
Stereo 3.5…
This is the start of the file's text. The full file is on GovTribe.