Attch_23_Task_Order_0001_Statement_of_Objectives.docx
DOCX document 956 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA2823-15-R-4002
About this file
Attachment 23 Task Order 0001 Statement of Objectives
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 96TH TEST WING (AFMC)
EGLIN AIR FORCE BASE FLORIDA
5 Dec 14
STATEMENT OF OBJECTIVES (SOO)
| Contract #: | FA2823-10-D-0001 |
| Project #: | FTFA14-1101 |
| Project Title: | Repair Cabinets Bldg 107 |
SUMMARY OF WORK
1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a Statement of Objectives (SOO) for the above mentioned project. This document does not replace any of the provisions or requirements of the Simplified Acquisition of Base Engineering Requirements (SABER) contract to include SABER Statement of Work and specifications. The provisions of this section apply to this delivery order only, and the Contractor shall ensure that they, their personnel and subcontractors completely understand these provisions before developing the detailed statement of work and commencing work on this delivery order. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB. The Contractor’s proposal shall be submitted to the CO in accordance with paragraph 3.3.2. Contractor’s Statement of Work (SOW) package. “Design responsibility rests with the contractor. Government reviews, coordination, testing, comments, and observation at any stage of contract performance shall not be construed as actual or constructive notice to the Government of design and/or workmanship defects.”
2. PROJECT SCOPE: The project is located at Bldg 107. The Contractor shall be required to furnish all materials, equipment, plant, labor and personnel necessary to design, manage, and accomplish this task order in accordance with the contract requirements. A complete and usable facility must be furnished upon completion of task order. The Contractor is expected to maintain, at all times, good and accepted construction and safety standards.
A. The Contractor shall replace restroom lavatory base cabinets, faucets and shower floor tile.
3. PRINCIPAL FEATURES: Principal features of work are as follows:
A. ARCHITECTURAL/PLUMBING:
1. Disconnect and demo five existing lavatory faucets; carefully remove existing cultured marble sink countertop (approx 10 LF) and store on site for later reinstallation; demo five (5) existing 24” wide wood base cabinets.
2. Supply and install five (5) new manufactured wood casework vanity base cabinets (approximately 24”w x 18”d x 30”h). Cabinets shall be quality constructed of oak, traditional style, two panel door doors, toe kick, solid wood frame, particleboard side panels, dark finish (Java Oak or similar), with associated hardware (brushed nickel knobs and concealed hinges). Cabinets shall be similar in style to Insignia Ridgefield Java Oak Traditional cabinets and correctly sized to properly fit in area of removed cabinets. Submit cabinet data sheet or sketch, material sample, and color chart for selection and approval prior to ordering. Install vinyl base around perimeter of new cabinets and caulk adjacent to wall tile.
3. Reinstall existing sink countertop, caulk to backsplash, and reconnect sink drains.
4. Install five new single lever, energy-efficient Delta (or approved equal) lavatory faucets with popup stoppers; reconnect to existing water supply shut-off valves with braided supply lines.
5. Replace existing ceramic tile floors in three (3) showers, two (2) shower curb tile and bottom two rows of 4” wall tile in the three showers. Approximate shower dimensions are 33” x 46” with a 4-1/2” curb for two showers, and handicap shower is approximately 60” x 62”. New ceramic floor, wall and curb tile (price group 1) shall be 4”x4”. Properly slope floor tile to floor drains. Wall tile shall match existing. Submit tile samples for color selection and approval.
6. Repair damaged ceramic wall/base tile adjacent to vanity base cabinet and shower openings as required (not to exceed 10 LF); match tile with existing tile/base.
B. FIRE PROTECTION:
1. Ensure Design and Installation meet all requirements of UFC 3-600-01 and all applicable NFPA standards.
4. SPECIAL INSTRUCTIONS:
General:
a. The Contracting Officer is the only person who can obligate the government, direct the contractor or make changes to a delivery/task order.
b. The Contractor shall perform all investigative and design services necessary to complete this project by all appropriate codes.
c. In the absence of required material submittals/drawings showing the description of item or items to be installed, at a minimum, the description of the item or items installed shall be that of the negotiated proposal.
5. REQUIRED DRAWINGS as marked:
| (X) A. | Cover Sheet with title and approval block | |
| (X) B. | Floor Plan with finish schedule | |
| (X) C. | Cabinet elevation and details |
6. RECOMMENDED PERFORMANCE PERIOD: 90 calendar days
| //signed// | |
| DAVID FRASIER, Civ | |
| SABER Project Manager |
Attachment:
a) Existing site condition photos
EXISTING LAVATORY CABINETS
EXISTING HANDICAP SHOWER (60” X 62”)
EXISTING REGULAR SHOWER - 2 EACH (33” X 46”)