Attachment_1_-_PWS_01_June_2013.pdf
PDF 155 KB Posted
- Attached to
- Flight Test Support Federal contract opportunity
- Solicitation number
- FA2823-13-R-0001
About this file
Attachment 1 - Performance Work Statement (PWS) 01 June 2013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_WD_2005-3033_Rev_13.pdf | ||
| FA2823-13-R-0001__Q A_01_Response.pdf | ||
| FA2823-13-R-0001-0001 _Amendment_01.pdf | ||
| Annex_B_rev_-_STS_LAIRCM.pdf | ||
| Attachment_3_-_WD_05-3033_Rev_12.pdf | ||
| Appendix_B_-_PP_Questionnaire.pdf | ||
| Exhibit_A_-_CDRL_A001.pdf | ||
| Annex_C_-_STS_Thallus.pdf | ||
| Annex_A_-_STS_MALD-J.pdf | ||
| Appendix_A_-_PP_References.pdf | ||
| Annex_B_-_STS_LAIRCM.pdf | ||
| Exhibit_B_-_DD_FORM_254.pdf | ||
| Appendix_C_-_Financial_Questionnaire.pdf | ||
| Attachment_2_-_Price_List_Tables.pdf | ||
| FA2823-13-R-0001 _Flight_Test_Support.pdf | ||
| Annex_D_-_TEP.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Flight Test Support
46 Test Squadron
01 June 2013
Performance Work Statement (PWS) Solicitation No. FA2823-13-R-0001
TABLE OF CONTENTS
SECTION TITLE PAGE
1.0 Description of Services 3
1.1 Background 3
1.2 Basic Services 3
1.3 Performance Period 3
1.4 Scheduling and Orders 3
1.5 Performance & Deliverables 4
1.6 Additional Contractor Requirements and Facilities 5
1.7 General Aircraft Support Requirements 6
1.8 Test Support Scenarios/Examples 8
2.0 Services Summary 12
2.1 General 12
2.2 Performance Evaluation 12
3.0 Government-Furnished Facilities, Equipment, and Services 13
3.1 Runways & Parking 13
3.2 Hangar 13
3.3 Petroleum, Oil, and Lubricants (POL) 13
3.4 Fire Prevention and Protection 13
3.5 Emergency Medical Service 13
3.6 Security Forces 13
3.7 Government Provided Training 13
4.0 General Information 14
4.1 Contractor Personnel 14
4.2 Hours of Operation 15
4.3 Quality Control (QC) 15
4.4 Environmental Controls 16
4.5 Safety 16
4.6 Mishap Investigation 17
5.0 APPENDICES 17
5.1 Appendix A – Reports and Submittals 18
5.2 Appendix B – Acronyms and Abbreviations 19
5.3 Appendix C – Applicable Publications and Forms 20
1.0. DESCRIPTION OF SERVICES: T h e 96 Test Wing (96 TW), 96 Operations Group, 46 Test Squadron (46 TS) has requirements for two areas of Flight Test Support. These areas are:
1) Providing aircraft for support of systems under test, and
2) Provide aircraft modifications necessary for support of systems under test.
Each of these requirements will be conducted in separately scheduled test support missions. The contractor tasks include, but not limited to, providing all aircraft, equipment, tools, materials, supervision, logistics, training, technical support, and other items and services necessary to manage and provide Flight Test Support to meet the requirements as presented below. It is the Government’s intent for this effort to be a Firm Fixed Price (FFP), Indefinite Delivery Indefinite Quantity (IDIQ) type contract.
1.1. BACKGROUND. The 96 Test Wing (96 TW), 96 Operations Group, 46 Test Squadron (46 TS) conducts test and evaluation of communications, surveillance, and other airborne and ground based electronic systems. The 46 TS supports the United States Air Force, other Department of Defense (DoD) organizations, Department of Energy (DOE), the Federal Aviation Administration (FAA), commercial customers, and foreign entities. Specifically the 46 TS plans, conducts, analyzes, and reports on developmental testing in six functional areas to include C4I Systems, Datalinks and Tactical Communications, Sensors and Defensive Systems, Command and Control, Mission Planning Systems, and Information Assurance. To facilitate cost-effective testing of the various systems assigned to the 46 TS, the squadron supports internal and external customers with program management assistance to contract for commercial flight test services.
1.2. BASIC SERVICES. The 46 TS requires uniquely modified aircraft to accomplish test activities.
Flights may occur at different DoD and DOE locations throughout the continental United States.
Based on history, the majority of the test events are anticipated to occur at Eglin AFB, however the contractor shall have the ability to support mission requirements at various locations within CONUS, to include Nellis, Holloman, Utah Test and Training Range (UTTR) and other locations as designated.
The published pricing will include costs for mission support including all possible alternate locations.
Effective test support requires quick response times and flexible scheduling, therefore a two-week minimum response time is desired from issuance of a Task Order to first flight (to include aircraft modifications) for short suspense mission requests.
1.3. PERFORMANCE PERIOD. The Contractor shall perform the services in this PWS for the basic period of 01 August 2013 through 31 July 2014 with four (4) one-year Options if clause 52.217-9, Option to Extend the Term of the Contract, is exercised, and any other applicable Options.
1.4. SCHEDULING AND ORDERS. The following scheduling and ordering procedures will be utilized.
1.4.1. For each test support mission under this contract, the contractor shall dedicate personnel and aircraft to complete the Flight Test Support objectives. The contractor shall only support other customers during a test support mission on a non-interference basis by obtaining prior written authorization from the 46 TS Program Manager or a designated representative and approval of the Contracting Officer.
1.4.2. An Indefinite Delivery Indefinite Quantity (IDIQ) type contract has been selected due to the variety and scheduling of test support mission requirements. There is no determination for the number and frequency of test support missions that will require contract support. At the time a Flight Test Support requirement is identified, a Request for Proposal (RFP) will be provided to the contractor stating the objectives of the test support mission. In turn, the contractor shall submit a Firm Fixed Price proposal to be negotiated by the Contracting Officer prior to the issuance of a Task Order contract based on the rates incorporated into the basic IDIQ contract.
1.4.3. Travel. The contractor may be required to travel to support mission requirements at various locations within CONUS. Travel arrangements shall be included in the contractor’s proposal on an individual Task Order basis and be invoiced from a separate (zero profit) travel CLIN. All travel shall be approved in accordance with the JTR/FTR regulations in advance by the Contracting Officer. In no case will the total travel reimbursement for any Task Order exceed the travel dollars estimated in the contractor’s accepted proposal. The contractor shall provide the Contracting Officer Representative (COR) personnel or designated representative an itemized statement of expenditures no later than five (5) working days after completion of the Task Order. The government will verify travel expenditures when reviewing contractor invoice for reimbursement against the travel CLIN.
1.4.4. Petroleum, Oil, and Lubricants (POL). POL will be handled on a per mission test support basis in accordance with 1.5.4 and 3.3 below and will be identified to the contractor in the Request for Proposal for a Task Order.
1.5. PERFORMANCE & DELIVERABLES.
1.5.1. The contractor shall be able to perform the following tasks necessary to ensure performance of the contract.
1.5.1.1. Contractor shall comply with Federal Aviation Regulations (FARs) to install instrumentation / external devices and be ready to start testing IAW the project scheduled provided by the government.
1.5.1.2. Contractor ability to achieve on-time takeoffs (+/- 15 minutes of the desired time) to meet range time schedules as provided by the government.
1.5.1.3. Contractor ability to provide the types/numbers of aircraft required for a particular flight test.
1.5.1.4. Contractor ability to provide documentation to the government of FAA approval for aircraft modifications/external carriage devices.
1.5.2. Status Report. The contractor shall provide the Contracting Officer Representative (COR) personnel with test support mission status report (CDRL A001) that will detail Flight Date, Flight Time, Flight Number, Duration, Pilot and Passenger Names. Status Report shall be submitted within 5 working days after each completed Task Order. The requirement to provide CDRL A001 will be a Not-Separately-Priced (NSP) CLIN on each Task Order.
1.5.3. FAA Compliance. Modifications the contractor makes to the aircraft or external carriage devices shall be in compliance with applicable Federal Aviation Regulations. The contractor will be responsible for obtaining all required FAA approval for flight and will operate in accordance with the applicable FARs. FAA airworthiness certificate, weight and balance, and maintenance logs (or equivalent documentation as is appropriate for aircraft and contractor standard operations) following any modifications required by a Task Order test support mission shall be maintained for review by Contracting Officer Representative (COR) or the Contracting Officer at any time.
1.5.4. Petroleum, Oil, and Lubricants (POL). When operating from a commercial airfield the contractor will be responsible for obtaining POL, including fuel.
1.6. ADDITIONAL CONTRACTOR REQUIREMENTS & FACILITIES. The contractor shall comply with the following requirements:
1.6.1. The contractor shall maintain liability coverage for any damage or loss of the aircraft.
Contractor shall obtain/maintain and keep current the following documents, mail/e-mail copies to the designed Quality Assurance personnel prior to performance of the Task Order for the test support mission (DD Forms only), and have them available for verification at all times while aircraft are at Eglin AFB or designated location.
1.6.1.1. DD Form 2400, Civil Aircraft Certificate of Insurance.
1.6.1.2. DD Form 2401, Civil Aircraft Landing Permit.
1.6.1.3. DD Form 2402, Civil Aircraft Hold Harmless Agreement.
1.6.1.4. FAA airworthiness certificate, weight and balance, and maintenance logs (or equivalent documentation as is appropriate for aircraft and contractor standard operations).
1.6.1.5. The contractor shall have current Commercial Pilot Certificate with appropriate rating for the aircraft flown.
1.6.1.6. The contractor shall accomplish all preflight requirements.
1.6.2. Time Space Position Information (TSPI). For those missions where the government does not have a TSPI package installed in the aircraft, and the aircraft is normally equipped with a GPS, and the contractor has a GPS data recording device, the contractor shall provide TSPI in 1 Hz update, in MS Excel format, within 48 hours of the end of the mission. Data may be provided on CD or hard drive, as desired.
1.6.3. Contractor Furnished Facilities. The contractor must have SECRET facility clearance. In addition, the contractor must provide for open storage of SECRET material in a 30’ x 30’office space and a hanger area of 150’ x 90’. The contractor must own a secure storage container large enough to house up to 5 laptops. Access to SIPRNET is desired, but not required. The contractor must be in good standing with his local Defense Security Service office. The contractor will provide a facility in which instrumentation and external carriage devices may be installed. The contractor will install external carriage equipment/devices on the provided aircraft. The contractor will provide assistance with installation of government furnished instrumentation to include: rack location, power connections, connection to GPS or other antenna(s), and wire feed through to the externally carried devices. The contractor will provide office space (a desk and phone) for the deployed government test team. The contractor will provide ramp space for ground checks of installed equipment including aircraft engine runs, as required.
1.7. GENERAL AIRCRAFT SUPPORT REQUIREMENTS. Aircraft support will be required for wide a variety of electronic system test programs. In addition to just providing aircraft for support, modifications will be required to aircraft for installation of the systems under test. Systems to be installed include (but are not limited to) radios, GPS systems, sensors, and countermeasures (flares, jammers, etc.). The aircraft must provide electrical power for the instrumentation. It is the responsibility of the contractor to follow Federal Aviation Regulations (FAR) guidance, and obtain the appropriate airworthiness certifications for test configurations on his aircraft. This includes any required testing to support the certification, such as electromagnetic interference/compatibility (EMI/EMC) testing, etc. For flight above 12,000 feet mean sea level (MSL) the aircraft must be pressurized and heated/cooled to commercial standards to permit a shirt sleeve working environment within the aircraft without the need for supplemental oxygen. In addition, the aircraft must be able to provide cool air to internal instrumentation devices/racks. The programs will require provision of aircraft types including (but not limited to) those listed below:
1.7.1. North American S-40 Sabreliner (or equivalent – referred to as “Sabreliner, or equivalent” in the rest of this document)
- Ceiling – Flight level (FL) 450 ft
- Operating Airspeed – Minimum of 450 knots indicated airspeed (KIAS) normal cruise speed
- Clear line of sight around the lower hemisphere measured from the external device
- Payload capacity –700 pounds minimum for external storage plus internal store.
- Flight time required: Flight time minimum threshold is 2.5 hours with a goal of 3 hours
- The aircraft must have the ability to carry full fuel, aircrew, and two government provided crew members (nominally a government flight test engineer, and an instrumentation operator), racks and/or test equipment and instrumentation. In addition, the ability to carry up to two additional crew members is desired.
- The aircraft must be able to provide both the cooling, electrical & RF inputs to the Sabreliner or equivalent:
- 400 Hz/115VAC, 20 Amps
- 60Hz/115 VAC, 20 Amps
- 28 VDC, 500 Amps
- Access to a GPS and UHF antenna is required. The government may provide the GPS / UHF antennas for mounting by the contractor
1.7.2. Beechcraft 100 (or equivalent – referred to as “King Air, or equivalent”, in the rest of this document)
- Ceiling – FL 250 ft
- Operating Airspeed – Minimum of 230 KIAS normal cruise speed
- Clear line of sight around the lower hemisphere measured from the external device
- Payload capacity – 800 pounds minimum for external storage, plus internal store
- Flight time required: Flight time minimum threshold is 2.5 hours with a goal of 3 hours
- The aircraft must have the ability to carry full fuel, aircrew, and two government provided crew members (nominally a government flight test engineer, and an instrumentation operator), racks and/or test equipment and instrumentation. In addition, the ability to carry up to two additional crew members is desired.
-The aircraft must be able to provide both the cooling, electrical & RF inputs to the Beechcraft King Air 100 or equivalent:
- 400 Hz/115VAC, 10 Amps
- 60Hz/115 VAC, 10 Amps
- 28 VDC, 200 Amps
1.7.3. Beechcraft H18 (or equivalent – referred to as Beechcraft, or equivalent” in the rest of this document)
- Ceiling – FL 180 ft
- Operating Airspeed – Minimum of 230 KIAS normal cruise speed
- Clear line of sight around the lower hemisphere measured from the external device
- Payload capacity – 650 pounds minimum for external, plus internal store
- Flight time required: Flight time minimum threshold is 2.5 hours with a goal of 3 hours
- The aircraft must have the ability to carry full fuel, aircrew, and two government provided crew members (nominally a government flight test engineer, and an instrumentation operator), racks and/or test equipment and instrumentation. In addition, the ability to carry up to two additional crew members is desired -The aircraft must be able to provide both the cooling, electrical & RF inputs to the Beechcraft H-18 or equivalent:
- 400 Hz/115VAC, 8 Amps
- 60Hz/115 VAC, 8 Amps
- 28 VDC, 150 Amps
1.7.4. Payloads. The payloads specified in paragraph 1.7.1 through 1.7.3 refer to the externally carried device, the adaptor to attach it to the MAU-12 (considered part of the aircraft), the wiring harness from the external device into the aircraft, and instrumentation within the aircraft. In addition to this payload, the aircraft must carry full fuel, aircrew, and two government provided crew members (nominally a government flight test engineer, and an instrumentation operator). The ability to carry up to two additional crew members is desired.
1.7.5. In addition to the provision of aircraft types described above, the contractor shall provide the following aircraft/capabilities:
1.7.5.1. Hardpoints. The test aircraft will have a centerline rack capable of accommodating the systems under test, or other externally carried device(s). The centerline rack will be a MAU-12, 16S600 capable of connecting to an Electronic Counter Measure (ECM) adapter, an AERO-7 rack, or the capability to obtain this requirement in a timely manner. In addition, the test aircraft will have (or be able to obtain these requirements in a timely manner):
- Multiple external antenna locations and adapter plates to support voice, data and GPS antennas
- Power inverters (60 cycle, 115 volt, 2400 watts each)
- Single switch test power (400 cycles, 28 volts and 60 cycles, 115 volts) circuit
- External Power Plugs (60 cycle 115 volt) to provide ground power for ground checks of test equipment
- Modified belly hatch with quartz window (24” x 24”) to accommodate optics, sensors, and turrets
- Nose cone to support functionality of various radars and sensors
- Wing tip and tail cone modified to house sensors (brackets, coax data line, and 28 V-dc in place)
- Capability to carry external stores with wiring necessary to drop/launch up to 950lbs
- Capability to configure test engineer seating to meet mission objective
- Intercom locations throughout aircraft cabin
- UHF/VHF communication capability
- Test engineer air-to-ground communications from aircraft cabin
- Crash certified equipment/instrumentation racks
- Cabin air conditioning for ground checks
- FAA certified to carry the following equipment: LAIRCM Test Pod or MALD-J Jammer
Demonstration Vehicle, MALD-J AN/ADM-160C All-Up-Round or other device with appropriate electrical interfaces via cabling routed through the hard point hatch to on-board instrumentation.
1.7.5.2. Instrument Flight Rules. The test aircraft and pilots shall be IFR certified and current to allow IFR flight.
1.8. TEST SUPPORT SCENARIOS/EXAMPLES. The following are detailed examples of the types of tests and test support required. Support for programs/testing other than that detailed below may be required.
1.8.1. Miniature Air-Launched Decoy-Jammer (MALD-J) Support Requirements:
1.8.1.1. Background: Sabreliner, or equivalent, support has been used by the 46 TS during several phases of the Miniature Air-Launched Decoy-Jammer (MALD-J) program. MALD-J is an on-going upgrade program. Support was provided during Developmental Test & Evaluation (DT&E) using two aircraft. Upon completion of DT&E, AFOTEC planned for and used a third Sabreliner or equivalent to support the Operational Test & Evaluation (OT&E) program. Three Sabreliners, or equivalent, have supported two MALD-J OT&E deployments to date.
1.8.1.2. Purpose: Provide Sabreliners, or equivalent, equipped with Jammer Demonstration Vehicles or MALD-J ADM-160C vehicles to support MALD-J upgrade testing to include AFOTEC MALD-J Operational Testing at the Eglin AFB test ranges, Nevada Test and Training Range, NV (NTTR), and other locations as deemed necessary.
1.8.1.3. Scope: It is the responsibility of the contractor to attain the appropriate airworthiness certifications for test configurations on his aircraft. This includes any required testing to support the certification, such as electromagnetic interference/compatibility (EMI/EMC) testing, etc. Sabreliner or equivalent support for deployments to NTTR is typically planned for 7 days duration. Equipment installations are required prior to and during the deployment to support airborne and ground test activities. Removal of equipment is required post mission at the test site and at the contractor’s facility after the aircraft returns from the deployment.
1.8.1.4. Missions: Multiple Sabreliner, or equivalent, sorties of up to 3 hours on-range time are typically planned during the deployment, with the same support time if Eglin AFB test range missions are supported. All missions will be conducted within the approved operating envelope of the aircraft. The aircraft will fly at altitudes from 10,000 ft MSL to FL350 carrying the MALD-J.
Airspeeds will vary from 250 kts to 450 kts, as appropriate for the altitude and MALD-J mission being simulated. The flight pattern will be provided by the test engineers on provided run cards. The flight pattern will simulate a MALD-J vehicle in free flight.
1.8.1.5. Period and Place of Performance: MALD-J testing will be conducted periodically for approximately 1-2 weeks at a time, with breaks in between test periods. In the near future, known MALD-J test requirements continue through FY13. Sabreliner or equivalent support will be required at Eglin AFB test ranges and NTTR through 30 Sep 13.
1.8.1.6. Performance Objectives: Plan and execute test mission profiles as planned and provide time, space, position information (TSPI) data for post mission analysis purposes.
1.8.2. Large Aircraft Infrared Countermeasures (LAIRCM). LAIRCM is an on-going, periodic upgrade program. Flight Test Support for the LAIRCM program will be provided with a Sabreliner, or equivalent, King Air, or equivalent, or Beach -18 aircraft, as required for the flight test envelope. The test aircraft will be FAA certified to carry the LAIRCM pod externally with the LAIRCM line replaceable units, and a LAIRCM instrumentation rack inside the aircraft. The aircraft will carry an instrumentation rack operator and at least one government provided flight test engineer.
1.8.2.1. Background. Test support is required for on-going LAIRCM system upgrades. Test missions will be flown on “range” missions at Eglin AFB or other suitable ranges against one or more threat system simulators designed to induce the LAIRCM system to respond as if it were under attack by a threat missile. Test missions will also be flown in general airspace, including approaches to commercial airfields on LAIRCM missile warning system clutter test missions.
1.8.2.2. Purpose. Provide Sabreliner, or equivalent, King Air or equivalent, and/or Beach -18 aircraft, or equivalent, to carry the LAIRCM pod for flight test missions. LAIRCM testing may be conducted periodically for three to six weeks at a time, with breaks in between test periods of many months, possibly a year or two.
1.8.2.3. Scope. It is the responsibility of the contractor to attain the appropriate airworthiness certifications for test configurations on his aircraft. This includes any required testing to support the certification, such as electromagnetic interference/compatibility (EMI/EMC) testing, etc. Test tasking includes:
- Installation of the pod on the aircraft
- Assistance with installation of LAIRCM instrumentation rack
- Ground testing to ensure the LAIRCM system is operating. This requires a clear ramp space of 100 meters from the aircraft. Ground testing may be at the contractor facility or government facilities depending upon the nature of the particular test.
- Any check missions for FAA clearance on carriage of the pod
- Flight test support for range and MWS Clutter missions. Range missions may be up to three hours long depending upon aircraft endurance. MWS Clutter missions may be five to seven hours long including refueling stops.
1.8.2.4. Missions. Examples of LAIRCM missions are:
1.8.2.4.1. Range Missions. The purpose of these missions is to collect data demonstrating the LAIRCM system can deliver the specification power and waveform when installed in the test aircraft flying in operationally representative profiles. Typically these missions are on Eglin test area range C-72 between 1000 and 2000 feet AGL. These missions can take 3 to 4 hours to complete.
1.8.2.4.2. MWS Clutter Missions. The purpose of these missions is to assess the ability of the LAIRCM system using the new LSPR to suppress false alarm sources in the presence of clutter, and to assess the LAIRCM system ability with the new LSPR to suppress false alerts to the aircrew. Typically these missions originate from the Eglin AFB, FL area and are flown below 5,000 feet AGL on an off-range clutter route in the southeastern United States. Instrument or visual approaches may be flown at multiple airports along the route. One effective clutter mission is required for each LAIRCM MWS configuration. These missions can take up to 7.5 hours to complete depending on ground speed and weather.
1.8.2.5. Period and Place of Performance: LAIRCM testing may be conducted periodically for three to six weeks at a time, with breaks in between test periods of many months, possibly years. In the near future, testing of LAIRCM LSPR is planned for Nov 13 at Eglin AFB. Nine range missions and three MWS Clutter missions are planned. There will be three different LAIRCM LRU configurations tested.
1.8.2.6. LAIRCM Performance Objectives. Mission objectives will be provided in the test plan provided by the government.
1.8.3. Thallus Dragon Support. Sabreliner, or equivalent, King Air or equivalent, or Twin Beech aircraft may be employed on this test as determined by the requirements of the test plan.
1.8.3.1. Background. These sorties require aircraft avionics and communications equipment to be modified to emulate specific tactical configurations, while supporting ground test operations. Aircraft are generally required to operate from uncontrolled airfields, such as Field 1 and/or Field 2 on the Eglin range or Bob Sikes Airport. The contractor will provide personnel to assist with aircraft modifications and to certify that final aircraft configurations are airworthy.
1.8.3.2. Purpose. The purpose of the missions is to support ground testing taking place on the range.
1.8.3.3. Scope. It is the responsibility of the contractor to attain the appropriate airworthiness certifications for test configurations on his aircraft. This includes any required testing to support the certification, such as electromagnetic interference/compatibility (EMI/EMC) testing, etc. The missions will generally be flown over the Eglin land ranges between 500 ft and 10,000 ft AGL Multiple sorties, lasting up to two hours may be flown in a single day or sorties may be spread out with one or more no-fly days between sorties. Testing may be daily for periods of up to two or three weeks. The aircraft may carry government provided instrumentation.
1.8.3.4. Missions. The flight test missions are flown in support of ground testing. The aircraft will fly at altitudes generally below 10,000 ft AGL and possibly as low as 500 ft AGL for brief periods. The aircraft will be flown at airspeeds appropriate for the type of test aircraft, varying from 150 to 250 kts.
The flight paths will be provided by the government test team. The aircraft will generally orbit over designated geographical points or fly patterns to designated points. Some mission may require landing and takeoff at Field 1, located within the Eglin R2914A test range. The test aircraft may be required to land at an Eglin AFB auxiliary airfield(s).
1.8.3.5. Period and Place of Performance. Testing generally occurs twice per year. The missions are typically flown over the Eglin AFB land ranges. Each ground test session generally requires between four and eight sorties.
1.8.3.6. Objectives. Mission objectives will be provided in the test plan provided by the government.
2.0. SERVICES SUMMARY
2.1. General
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. Unless indicated elsewhere these performance objectives will be measured on a per and/or cumulative Task Order basis. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
2.2. Performance Evaluation
Performance of a service shall be evaluated to determine whether or not it meets the performance requirements of this contract Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate. In the case of issued Corrective Action Reports (CARs), the Contracting Officer shall take appropriate measures according to the “Inspection of Services” clause.
SS Performance Objective PWS Para. CDRL Performance Threshold 1 Ability to respond to short notice tasking 1.2 - 90% of the time 2 Aircraft availability, capable of flying mission 1.7 - 85% of the time 3 Qualified aircrew availability for sorties 4.1.1, 4.1.5 - 95% of the time 4 Sorties completed as scheduled 1.4.1 - 90% of the time 5 Test Pod / Adapter availability and ready for flight 1.7, 1.7.5.1 - 95% of the time 6 Facility to include classified storage availability 1.6.3 - 95% of the time 7 Ability to support TDY off-site test locations 1.2 - 90% of the time
Documents/Reports are accurate and complete and submitted as required Exhibit A A001
No more than one late submission per quarter
3.0. GOVERNMENT-FURNISHED FACILITIES, EQUIPMENT, AND SERVICES
3.1. Runways & Parking. Some testing may require the contractor to land at a government facility or test range area. For these tests the government will provide appropriate runways/landing pads for the aircraft and provide a fire bottle and/or power cart, as required. The contractor will be responsible for ensuring the government provided facility is appropriate and safe for operation of the contractor’s aircraft. The Government will provide fire prevention, protection, inspection, and maintenance of Government-furnished fire extinguishers through organic or contract resources when the contractor aircraft is at a government facility. The Fire Department telephone extension is 911 for emergencies.
3.2. Hangar. Some testing may require the contractor aircraft to remain overnight at a government facility due to installation of test items, instrumentation, or to facilitate flight operations. Where appropriate, as determined by the government test team, and available, the government will provide a hanger in which the contractor aircraft may be placed.
3.3. Petroleum, Oil, and Lubricants (POL). When operating from a government airfield the government will provide a fuel card for contractor aircraft to obtain POL from the local government facility. Note that AVGAS may not be available at government facilities and if the aircraft uses AVGAS, the contractor will be responsible to obtaining fuel.
3.4. Fire Prevention and Protection. The government will provide fire prevention, protection, inspection, and maintenance of government furnished fire extinguishers and systems while on installation. The Fire Department telephone extension is 911 for emergencies. The contractor shall inspect any government furnished hand-held portable fire extinguishers and halon bottles IAW AACI 32-2001.
3.5. Emergency Medical Service. The government will provide emergency medical treatment and emergency patient transportation service while on installation for contractor personnel who are injured or become critically ill while in performance of this PWS. Treated contractor personnel shall be responsible for reimbursing the government for the cost of medical treatment and patient transportation at the current impatient or outpatient treatment rate. The telephone number for emergency medical care is 911.
3.6. Security Forces. The government will provide general security service while on installation. The Security Forces emergency phone number is 911.
3.7. Government Provided Training. The government will not provide training for the contractor except for the training stated within Task Order objectives unless the training is considered inherently governmental and approved by the Contracting Officer. The contract may request additional training/certification through the Contracting Officer at the contractor’s expense.
4.0. GENERAL INFORMATION
4.1. CONTRACTOR PERSONNEL. All personnel hired to fulfill the objectives of this PWS shall be the responsibility of the contractor. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population.
4.1.1. Contractor Staff Experience: Contractor test aircrew must be fully trained with professional flight test experience to include, but not limited to electronic counter-measure systems. Contractor shall support day or night test missions, in a variety of weather conditions; therefore, pilots must be qualified to fly instrumented flight rules. The contractor must provide experienced personnel to install and remove test equipment. The contractor must have at least two pilots, two mechanics and one facility manager all with SECRET security clearances. The contractor must be willing to provide personal information for programs having enhanced security requirements.
4.1.2. Valid Driver’s License. All contractor employees shall have a valid state driver’s license and shall be required to read, write, speak, and understand English.
4.1.3. Appearance. Contractor personnel shall present a neat, clean, professional appearance at all times, and be easily recognized.
4.1.4. Flight Line Access. All personnel requiring flight line access shall be fully qualified and thoroughly familiar with flight line rules and regulations as stated in AFI 13-213, Airfield Driving.
4.1.5. Personnel Certifications/Qualifications. The contractor shall maintain a file containing the qualifications/certifications of each employee. A copy of the qualification/certifications of any new employee hired after the contract start date shall likewise be maintained for review by Contracting Officer Representative (COR) personnel or the Contracting Officer at any time.
4.1.6. Personnel Training. The contractor shall train, qualify, and certify personnel for all tasks identified in this contract and in all areas identified that are not specifically identified as the responsibility of the Government. Government furnished training shall be monitored by the contractor to maintain required currency.
4.1.7. Conflict of Interests. The contractor shall not employ any individual who is an employee of the United States Government if the employment of that individual would create a conflict of interest.
The Contracting Officer shall make conflict of interest determinations. The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and received approval of the employment in accordance with DODD 5500-7.
In addition, the contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to policies contained in AFI-64-106, Air Force Labor Relations Activities.
4.1.8. Contractor Full-Time Equivalent Reporting.
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at the Contractor Manpower Reporting Application (CMRA) site: http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.”
*Reporting Period: Contractors are required to input data by 31 October of each year.
However, due to the delayed implementation, input of FY12 data is required by 31 Mar 13.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
4.2. HOURS OF OPERATION. The contractor shall support times and dates as required by the test support mission. The hours could be day or night and could be up to twelve (12) hours per day, and could possibly run seven (7) days a week. Hours of operation will be handled on a per mission test support basis and will be identified to the contractor in the Request for Proposal for a Task Order.
4.2.1. PERFORMANCE OF SERVICES DURING CRISIS DECLAED BY THE NATIONAL
COMMAND AUTHORITY IAW DoDI 3020.37 (Continuation of Essential DoD Contractor Services during Crisis) and Air Force implementation, unless otherwise directed by an authorized government representative, it is determined that services as identified in this PWS are NOT essential for performance during a crisis.
4.3. QUALITY CONTROL (QC).
4.3.1. Quality Control. The contractor shall develop and execute a Quality Control Plan (QCP) to document, implement, maintain, and continuously improve a comprehensive higher-level quality management system that assures compliance with all requirements of this PWS and all applicable government requirements. Quality Control (QC) documents, schedules, and records shall be kept up to date, accurate, and made available to government personnel as requested. The contractor shall make appropriate modifications to the Quality Control Plan, previously submitted during the solicitation http://www.ecmra.mil/ http://www.ecmra.mil/ process, for acceptance by the Contracting Officer within 10 calendar days after the performance start date of the basic IDIQ contract. The Contracting Officer will notify the contractor of acceptance or any required modification to the Quality Control Plan. The plan shall ensure the requirements of this contract are met to include procedures for identifying, preventing, and correcting defective services.
The QCP shall be reviewed and submitted to the Contracting Officer for review/approval within 10 calendar days after exercise of any basic IDIQ contract Option period. The Contractor’s quality control plan shall contain, as a minimum, the following items:
a. A description of the inspection system to cover all services. Description shall include specifics as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s).
b. A description of the methods to be used for identifying and preventing defects in the quality of service performed.
c. A description of how the records will be kept. Records must document all inspections and corrective or preventive actions taken.
4.3.2. Government Contracting Officer Representative (COR). Pursuant to the Inspection of Services clause 52.246-4 in this contract, CORs will perform surveillance of the services using the Government’s Quality Assurance Surveillance Plan (QASP) focusing on the Service Summary (SS) items and contractor’s Quality Control Plan (QCP). When surveillance indicates nonconforming performance findings, the COR will require the contractor contract manager, or representative, to initial the findings;
however, initialing of findings does not constitute concurrence, only acknowledgement. The COR shall send nonconforming performance findings to the Contracting Officer or designated representative.
4.3.3. Surveillance. The COR will evaluate the contractor’s performance through periodic surveillance.
Government surveillance of requirements listed in this PWS by methods other than those listed in the Performance Plan will be done according to standard inspection procedures or other contract provisions.
Any action taken by the Contracting Officer because of surveillance shall be according to the terms of this contract.
4.3.4. Non-Conformance. The contractor shall respond to the Contracting Officer, in writing, to identify nonconforming written findings within 10 days of receipt. Responses shall be considered by the Contracting Officer for validation of nonconforming findings.
4.4. ENVIRONMENTAL CONTROLS. The contractor shall perform the requirements of this PWS in an environmentally acceptable manner in accordance with all applicable OSHA, AF, federal, state, and local environmental protection and health laws and regulations.
4.5. SAFETY. The contractor shall establish a safety and health program for employees compliant with the OSHA Public Law 91-596 and the resulting OSHA Standards, 29 Code of Federal Regulations (CFR) 1910 and 1926, including applicable DoD and AF safety guidelines required to protect government resources and the general public. The contractor shall comply with Air Force Occupational Safety and Health (AFOSH) Standards or AF safety program instructions only to the extent required to protect AF resources (facilities, equipment, and AF personnel) and the general public. If military or government personnel do not work with contract personnel in the pursuit of the same Task Order objectives, the government will not assess the contractor personnel’s work place environment as it is the responsibility of the contractor to assess and protect contract employees.
4.6. MISHAP INVESTIGATION.
4.6.1. Contractor Technical Support. In the event of any mishap resulting in the loss, damage or destruction of the aircraft, a government facility or equipment, or injury/death of personnel, the contractor agrees to provide technical support for any investigations to assess the cause.
4.6.2. Safety Investigation. Safety investigations shall be conducted in accordance with procedures outlined in AFI 91-204, Safety Investigations and Reports, for those mishaps described therein. Any resulting safety report shall not be provided to the contractor.
4.6.3. Accident Investigation. Accident Investigations shall be performed in accordance with AFI 51- 503, Aerospace Accident Investigations, and shall include any mishap that may reasonably be expected to give rise to: (a) claims against the Government in excess of $50,000.00; (b) litigation against the government or any third party; or (c) involve a fatality or permanent disabling injury. The purpose of this type of investigation shall be to gather and preserve evidence for claims, litigation, disciplinary and administrative actions. The information obtained as a result of the investigation shall be not be privileged and shall be released to third parties in accordance with paragraph 11 of the above referenced regulation.
5.0. APPENDICES
5.1. Appendix A – Reports and Submittals
5.2. Appendix B – Acronyms and Abbreviations
5.3. Appendix C – Applicable Publications and Forms
5.1. Appendix A – Reports and Submittals
REQUIRED REPORTS/SUBMITTALS. The following table is a representative listing of the required submittals fully outlined in the text of the PWS and is not all-inclusive.
CDRL No Form No
Title Submitted To
Required Format
Frequency PWS Paragraph
A001 Status Report CORs Contractor format
Within 5 days of each completed Task Order
1.5.2
DD Form
Civil Aircraft Certificate of Insurance
CORs Adobe
Prior to performance of each Task Order
1.6.1.1
DD Form
Civil Aircraft Landing Permit
CORs Adobe
Prior to performance of each Task Order
1.6.1.2
DD Form
Civil Aircraft Hold Harmless Agreement
CORs Adobe
Prior to performance of each Task Order
1.6.1.3
FAA
Airworthiness Certificate
CORs FAA / Contractor format
As requested 1.5.1.4, 1.5.3, 1.6.1.4, 1.7.5.1
Personnel Certifications / Qualifications
CORs Contractor Format
As requested 1.6.1.5, 4.1.5
Contractor Full- Time Equivalent Reporting
CMRA
Website
CMRA
Website Format
NLT 31 October of each calendar year
4.1.8
Time Space Position Information
CORs MS Excel on CD or Hard Drive
Within 48 hours of the end of each Task Order
1.6.2, 1.8.1.6
Quality Control Plan
Contracting Officer
Contractor Format
Submitted with Proposal, & within 10 days of each exercised Option period
4.3.1
5.2. Appendix B – Acronyms and Abbreviations
46 TS 46 Test Squadron 96 TW 96 Test Wing AFI Air Force Instruction AFOSH Air Force Occupational Safety and Health CDRL Contract Data Requirements List CFR Code of Federal Regulations CLIN Contract Line Item Number CMRA Contractor Manpower Reporting Application CONUS Continental United States COR Contracting Officer’s Representative DoD Department of Defense DODI Department of Defense Instruction DOE Department of Energy DT&E Developmental Test & Evaluation EMC Electromagnetic Compatibility EMI Electromagnetic Interference FAA Federal Aviation Administration FAR Federal Aviation Regulation FL Flight Level FY Fiscal Year GPS Global Positioning System IDIQ Indefinite-Delivery Indefinite Quantity KIAS Knots Indicated Airspeed LAIRCM Large Aircraft Infrared Countermeasures MALD-J Miniature Air-Launched Decoy Jammer MSL Mean Sea Level NSP Not-Separately-Priced NTTR Nevada Test and Training Range OSHA Occupational Safety & Health Administration OT&E Operational Test & Evaluation POL Petroleum, Oil, and Lubricants PWS Performance Work Statement QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan RFP Request for Proposal SS Service Summary TSPI Time Space Position Information UTTR Utah Test and Training Range
5.3. Appendix C – Applicable Publications and Forms
Publications (to include their supplements at any organizational level) and forms that apply to this PWS are listed below. The publications and forms have been coded as mandatory or advisory. The Contractor is obligated to follow those publications and use those forms coded as mandatory to the extent specified in other sections of this PWS. The Contractor shall be guided by those publications or use those forms coded advisory to the extent necessary to accomplish requirements in this PWS. All publications and forms listed shall be made available by the Government at the start of the contract.
Supplements or amendments to listed publications from any organizational level may be issued during the life of the contract. The Contractor shall immediately implement those changes that result in a decrease or no changes in the contract price and notify the contracting officer in writing of such changes.
Before implementing any change that will result in an increase in contract price, the Contractor shall submit to the contracting officer a price proposal within 30 calendar days following receipt of the change by the Contractor. The contracting officer and the Contractor shall negotiate the change into the contact under the provisions of the contract clause entitled “Changes”. Failure of the Contractor to submit a price proposal within 30 calendar days following receipt of the change entitles the Government to performance according to such change at no increase in contract price (unless the time requirement is waived by the contracting officer according to Paragraph C of the changes clause). The following table is a representative listing of the applicable publications and forms outlined in the text of the PWS and is not all-inclusive.
PUBLICATION NO.
SECTION/PARA/LINE
TITLE DATE MANDATORY (M)/
ADVISORY (A)
AFI 13-213 Airfield Driving 01 Jun 2011 M
AFI 51-503 Aerospace Accident Investigations
26 May 2010 M
AFI 64-106 Air Force Labor Relations Activities
25 Mar 1994 A
AFI 91-204 Safety Investigations and Reports 08 Apr 2013 M
DODD 5500-7 Standards of Conduct 29 Nov 2007 A
| 2.1. General |
| 2.2. Performance Evaluation |
File details come from the government source that posted it. Updated .