Notes_from_Misting_Fans_Installation_Site_Visit.docx
DOCX document 13 KB Posted
- Attached to
- Misting Fans and Installation Federal contract opportunity
- Solicitation number
- FA3016-16-N-0177
About this file
Site visit notes from items discussed at site visit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Range_(Points)_Facilities.xlsx | XLSX spreadsheet | |
| RFQ_-_Misting_Fans_Installation.docx | DOCX document | |
| Vendor_Questions_ _Answers.docx | DOCX document | |
| RFQ_-_Misting_Fans_Installation.docx | DOCX document | |
| RFQ_-_Misting_Fans_Installation.docx | DOCX document | |
| Map_to_Bldg_950.pptx | PPTX presentation | |
| SOW_Misting_Fans.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notes from Misting Fans Installation Site Visit (31 August 2016)
· Misters must be installed in front of the oscillating fans
· Misters/fans must be equally spaced at each facility
· All wiring must be enclosed in conduit (no exposed wires); PVC can be used for everything else
· No footing (such as concrete) is needed for tank/stand
· No height restrictions for metal stand; tank just needs to be off the ground
· Shut off valves on the misters are required in case repair is needed on one, it can be bypassed
· Digging permit must be obtained as soon as award is offered. Coordinate with customer after award