Wage Det.doc
DOC document 35 KB Posted
- Attached to
- VAV Controls Replacement Federal contract opportunity
- Solicitation number
- FA3010-10-R-0011
About this file
Attachment 2 on Section J.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3010-10-R-0011 Amend 0001.pdf | ||
| RFI RESPONSES 10 AUG 10.docx | DOCX document | |
| First and Second Floor Drawings.pdf | ||
| Past Performance Reference List Attach 4.rtf | RTF text file | |
| FA3010-10-R-0011 Solicitation.pdf | ||
| Performance Questionnaire.doc | DOC document | |
| FINAL SPECIFICATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA3010-10-R-0011
Attachment # 2
General Decision Number: MS100162 06/04/2010 MS162
Superseded General Decision Number: MS20080162
State: Mississippi
Construction Type: Building
County: Harrison County in Mississippi.
BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 03/12/2010
1 06/04/2010
* ELEC0903-002 06/01/2010
Rates Fringes
Electrician (including the low voltage wiring for and installation of temperature controls for HVAC systems).......$ 23.60 6.83
* IRON0058-009 06/01/2010
Rates Fringes
IRONWORKER, Structural and
Ornamental (Excluding Metal
Building Assembly/Erection)......$ 19.85 7.67
* PLUM0568-001 05/01/2010
Rates Fringes
PLUMBER (including HVAC pipe)....$ 22.75 7.71
SHEE0214-008 08/01/2008
Rates Fringes
SHEET METAL WORKER (including
HVAC Duct).......................$ 20.72 7.83
SUMS2008-046 07/07/2008
Rates Fringes
BRICKLAYER.......................$ 22.00 0.02
CARPENTER, Including
Acoustical Ceiling, Cabinet
Installation, Drywall Hanging and Form Work....................$ 13.41 0.00
CEMENT MASON/CONCRETE FINISHER...$ 10.91 0.00
GLAZIER..........................$ 10.00 0.00
IRONWORKER, Structural (Metal
Building Assembly) Erection
Only.............................$ 11.90 0.00
LABORER: Common or General......$ 8.64 0.00
LABORER: Mason Tender - Brick...$ 10.00 0.00
OPERATOR: Blade/Grader, Including Finishing..............$ 12.50 1.57
OPERATOR: Backhoe...............$ 15.58 1.62
OPERATOR: Bulldozer.............$ 13.50 0.00
OPERATOR: Crane.................$ 16.73 0.92
OPERATOR: Excavator.............$ 11.33 0.00
OPERATOR: Forklift..............$ 11.75 1.61
OPERATOR: Trackhoe..............$ 14.50 0.00
PAINTER: Brush, Roller and
Spray............................$ 12.75 0.00
PIPEFITTER, Excluding HVAC
Pipe Installation................$ 21.83 0.00
ROOFER...........................$ 14.50 0.00
TRUCK DRIVER.....................$ 11.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of
Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the
Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .