Answers.doc
DOC document 27 KB Posted
- Attached to
- Repair Bldgs 2503, 2504, 2505
- Solicitation number
- FA301017R0006A
About this file
Questions & Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_00003.pdf | ||
| Attachment_10_Addendum_0001.pdf | ||
| Amendment_00002.pdf | ||
| Pre_Con_Sign_In_Redacted.pdf | ||
| Amendment_00001.pdf | ||
| Attachment_1_Specifications.pdf | ||
| Attachment_7_Notice_of_Compliance.pdf | ||
| Attachment_8_Wage_Determination.pdf | ||
| Attachment_5_Reference_List.docx | DOCX document | |
| Attachment_2_Drawings_1.pdf | ||
| Attachment_4_Performance_Questionnaire.doc | DOC document | |
| 17R0006_Sol.pdf | ||
| Attachment_3_Drawing_2.pdf | ||
| Attachment_6_SF_1444.pdf | ||
| Attachment_9_SOW.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA3010-17-R-0006 Storm Damage Repair 2500 Block
Questions & Answers
Question 1: What information should an Offer present to validate or apply for a "Neutral Confidence evaluation?
A- The rating is based on the past performance information and questionnaires received with the proposal and based on the evaluation of that past performance.
Question 2: Referencing the Repairs to the gutter system: can you provide a detailed sketch that accurately describes what the finished product should look like and the procedure required to achieve the desired look?
A- See proposed sketch. Procedure would be similar to the following:
1- Cut the EPDM liner about 3" down from the roof edge and secure it out of the way
2- Install the peel and stick as shown, extending down the and over the structural metal gutter and up and over the existing cap blocking.
3- Mechanically fasten a folded metal clip on the roof side just under the existing roof.
4- Once the new metal gutter is placed and integrated with the downspouts, the metal clip would be folded back down sandwiching the roof side gutter wall in place.
5- Then a continuous clip is mechanically fastened on top of the gutter and peel and stick covering the wall cap blocking.
6- Add a roof cap to match the existing.
7- Finally the existing strip of EPDM liner can be allowed to overlap the top of the gutter, clip, and peel and stick.
Question 3: Will all the tiles where the vending machines are, need to be replaced?
A- Remove those that are loose (approximately 2 floor and 4 base) and any additional base tiles necessary to patch and repair the wall (approximately 4). Reuse existing tile and match existing grout.