7_-_Attch_7_-_Appendix_F_Drawings_New_Pad.pdf

PDF 758 KB Posted

Attached to
JBSA Randolph Airfield Repair Federal contract opportunity
Solicitation number
FA3016-16-R-0022
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 7

View the file

Other files for this federal contract opportunity

Other files attached to JBSA Randolph Airfield Repair, newest first.
File Type Posted
FA3016-16-R-0022_0002.pdf PDF
Post_Site_Visit_Questions.docx DOCX document
16_-_Attch_16_-_Contractor_Responsibility_Questionaire.docx DOCX document
Amend_1.pdf PDF
1_-_Attch_1_-_FA3016-16-R-0022_SOW_Revised_5_April_2016.doc DOC document
Attachment_10_-_Progress_Schedule.xlsx XLSX spreadsheet
12_-_Attch_12_-_RMD_(alternate_display).pdf PDF
5_-_Attch_5_-_Appendix_D_Existing_Randolph_14L-32R_Overrun_Drawings.pdf PDF
2_-_Attch_2_-_Appendix_A_Specifications.zip ZIP file
6_-_Attch_6_-_Appendix_E_Engineering_Technical_Letter.pdf PDF
11_-_Attch_11_-_Schedule_of_Submittals.xlsx XLSX spreadsheet
3_-_Attch_3_-_Appendix_B_East_Apron_Drawings.pdf PDF
16_-_Attch_16_-_Past_Performance_Questionaire.docx DOCX document
15_-_Attch_15_-_Financial_Information_Questionaire.docx DOCX document
14_-_Attch_14_-_Base_Pass_Request_Form.docx DOCX document
17_-_Attch_17_-_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
FA3016-R-16-0022.pdf PDF
4_-_Attch_4_-_Appendix_C_East_Apron_Specifications.zip ZIP file
1_-_Attch_1_-_FA3016-16-R-0022_SOW_(25_pages).doc DOC document
13_-_Attch_13_-_Wage_Determination.pdf PDF
12_-_Attch_12_-_Recovered_Material_Determination.xfdl XFDL file
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12.5'

20'

12"

(TYP)

12"

(TYP)

12"

(TYP)

12"

(TYP)

30"

24"

15"

21"

DOWEL

1" DIA

16" LONG

12" O.C.

(TYP)

56 TOTAL DOWELS

#4 REBAR

12" O.C. E.W.

3" CLEAR ON ENDS

LONG BAR ON TOP

SHORT BAR ON BOTTOM

(TYP)

15"

21"

30"

24"

N

FA3016-16-R-0022 ATTACHMENT 7

Pavement Marking Plan New Power Check Pad Southwest Apron

NEW POWER

CHECK PAD

Completely remove all existing lines, paint, markings, within red box.

Removal Diagram

22 ft

265 ft

240 ft

200 ft

Proposed Anchor location

22 ft

38 ft

75 ft

225 ft

230 ft

90 ft

Paint Diagram

2” black line with 1” Anchor Limit lettering pointing 355 degrees

155 degrees

2” black line with 1” Anchor Limit lettering pointing 315 degrees

2” black line with 1” “Anchor Limit” lettering pointing 175 degrees

2” black line with 1” “Anchor” Limit lettering pointing 135 degrees

3 ft break

T-6 ANCHOR

PAINT “T-6 ANCHOR” IN BLACK 1”

LETTERS

Degree angle

Paint Detail Diagram

ANCHOR INSTALLED RUNNING

155/335 DEGREES

Anchor Limit Anchor Limit

PAINT WHITE

THRUST ANCHOR MOORING

2" 2"18"

PAINT RED

PAINT "10,000 lb THRUST WORKING LOAD"

IN 1" BLACK LETTERS

ANCHOR

10,000 lb THRUST

WORKING LOAD

HAND ACCESS WELL

" DIA STEEL ANCHOR

AISI 8620H STEEL

VIEW FROM E TO W

3"

2"

2"

8-1/2"

1-1/4"

HAND ACCESS

WELL BELOW LOOP

REBAR

" DIA STEEL ANCHOR

AISI 8620H STEEL

VIEW FROM N TO S

3"

2"

2"

8-1/2"

HAND ACCESS

WELL BELOW LOOP

8" APPROX

" DIA STEEL ANCHOR

AISI 8620H STEEL

(SHOWN AT AN ANGLE)

VIEW FROM SE TO NW

3"

2"

2"

8-1/2"

1-1/4"

HAND ACCESS

WELL BELOW LOOP

4-1/4"

3"

8"

1" DIA DOWEL

16" LONG

6.25'

#4 REBAR

12" ON CENTER

3-3/4"

36"

7.5"

3" RADIUS

3" RADIUS

3"

RADIUS

" DIA ROD

AISI 8620H STEEL

ANCHOR

Randolph T-6 Plan view
T-6 Pwr Ck Pad Marking Diagram
THRUST ANCHOR
VIEW E TO W
VIEW N TO S
VIEW SE TO NW