Answers.doc

DOC document 27 KB Posted

Attached to
Repair Bldgs 2503, 2504, 2505
Solicitation number
FA301017R0006A
Issued by

About this file

Questions & Answers

View the file

Other files

File Type Posted
Amendment_00003.pdf PDF
Attachment_10_Addendum_0001.pdf PDF
Amendment_00002.pdf PDF
Pre_Con_Sign_In_Redacted.pdf PDF
Amendment_00001.pdf PDF
Attachment_1_Specifications.pdf PDF
Attachment_7_Notice_of_Compliance.pdf PDF
Attachment_8_Wage_Determination.pdf PDF
Attachment_5_Reference_List.docx DOCX document
Attachment_2_Drawings_1.pdf PDF
Attachment_4_Performance_Questionnaire.doc DOC document
17R0006_Sol.pdf PDF
Attachment_3_Drawing_2.pdf PDF
Attachment_6_SF_1444.pdf PDF
Attachment_9_SOW.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA3010-17-R-0006 Storm Damage Repair 2500 Block

Questions & Answers

Question 1: What information should an Offer present to validate or apply for a "Neutral Confidence evaluation?

A- The rating is based on the past performance information and questionnaires received with the proposal and based on the evaluation of that past performance.

Question 2: Referencing the Repairs to the gutter system: can you provide a detailed sketch that accurately describes what the finished product should look like and the procedure required to achieve the desired look?

A- See proposed sketch. Procedure would be similar to the following:

1- Cut the EPDM liner about 3" down from the roof edge and secure it out of the way

2- Install the peel and stick as shown, extending down the and over the structural metal gutter and up and over the existing cap blocking.

3- Mechanically fasten a folded metal clip on the roof side just under the existing roof.

4- Once the new metal gutter is placed and integrated with the downspouts, the metal clip would be folded back down sandwiching the roof side gutter wall in place.

5- Then a continuous clip is mechanically fastened on top of the gutter and peel and stick covering the wall cap blocking.

6- Add a roof cap to match the existing.

7- Finally the existing strip of EPDM liner can be allowed to overlap the top of the gutter, clip, and peel and stick.

Question 3: Will all the tiles where the vending machines are, need to be replaced?

A- Remove those that are loose (approximately 2 floor and 4 base) and any additional base tiles necessary to patch and repair the wall (approximately 4). Reuse existing tile and match existing grout.