Questions and Answers-Lundy Doors.docx
DOCX document 14 KB Posted
- Attached to
- Lundy Door Replacement
- Solicitation number
- FA283525P0017
About this file
This document is a Questions and Answers file for the Lundy Door Replacement solicitation (FA283525P0017). The key detail addressed is manufacturer certification, with the government clarifying that installers must be GSA certified. Specifically, the response confirms that both B&S and NSI Aric are GSA-certified installers located in the local area. The related solicitation involves replacing metal double doors in the Lundy Auditorium (Building 1614) at an Air Force Base, with requirements that the new doors must achieve an STC-50 or better sound attenuation rating. The project is being managed by the Department of the Air Force Materiel Command Lifecycle Management Center at Hanscom Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers-Lundy Doors.docx | DOCX document | |
| FA283525P0017 Lundy Doors ComboSynopsis.pdf | ||
| Bid Schedule - Lundy Doors.xlsx | XLSX spreadsheet | |
| Statement of Work - Lundy STC Door Replacement_RevD.pdf | ||
| Wage Determination 2015-4053.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
Could you please confirm whether manufacturer certification would be acceptable in lieu of GSA certification for this scope of work?
Answers Installers need to be GSA certified.
Both B&S and NSI Aric mentioned below are GSA certified and in the local area.