Attachment_8_-_Addendum_1_-_19_JUL.pdf

PDF 16 KB Posted

Attached to
Fiber Optic Installation Federal contract opportunity
Solicitation number
FA3010-18-R-0026
Issued by
Department of the Air Force Air Education and Training Command

About this file

Please see attached

View the file

Other files for this federal contract opportunity

Other files attached to Fiber Optic Installation, newest first.
File Type Posted
Amend_0004.pdf PDF
Amend_3.pdf PDF
Attachment_9_-Addendum_1A_-_26_JUL.pdf PDF
Amend_2.pdf PDF
Attachment_5_-_Reference_List.pdf PDF
Attachment_4_-_Past_Performance_Questionnaire.pdf PDF
Attachment_3_-_Wage_Det_MS141.pdf PDF
Attachment_6_-_Notice_of_Compliance.pdf PDF
FA301018R0026.pdf PDF
Attachment_7_-_SF_1444.pdf PDF
Attachment_2_-_SOW_FOC_from_B2801_to_B1101__2018-00235_Rev__20_Jun_2018.pdf PDF
Attachment_1_-_SOW_FOC_from_B2801_to_B1002__Rev_20_Jun_2018.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 July 2018

ADDENDUM NO. 1

C2-DS-FOC for B1002 Stennis Hall, and B1101 (ITN) from B2801 (ITN) Keesler Air Force Base Biloxi, Mississippi

This Addendum consists of 2 pages, 1 Specification Sections and 0 Drawing Sheets.

CHANGES TO ALL PROJECTS:

1. SOW: ALL; References to 38 ES:

Reference to the 38th ES are outdated.

Finding:

SOWs not consistent with current requirements.

SOLUTION/CHANGES TO ORIGINAL PROJECT MANUAL:

All references to 38th ES will be disregarded.

2. SOW: ALL; References to Maintenance Hole sizes:

All references to Maintenance Hole sizes being 6 feet by 12 feet by 7 feet (6’ x 12’ x 7’).

SOWs not consistent with current Maintenance Hole size requirements.

All Maintenance Holes will be at minimum 6 feet by 6 feet by 6 feet (6’ x 6’ x 6’).

Note: This does not change Hand Hole sizes. This remains at 4’ x 4’ x 4’.

3. SOW: B1002; Section 2.2.10.1: Fiber Optic Cable Installation:

The Contractor shall provide and install one (1) 12 strand SM FOC (12L8.3F) from Bldg 2801 to Bldg 1002 Room 129 IAW Figures 1 & 2. The distance is approximately 1850 feet. Leave a 25 foot maintenance coil in MH-2801-3 unless directed otherwise by 81 CS/SCX. The new FOC shall utilize any existing vacant innerduct and/or flexible geotextile multiple cell innerduct in the maintenance holes along this route.

SOW’s wording not consistent with requirements.

The Contractor shall provide and install one (1) 12 strand SM FOC (12L8.3F) from Bldg 2801 to Bldg 1002 Room 129 IAW Figures 1 & 2. The distance is approximately 1850 feet. The Contractor shall provide and install 2 - 3’’ ducts, Innerducts or flex ducts filled with 2, 3’’ 3-cell max-cell (Two three-cell max-cells at three inches) from MH-2801-5 to

Bldg 1002 Room 129 IAW Figure 1 & 2. Leave a 25 foot maintenance coil in MH-2801- 3 unless directed otherwise by 81 CS/SCX. The new FOC shall utilize any existing

File details come from the government source that posted it.