Statement of Work Dated 15 Dec 2015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_and_A_Asbestos_Removal_B1721.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Remove Asbestos- Men’s Room
Location Building: 1721
By: Lenore Gerossie
WORK ORDER NUMBER: 66164
DATED: 15 December 2015
1. GENERAL INFORMATION:
This project is intended to remove asbestos in men’s room wall in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the
Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply.
2. SCOPE: Demo wall and Remove Asbestos piping in Men’s Room
Prior to start of work
Submit copies of Abatement Work Plan, Notification, Licenses, and Lab
Certification to Environmental Office
Ensure HAFB Environmental contractor guide is followed
Send in State Notifications (10 day period)
Set up containment as required by regulations
Provide any required monitors and air samples
Protect floor, ceilings and adjacent walls from being damaged during demo
Remove wall 14ft. by 9 ft. ceramic tile wall behind sink in men’s room
Remove( 2) 4ft lights above mirror and dispose of
Remove mirror 4ft x 10 ft. and dispose of
Remove (4) sinks and counter and dispose (CE to shut off water)
Remove( 4) outlets and dispose of
Remove 4” CMU wall that is behind mirror and dispose
Remove 2 rows of ceiling tiles above sink and dispose of
Remove approx... 100 linear feet of 3”asbestos from pipes
Remove all asbestos in wall cavity that may have dislodged from water pipes
Ceiling hung heater to stay in place
Remediate up to hard ceiling approx. 10 ft. high seal encapsulate at hard ceiling/wall
Remove containment and properly dispose of material generated
Manifests and coordination through CE/Environmental
3. GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Provide three (3) copies of O & M manuals and warranty letter
f. Period of Performance 60 days after award date
g. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form.
4. ADMINISTRATION:
Points of Contact (POC):
Lead: Lenore Gerossie Phone Number. (781) 225-2960
Alternate POC: Paul Derocher Phone Number. (781) 225-2962