Attch_03_DDC_System_Requirements.docx

DOCX document 21 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA2823-15-R-4002
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Attachment 03 DDC System Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
FA2823-15-R-4002-0005.pdf PDF
FA2823-15-R-4002-0004.pdf PDF
Attch_27_Floor_Plan_Bldg_107.pdf PDF
FA2823-15-R-4002-0003.pdf PDF
Site_Visit_KTR_Sign_In_Sheet.pdf PDF
Attach_28_-_MFR_for_Questions_and_Answers.docx DOCX document
FA2823-15-R-4002-0002.pdf PDF
MFR_for_SABER_Solicitation_Questions_(2).docx DOCX document
Attch_01_Eglin_SABER_Specifications.pdf PDF
Attch_05_Eglin_Architectural_Compatibility_Plan.pdf PDF
Attch_02_Industrial_Safety_and_Health_Requirements.docx DOCX document
Attch_10_Wage_Rate_FL140081.pdf PDF
Attch_15_Wage_Rate_FL140229.pdf PDF
Attch_11_Wage_Rate_FL140029.pdf PDF
Attch_12_Wage_Rate_FL140036.pdf PDF
Attch_06_Eglin_AFB_Access_Affidavit.pdf PDF
Attch_26_Daily_Report_to_Inspector.pdf PDF
Attch_18_Wage_Rate_FL140126.pdf PDF
Attch_21_Past_Performance_Questionnaire.doc DOC document
Attch_08_Wage_Rate_FL140052.pdf PDF
Attch_04_Cable_Installation_Specifications.pdf PDF
Attch_07_Base_Access_Memorandum.doc DOC document
Attch_19_Wage_Rate_FL140094.pdf PDF
Attch_24_Contract_Bonds_Checklist.pdf PDF
Attch_23_Task_Order_0001_Statement_of_Objectives.docx DOCX document
Attch_16_Wage_Rate_FL140194.pdf PDF
Attch_14_Wage_Rate_FL140222.pdf PDF
Attch_20_Past_Performance_Project_References.doc DOC document
FA2823-15-R-4002.doc.pdf PDF
Attch_13_Wage_Rate_FL140070.pdf PDF
Attch_17_Wage_Rate_FL140119.pdf PDF
Attch_25_Site_Visit_Map.pdf PDF
Attch_09_Wage_Rate_FL140197.pdf PDF
Attch_22_Financial_Responsibility_Questionnaire.doc DOC document
FA2823-15-R-4002-0001.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDC System Requirements: 19 August 2011

1. Provide building level supervisory controllers based on Eglin’s existing Niagara AX Framework Rev 3.5 or later. The building level supervisory controllers shall include point-2-point (P2P), Secure Socket Layer SSL, Web server and embedded WorkBench (WB). The building level supervisory controllers shall contain all building logic and graphics.

2. All graphics and points shall be duplicated in the existing Niagara AX Framework ENS (Enterprise Network Server) using existing workbench software located in building 696 which shall serve as the Web Server for the system. All trended points shall be transferred via P2P to the server for history trending of points.

3. One- laptop with the latest operating system, cpu, and technology as it relates to laptops, software and hardware for upload, download, commissioning, and trouble shooting of all control devices shall be unconditionally provided to the government with all necessary licensing.

4. The system shall allow CE technicians to connect to all controllers with all available software in all modes available from the manufacturer from Bldg 696 via the local area network (LAN) to program, backup, download, configure and perform all functions necessary to maintain the system as if onsite and direct connected to the device.

5. All hardware and software administrator level passwords shall be provided to the government to access all levels of all controllers including the new Niagara Framework controllers. The password shall allow complete access to everything the manufacture has access to.

6. Contractor shall provide systems engineering training to 5 DDC personnel on Eglin AFB for 5 full days (course length). The training will produce 5 factory certified technicians.

7. All field controllers shall use Bacnet mstp protocol.

8. Provide a Lan drop within three foot of each building level supervisory controller and provide a patch cable between the Lan drop and the building level supervisory controller.

Graphics shall be in the existing ENS (Enterprise Network Server) located in building 696 which shall serve as the Web Server for the system.

Include date and time on all graphic screens.

Main Map Graphic- This screen will have a list and link to all of the buildings on the entire Eglin complex.

Building Graphic- This screen will have a 3d graphic of the front of the building and a building number. The following links are required on this page: Back to Main Map, floor plans, alarms, reports, schedules, history, and user service.

Floor Plan Graphic The floor plan will be 3D with color coded zones, room numbers, and as- built sensor and equipment locations.

The following points are required on this page: room temp, room humidity, occupancy status The following links are required on this page: back to building graphic, all equipment (Click on sensor or equipment shown on the floor plan and the link will go to the corresponding equipment).

Typical Equipment Graphic Include a header with equipment type and number, room numbers and area served.

Include all points on the equipment graphic.

The following points will be animated: fans, dampers, coils, pumps, boilers.

All set points will have the capability of being changed from the graphic.

The following links are required on this page: back to floor, provide a hidden link over each point to show an hourly 3 day trend, provide a hidden link over each point to override all outputs. Provide a link to a spread sheet with manufacture and part numbers and warranty dates for all parts on the equipment graphic.

Communication Bus Graphic Include an as-built wiring diagram of the communication bus between all controllers.

File details come from the government source that posted it. Updated .