PWS_-_Roof_Survey_and_Inspection.pdf

PDF 276 KB Posted

Attached to
Roof Survey and Inspection
Solicitation number
FA2860-15-R-0015
Issued by

About this file

Performance Work Statement Roof Survey and Inspection

View the file

Other files

File Type Posted
QUESTIONS_-_FA2860-15-R-0015.docx DOCX document
FA2860-15-R-0015.pdf PDF
Wage_Determination_2005-2103.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

For

Roof Survey and Inspection

11th CES/CEOES

Updated: 27 February 2015

1.0 DESCRIPTION OF SERVICES. The contractor shall furnish all personnel, labor, equipment, transportation, tools, materials, supplies, supervision, quality control, management and other items and services necessary to perform roof survey and inspection services & improvements, to include vegetative roof stewardship services, at Joint Base Andrews, Maryland (JBA) and its affiliated communication sites at Brandywine and Davidsonville, Maryland, in accordance with this Performance Work Statement

(PWS). The services provided shall act as a preventative maintenance measure toward the care of JBA facilities and shall allow for a more complete understanding of the roof system’s condition, which ultimately permits base personnel to better manage the entire roof system. Maintenance shall prevent:

structural damage; damage to interior components such as ceilings, walls, carpet, and equipment; mold growth and loss of personnel productivity. Additionally, regular maintenance shall prevent the need for costly full repair/replacement of the roof systems on JBA. The estimated quantities of work are listed in

Appendix A, titled Estimated Workload Data. The contractor shall provide roof survey and maintenance services & minor repairs to locations designated in Appendix A and comply with all local, state, and federal laws. All inspectors shall maintain roof inspector certification through the National Roof

Certification and Inspection Association (NRCIA) or equivalent certification.

1.1 Roof Inspection. An inspection checklist for each roof system type to be inspected during the course of the base wide survey shall be submitted by the roof contractor no later than 10 days after date of contract award for Contracting Officer Representative (COR) approval.

1.1.1 Visual Inspection. The roofing contractor shall perform a visual inspection in accordance with approved inspection checklist and verification of current roof system conditions of facilities listed in

Appendix A. Roof core cuts shall be made, on an as needed basis, to determine the roof system construction. Any roof core cuts shall be patched the same day the core is taken with appropriate materials to ensure a water tight seal.

1.1.2 Moisture Inspection. The contractor shall provide infrared thermography imaging to detect and identify potential problems related to moisture infiltration and to identify the possible source of infiltration. Fly over inspection will not be permitted on JBA. Contractor shall notify the COR of newly discovered areas of moisture infiltration when identified so that measures can be taken by the government to prevent further damage. All information shall be included in the roof report as well.

1.2 Roof Report. The roof report should include at a minimum:

1. Roof type with associated area in square feet.

2. Descriptions and photographs of all observed roof deficiencies.

3. Sloped metal roof systems shall be evaluated with recommendations as to what should be done to correct poor detailing and terminations where possible.

4. Roof plan drawings to include, but not limited to, basic layout with associated pitches, location of equipment and penetrations.

5. Recommendations and a brief scope of work with estimated budget shall be provided for all roof systems.

6. Report to be submitted in three (3) copies.

7. Shall be submitted within five (5) days of roof inspection.

All roofs shall be cataloged based on current roof conditions using the following color code system:

Green – remaining performance life of 7+ years.

Amber – remaining performance life of 4 to 7 years.

Red – roof systems with less than 3 years of life remaining.

1.3 Roof Data. All roof inspection data shall be contained in an online database system that can be easily accessed by JBA. The roof database shall be required to interface with the JBA GIS/GeoBase system

Version 10.0 or above. Data shall be inputted into system no later than five (5) working days after inspection.

1.4 Preventive Maintenance/Repair. Minor repair of flashings and metal edges along perimeters and units to include minor tears, splits and breaks in membrane flashing to be repaired with appropriate repair mastic and membrane. All accumulative repairs not to exceed 1000 sq ft, costs shall be included in Debris

Removal and Visual Inspection line item. Preventive Maintenance/Repair should include the following items:

Metal Edge Cleats and clips shall be re-secured, if necessary.

Coat all exposed reinforcing membrane with approved mastic.

Re-secure termination bars and counter flashing, as needed.

All pitch pans shall be refilled and topped off.

Check and re-secure drain bolts and clamping rings, as needed.

Check strip-in drain leads, coat with approved mastics, if needed.

When approved, a work order will be provided to the contractor for minor repairs.

1.5 Work Orders. When approved and funded by the Government, a work order may be issued to the contractor for roof repairs identified during visual inspection that exceed the threshold in paragraph 1.4.

This work is not guaranteed to the contractor and will be solely determined by the Government. When approved, the contractor will charge the Government for man-hours and reimbursable materials on the appropriate CLINs IAW paragraph 4.11 and 4.11.1. More than one requirement may be included on a work order. The COR will establish a required completion date for each work order. The contractor shall inspect the job prior to close out to ensure all requirements were met. After completion, the contractor shall notify the COR to schedule an acceptance services inspection.

1.6 Vegetative Roof Systems. Contractor shall evaluate and provide a stewardship program to maintain health of living roof as well as establish a nondestructive inspection for the membrane beneath the living parts of the roof.

1.6.1 Stewardship Program. The Stewardship program shall include, but is not limited to providing:

Regular inspection of membrane, waterproofing, seals and flashings for leakages

Regular inspection and cleaning of drainage appurtenances

Plant inspection for disease or nutrient deficiency and replacement as necessary to maintain 80- to 90-percent coverage

Seasonal removal of weeds

Application of protection methods against pests

Application of slow-release fertilizer, depending on plant requirements

Provide supplemental growing medium on areas if needed

Irrigation, replanting, aeration, and replacing eroded media for all vegetative roofs as needed.

1.6.2 Inspection Frequency. All vegetative roofs need to be inspected quarterly (every 3-4 months) to insure no issues need to be addressed from 1.6.1.

1.6.3 Work Order. A work order shall be issued to the contractor by the COR for performance of services that are non-recurring or regularly scheduled (i.e. vegetative roof plant replacement, minor membrane repairs, flashing repair etc.). More than one requirement may be included on a work order.

When approved, the contractor will charge the government for man-hours and reimbursable materials on the appropriate CLINs. The COR will establish a required completion date for each work order. The contractor shall inspect the job prior to close out to ensure all requirements were met. After completion, the contractor shall notify the COR to schedule an acceptance services inspection.

1.6.4 Reimbursable Materials. Plant materials and media for vegetative roofs and materials used for work orders issued for roof repairs shall be reimbursed at 100% contractors cost by the government IAW paragraph 4.11. and 4.11.1. The contractor shall provide no less than, a one (1) year warranty from the nurseries or growers from which all new plant materials are purchased. The contractor shall be responsible for replacing any defective plant within appropriated period of such warranty. These warranties shall include labor cost for removal and replacement.

1.7 Warranty. Provide JBA with a one (1) year performance warranty on approximately 500,000 square feet of roof systems that are categorized as green or amber. The specific roof systems to be warranted shall be selected by Civil Engineering personnel from the attached roof inspection listing following the initial inspection. In the event that a roof leak occurs in a roof system covered under a performance warranty, the contractor shall respond within 48 hours to correct the roof leak. If the leak is an emergency, the contractor shall respond within four (4) hours, during normal operating hours after the call is placed. The contractor is responsible for all costs of the leak repair. Roof leaks caused by acts of God, owner abuse, unauthorized alterations or installation of roof top equipment/penetrations shall not be required to be covered under the performance warranty. COR must be notified if and when this determination is made. The sloped metal roof systems with poor detailing and terminations, as well as roof systems coded in the Red category shall not be required to be covered for the roof leaks.

1.8 Contractor Requirements

1.8.1 Debris Removal. Debris shall be removed in a timely manner but no later than the contractor’s daily departure. Debris shall be removed using the contractor supplied dumpsters/containers/trucks for hauling and disposal to the JBA designated location. Surrounding areas shall be clean and neat in appearance. The contractor shall be responsible for bringing refuse to the identified dumpsters. The

Contractor shall not dispose of flammable liquids, batteries, tires mineral spirits, oil, lubricants and other flammable or hazardous material in base dumpsters. The contractor shall be required to comply with all installation recycling programs.

1.8.2 Materials. Materials utilized during preventive maintenance shall be of such composition and quality so as to be compatible with the respective roof coating as well as colored to match, as close as possible to the existing roof material. Contractor shall submit two (2) copies no later than five (5) days prior to use, of the manufacturer’s technical data bulletins, material safety data sheets (MSDS) and safety instructions on each product proposed for use. Contractor shall submit the required U.L. rating certification for each product proposed for use no later than five (5) days prior to use.

1.8.3 Power Outages. Power outages and limited utility interruptions shall be permitted in accordance with a previously arranged schedule. The contractor is responsible for notifying and coordinating all outages with the COR, who will coordinate with the Base Civil Engineer at least five (5) working days in advance of the intended outage.

1.8.4 Quality Control Report. The contractor shall produce a Quality Control Report no later than five

(5) days after inspection citing: date of roof inspection, representative’s name, outcomes, maintenance performed and recommendations for additional preventive measures derived from inspection results.

Contractor shall share any performance mechanisms/reports with the Government to ensure industry standards are met.

1.8.5 Work Stoppages. From time to time there will be work stoppages due to scheduled and unscheduled mission requirements (events). During times of work stoppage the roof inspection/maintenance work schedule shall be altered to work in other areas until the event is complete at which time roof inspection/maintenance work will be scheduled and accomplished.

2.0 SERVICES SUMMARY

Performance

Objectives

PWS Reference Performance Thresholds

Roof inspections of approved facilities.

1.1.1

1.6.2

Not to exceed one (1) customer complaint or one

(1) defect per month of inspection items included in approved checklist.

Core cuts patched same day.

Housekeeping conducted during inspections

1.8.1 Debris disposed of no later

than the contractor’s daily departure.

Provide stewardship program

1.6.1 Not to exceed one (1)

customer complaint or one

(1) defect per month of maintenance performed on specified items.

Preventive maintenance conducted during inspections

1.4 Not to exceed one (1)

customer complaint or one

(1) defect per month of preventative maintenance performed on specified items.

Submittal of reports and repair estimate

1.2

1.3

Reports include 95% of specified information and

3.0 GOVERNMENT FURNISHED PROPERTY

3.1 Government Furnished Property. None

3.2 Medical Services. Ambulance/ emergency medical services are available at JBA medical clinic. The contractor’s employee shall be billed directly and it is their responsibility to secure payment from their medical insurance.

3.3 Security Forces/Fire Protection. The Government will provide security police and fire protection to the extent necessary to ensure a safe and secure installation. In return for these services, the contractor shall adhere to security and fire directives, instruction and policies on JBA. The security forces law enforcement desk is located at building 1845 and the fire services are located at building 1287 & 3464.

4.0 GENERAL INFORMATION

4.1 Quality Control. The contractor shall submit a Quality Control Plan (QCP) within ten (10) days of contract award, outlining procedures to identify, prevent and ensure non-recurrence of defective services in accordance with the performance work statement, applicable standards and codes. As a minimum, the contractor shall develop quality control procedures that address the areas identified in 2.0 Services

Summary.

4.2. Quality Assurance. The Government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance. The Government representative will evaluate the contractor’s performance through intermittent on-site inspections of the contractor’s quality control program and receipt of complaints from base personnel. The Government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or repeated customer complaints.

Likewise, the Government may decrease the number of quality control inspections if performance dictates. The Government will also receive and investigate complaints from various customers located on the installation. The contractor shall be responsible for initially validating customer complaints. However, the Government representative shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s).

4.3 Work Schedule. The contractor shall establish a monthly work schedule to describe in detail all the efforts to accomplish required services identified in PWS and Appendix A throughout the month. Once the work schedule is received, at this time, if changes need to be made to reduce conflicts with the

Government operations, special events, or other occurrences, the contractor shall meet with the

1.8.4 submitted within five (5) days of roof inspection in three (3) copies.

Warranty of selected roof systems

1.7 Two (2) customer

complaints per month.

During emergencies covered under warranty shall respond within four

(4) hours, during normal operating hours after the call is placed.

Work Orders 1.5, 1.6.3 100% inspection 0 defects

Government and revise the schedule as necessary. The CO’s representative can request changes to the monthly work schedule so spacing of services is distributed to meet the needs of the Government. The contractor shall not be allowed to deviate from this schedule without prior approval from the COR.

4.4 Hours of Operation. Hours of operation are from 7:30 AM to 4:30 PM Monday thru Friday.

4.5 Federal Holidays. The following is a list of Federal Holidays observed by this installation:

New Year’s Day Labor Day Inauguration Day

Martin Luther King’s Birthday Columbus Day President’s Day

Veterans Day Memorial Day Thanksgiving Day

Independence Day Christmas Day

4.6 Security Requirements. All contractor employees shall carry contractor photo identification at all times. Contractor employees shall comply with any base security measures implemented at all times. This includes but is not limited to vehicle and goods searches and identification checks during times of increased security. All personnel employed by the contractor in performance of this contract, or any representative of the contractor entering the government installation, shall abide by all security regulations of the installation. The contractor should anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base. Procedures for commercial vehicle access to the base are subject to change without prior notice.

4.6.1 Contract Employees. The contractor shall be responsible for the action of any of their sub-contractors and their employees who are working on JBA. The contractor and sub-contractor, if hiring

U.S. citizen(s), shall ensure that they are in possession of a valid State driver’s license or State issued

Identification Card and birth certificate. If the employee/hiree is not a U.S. citizen, the contactor and/or subcontractor may hire non U.S. citizens if they are in possession of Green Card, Social Security Card, Resident Card, Work Visa and State issued Identification Card. If driving on base a State driver’s license and insurance is required.

4.6.2 Federal Criminal History Background Check. The contractor and all employees of the contractor requiring unescorted access to JBA controlled areas, to include all areas within the pathfinder fence, will be required to successfully undergo a Federal Criminal History Background Check and be fingerprinted.

The contractor shall be responsible for all costs associated with fingerprinting and the Federal Criminal

History Background Check. The authorization number is 00625G, and should be entered in the ORI space on the back of the blue card. For updated information on obtaining federal background checks visit the

MD Department of Public Safety and Correctional Services website at:

http://www.dpscs.state.md.us/publicservs/bgchecks.shtml or call the number below.

CJIS – Central Repository

6776 Reisterstown Road, Suite 102

Baltimore, MD 21215

Or

CJIS – Central Repository

P.O. Box 32708

Pikesville, MD 21282-2708 http://www.dpscs.state.md.us/publicservs/bgchecks.shtml

Contact CJIS at 410-764-4501 or toll free at 1-888-795-0011 if you have questions about the procedure or the associated fees.

4.6.3 Weapons. Weapons of any sort are not authorized on JBA, this includes guns, knives, swords, numb chucks, brass knuckles, or any other weapon that has a sole purpose to injure or maim.

Combination tools such as Leatherman and small pocket knives with folding blades less than four inches are authorized if used in the performance of duty. Those found in violation of this directive are subject to apprehension, criminal charges and debarment from the installation.

4.6.4 Illegal Controlled Substance: The U.S. Federal Government is the most vocal opponent of the drug industry and it has set the de facto international standards regarding the legality and illegality of different drugs. Illegal controlled substance and narcotics are not authorized on JBA what so ever, controlled substances may not be transported on the installation via vehicle or on an individual person, i.e., marijuana/Cannabis, cocaine, crack cocaine, LSD, Methamphetamine (Meth), Heroin, Anabolic steroids, Psilocybin mushrooms, are some of forbidden substances ( this list is not all inclusive).

Prescription medications are authorized for the person the medication is issued to; however the medication must not be expired and the label must clearly indicate the name of the person the medication is issued to. Otherwise the prescription medication may be deemed illegal by the law enforcement officials. Those found in violation of this directive are subject to apprehension, criminal charges and debarment from the installation.

4.6.5 Base Access. Identification cards and vehicle registrations shall be obtained from the Visitor

Control Center (building 1832) located at the main gate entrance of JBA. Owners must present valid drivers' licenses, current registration, proof of insurance, and any other information deemed necessary to obtain a vehicle pass. While on the premises of JBA or any of its affiliate sites, Contractor personnel shall represent themselves as non-government employees by conspicuously displaying badges at all times.

Lost vehicle and entry passes shall be reported immediately to Security Police, and the COR.

4.6.6 Physical Security. The contractor shall be responsible for safeguarding all government property provided for contractor’s use. At the end of each shift, all government facilities, equipment, and materials shall be secured. The contractor shall be responsible for providing and placing all barricades and safety devices during any activities and comply with all Occupational Safety and Health Standards (OSHA).

4.6.7 Retrieving Identification Media. The contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g., terminated for cause, retirement, etc. and return them to issuing COR or 11 Security Forces Squadron Visitor Control

Center personnel before final payment will be made.

4.7 Performance of Services during Crisis Declared By the National Command Authority or

Overseas Combatant Commander. In the event the contractor is unable to perform his daily operations due to peacetime emergency and/or wartime contingency disturbances, etc., neither the Government nor the contractor shall take action for non-compliance with contract requirements.

4.8 Safety. Contractor shall comply with all applicable OSHA and AFOSH standards.

4.9 Hazardous Material Identification. Material Safety Data Sheets (MSDS) are required as specified in the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract) for any other material designated by a government technical representative as potentially hazardous and requiring safety controls. MSDSs shall be submitted by the contractor at the pre-performance conference, and as necessary throughout the life of the contract. Failure to provide MSDSs or certificates when requested could result in unsatisfactory performance ratings and possible termination of the contract. Appendix A shows the proposed procedures for contractors requiring the use of radioactive material (RAM) and Radiation Generating Equipment of JBA.

4.10 Notification of Environmental Spills. If the contractor spills or releases any substance listed in 40

CFR 302, Designation, reportable Quantities, and Notification into the environment, the contractor shall immediately report the incident to the COR, and be familiar with and follow the most current “Base Spill

Plan” (a copy will be provided at the pre-performance conference). The contractor shall be held liable for the spill or release of substances. The contractor is responsible for advising his employees of all

Environmental and Hazardous Materials Handling and is also required to have and maintain Material

Safety Data Sheets (MSDS) on all materials that are required by state and federal laws and/or regulations, reference AFI 91-301 and OSHA requirements.

4.11 Contractor Purchased Items. The contractor shall be responsible for the acquisition of all materials and supplies to perform work under this contract and will be reimbursed by the Government for allowable costs. The contractor shall obtain and provide three (3) current market prices for each item submitted for

Government reimbursement over $2,500. However, the contractor shall obtain approval from the COR prior to purchasing any single item or combination of items. Additionally, the contractor shall comply with the Competition in Contracting Act by seeking competitive pricing for all items. Evidence of compliance must be made available to the Government upon request. The contractor is authorized to use available government sources of supply (e.g., GSA) for making such acquisitions.

4.11.1 Reimbursable Items. The contractor shall submit a reimbursable list of items to be preapproved by the COR/CO, with pricing and description. The contractor shall provide the COR with the original receipt for materials within five (5) days of purchase. The bill should be itemized and include the cost, date of purchase, vendors name and location. The contractor shall invoice for reimbursable materials and supplies (e.g. vegetative roof plants, slow-release fertilizer and growing medium etc), with the exception of fuels (petroleum based products) or items used for vehicle maintenance. Office supplies and parts are not reimbursable. Crains, lifts, latters and scaffolding are not reimbursable.

Additionally, the contractor must identify the following:

(1) Manufacturer or brand name of item

(2) Unit of issue

(3) Actual cost to contractor

(4) How item was used

Appendix A

Estimated Workload Data

292 Buildings, estimated 4,616,858 square feet of roof

Facility Roof Area

Quantity Unit of Measure

Brandywine 3,500 SQ FT

Davidsonville 1 22,340 SQ FT

656 1,300 SQ FT

819 560 SQ FT

1046 3,250 SQ FT

1051 45,000 SQ FT

1054 6,940 SQ FT

1076 3,200 SQ FT

1190 5,911 SQ FT

1191 10,490 SQ FT

1201 3,962 SQ FT

1202 7,600 SQ FT

1205 2,400 SQ FT

1206 2,263 SQ FT

1207 8,000 SQ FT

1208 4,020 SQ FT

1216 894 SQ FT

1217 12,900 SQ FT

1220 20,000 SQ FT

1223 10,400 SQ FT

1225 45,000 SQ FT

1228 43,700 SQ FT

1229 7,983 SQ FT

1234 11,800 SQ FT

1235 11,713 SQ FT

1236 9,542 SQ FT

1237 4,200 SQ FT

1238 650 SQ FT

1240 5,600 SQ FT

1241 190 SQ FT

1245 22,700 SQ FT

1279 89,000 SQ FT

1280 76,672 SQ FT

1281 4,500 SQ FT

1285 3,941 SQ FT

1287 17,926 SQ FT

1288 32,300 SQ FT

1290 2,200 SQ FT

1345 13,840 SQ FT

1349 9,100 SQ FT

1350 6,143 SQ FT

1351 3,523 SQ FT

1353 9,500 SQ FT

1358 7,400 SQ FT

1359 44,420 SQ FT

1380 63,300 SQ FT

1398 3,630 SQ FT

1413 22,000 SQ FT

1414 17,500 SQ FT

1417 7,156 SQ FT

1419 9,835 SQ FT

1420 5,054 SQ FT

1442 19,900 SQ FT

1443 300 SQ FT

1444 27,677 SQ FT

1445 26,595 SQ FT

1523 4,800 SQ FT

1526 240 SQ FT

1530 4,100 SQ FT

1531 2,900 SQ FT

1539 19,400 SQ FT

1558 75,500 SQ FT

1560 9,800 SQ FT

1565 600 SQ FT

1568 11,166 SQ FT

1600 31,200 SQ FT

1605 1,500 SQ FT

1618 19,200 SQ FT

1624 18,200 SQ FT

1628 18,000 SQ FT

1631 15,300 SQ FT

1642 15,400 SQ FT

1657 14,200 SQ FT

1658 30,430 SQ FT

1668 4,400 SQ FT

1673 9,000 SQ FT

1674 15,951 SQ FT

1676 15,394 SQ FT

1677 7,229 SQ FT

1682 5,908 SQ FT

1683 43,000 SQ FT

1684 122,483 SQ FT

1685 4,000 SQ FT

1690 17,500 SQ FT

1691 15,000 SQ FT

1692 11,000 SQ FT

1706 1,500 SQ FT

1708 6,150 SQ FT

1711 15,962 SQ FT

1713 2,365 SQ FT

1714 54,757 SQ FT

1731 2,300 SQ FT

1734 74,783 SQ FT

1735 8,649 SQ FT

1754 74,783 SQ FT

1771 1,060 SQ FT

1773 215 SQ FT

1778 8,200 SQ FT

1781 2,316 SQ FT

1783 15,282 SQ FT

1791 22,599 SQ FT

1794 74,783 SQ FT

1800 53,000 SQ FT

1805 20,700 SQ FT

1810 4,300 SQ FT

1811 114,000 SQ FT

1839 224 SQ FT

1841 170 SQ FT

1845 14,623 SQ FT

1864 398 SQ FT

1870 7,088 SQ FT

1889 44,048 SQ FT

1900 33,360 SQ FT

1911 8,100 SQ FT

1914 91,411 SQ FT

1915 23,000 SQ FT

1919 860 SQ FT

1931 11,201 SQ FT

1932 28,688 SQ FT

1933 10,413 SQ FT

1934 2,400 SQ FT

1937 7,150 SQ FT

1969 1,252 SQ FT

1988 334 SQ FT

2267 255 SQ FT

2487 8,113 SQ FT

2488 4,100 SQ FT

2489 39,400 SQ FT

2490 900 SQ FT

2492 1,000 SQ FT

2493 8,100 SQ FT

2495 13,000 SQ FT

2496 1,100 SQ FT

2497 3,150 SQ FT

2498 2,600 SQ FT

3001 12,700 SQ FT

3002 11,600 SQ FT

3004 13,100 SQ FT

3007 1,100 SQ FT

3014 1,938 SQ FT

3029 19,400 SQ FT

3030 8,300 SQ FT

3031 12,400 SQ FT

3032 5,600 SQ FT

3033 2,350 SQ FT

3034 2,100 SQ FT

3040 1,250 SQ FT

3041 4,100 SQ FT

3045 3,540 SQ FT

3046 5,200 SQ FT

3056 14,016 SQ FT

3066 125,000 SQ FT

3067 1,115 SQ FT

3068 514 SQ FT

3069 3,500 SQ FT

3070 4,000 SQ FT

3077 6,100 SQ FT

3086 89,100 SQ FT

3091 900 SQ FT

3092 1,519 SQ FT

3093 901 SQ FT

3094 2,300 SQ FT

3096 3,900 SQ FT

3106 4,100 SQ FT

3108 300 SQ FT

3109 13,100 SQ FT

3119 45,000 SQ FT

3121 6,700 SQ FT

3148 92,700 SQ FT

3149 6,000 SQ FT

3158 40,800 SQ FT

3160 850 SQ FT

3167 250 SQ FT

3188 119,000 SQ FT

3198 11,800 SQ FT

3212 27,400 SQ FT

3213 7,400 SQ FT

3214 4,200 SQ FT

3215 2,400 SQ FT

3216 400 SQ FT

3217 7,700 SQ FT

3218 2,200 SQ FT

3222 14,200 SQ FT

3227 7,200 SQ FT

3236 13,200 SQ FT

3252 28,500 SQ FT

3257 3,286 SQ FT

3282 25,000 SQ FT

3283 2,200 SQ FT

3285 2,400 SQ FT

3296 9,794 SQ FT

3304 2,400 SQ FT

3305 2,400 SQ FT

3307 3,100 SQ FT

3320 39,809 SQ FT

3342 1,678 SQ FT

3350 4,400 SQ FT

3351 2,400 SQ FT

3355 9,000 SQ FT

3356 2,900 SQ FT

3382 2,300 SQ FT

3410 320 SQ FT

3411 2,373 SQ FT

3415 7,200 SQ FT

3416 8,750 SQ FT

3417 9,794 SQ FT

3418 1,600 SQ FT

3422 15,247 SQ FT

3423 1,764 SQ FT

3424 12,304 SQ FT

3434 500 SQ FT

3440 1,200 SQ FT

3441 5,000 SQ FT

3442 1,920 SQ FT

3444 4,000 SQ FT

3445 9,680 SQ FT

3446 9,605 SQ FT

3447 3,200 SQ FT

3448 8,459 SQ FT

3449 14,164 SQ FT

3451 452 SQ FT

3458 529 SQ FT

3461 1,500 SQ FT

3464 10,788 SQ FT

3465 18,808 SQ FT

3466 5,400 SQ FT

3487 2,619 SQ FT

3500 51,300 SQ FT

3531 11,889 SQ FT

3537 7,960 SQ FT

3541 9,200 SQ FT

3547 5,000 SQ FT

3603 650 SQ FT

3605 640 SQ FT

3608 21,634 SQ FT

3613 8,600 SQ FT

3616 727 SQ FT

3617 8,500 SQ FT

3623 12,500 SQ FT

3629 23,223 SQ FT

3635 87,000 SQ FT

3639 5,200 SQ FT

3640 58,388 SQ FT

3642 1,220 SQ FT

3681 435 SQ FT

3705 16,562 SQ FT

3710 14,100 SQ FT

3715 2,624 SQ FT

3725 19,748 SQ FT

3743 6,500 SQ FT

3744 16,500 SQ FT

3745 1,658 SQ FT

3755 32,000 SQ FT

3756 4,000 SQ FT

3757 12,985 SQ FT

3758 2,300 SQ FT

3763 7,700 SQ FT

3765 11,000 SQ FT

3766 9,400 SQ FT

3767 2,000 SQ FT

3807 2,400 SQ FT

4442 16,978 SQ FT

4549 1,100 SQ FT

4575 22,223 SQ FT

4598 1,300 SQ FT

4693 720 SQ FT

4694 3,600 SQ FT

4700 30,391 SQ FT

4715 132 SQ FT

4779 380 SQ FT

4781 360 SQ FT

4783 26,500 SQ FT

4797 6,251 SQ FT

4798 9,679 SQ FT

4882 4,073 SQ FT

4883 1,500 SQ FT

4885 4,000 SQ FT

4886 1,800 SQ FT

4919 768 SQ FT

4923 3,200 SQ FT

4924 3,700 SQ FT

5013 1,567 SQ FT

5014 2,850 SQ FT

5015 2,400 SQ FT

5016 214,000 SQ FT

5019 1,500 SQ FT

5023 4,300 SQ FT

5026 37,000 SQ FT

5030 2,500 SQ FT

5032 162,750 SQ FT

1500* 89,613 SQ FT

3501* 52,631 SQ FT

Estimated Total 4,616,858 SQ FT

* Roofs with vegetative areas

Vegetative Roof

Facility Number

Building

Name SQ FT

Building 3501

ANGRC

HQ Vegetative Area

Vegetative:

26,800

Building 1500 AFDW HQ Vegetative Area

Vegetative:

50,898

Estimated Vegetative total 77,698

File details come from the government source that posted it. Updated .