Attachment_8_-_Addendum_1_-_19_JUL.pdf
PDF 16 KB Posted
- Attached to
- Fiber Optic Installation Federal contract opportunity
- Solicitation number
- FA3010-18-R-0026
About this file
Please see attached
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0004.pdf | ||
| Amend_3.pdf | ||
| Attachment_9_-Addendum_1A_-_26_JUL.pdf | ||
| Amend_2.pdf | ||
| Attachment_5_-_Reference_List.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_3_-_Wage_Det_MS141.pdf | ||
| Attachment_6_-_Notice_of_Compliance.pdf | ||
| FA301018R0026.pdf | ||
| Attachment_7_-_SF_1444.pdf | ||
| Attachment_2_-_SOW_FOC_from_B2801_to_B1101__2018-00235_Rev__20_Jun_2018.pdf | ||
| Attachment_1_-_SOW_FOC_from_B2801_to_B1002__Rev_20_Jun_2018.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19 July 2018
ADDENDUM NO. 1
C2-DS-FOC for B1002 Stennis Hall, and B1101 (ITN) from B2801 (ITN) Keesler Air Force Base Biloxi, Mississippi
This Addendum consists of 2 pages, 1 Specification Sections and 0 Drawing Sheets.
CHANGES TO ALL PROJECTS:
1. SOW: ALL; References to 38 ES:
Reference to the 38th ES are outdated.
Finding:
SOWs not consistent with current requirements.
SOLUTION/CHANGES TO ORIGINAL PROJECT MANUAL:
All references to 38th ES will be disregarded.
2. SOW: ALL; References to Maintenance Hole sizes:
All references to Maintenance Hole sizes being 6 feet by 12 feet by 7 feet (6’ x 12’ x 7’).
SOWs not consistent with current Maintenance Hole size requirements.
All Maintenance Holes will be at minimum 6 feet by 6 feet by 6 feet (6’ x 6’ x 6’).
Note: This does not change Hand Hole sizes. This remains at 4’ x 4’ x 4’.
3. SOW: B1002; Section 2.2.10.1: Fiber Optic Cable Installation:
The Contractor shall provide and install one (1) 12 strand SM FOC (12L8.3F) from Bldg 2801 to Bldg 1002 Room 129 IAW Figures 1 & 2. The distance is approximately 1850 feet. Leave a 25 foot maintenance coil in MH-2801-3 unless directed otherwise by 81 CS/SCX. The new FOC shall utilize any existing vacant innerduct and/or flexible geotextile multiple cell innerduct in the maintenance holes along this route.
SOW’s wording not consistent with requirements.
The Contractor shall provide and install one (1) 12 strand SM FOC (12L8.3F) from Bldg 2801 to Bldg 1002 Room 129 IAW Figures 1 & 2. The distance is approximately 1850 feet. The Contractor shall provide and install 2 - 3’’ ducts, Innerducts or flex ducts filled with 2, 3’’ 3-cell max-cell (Two three-cell max-cells at three inches) from MH-2801-5 to
Bldg 1002 Room 129 IAW Figure 1 & 2. Leave a 25 foot maintenance coil in MH-2801- 3 unless directed otherwise by 81 CS/SCX. The new FOC shall utilize any existing