Attachment 7 - AF Form 66.xls
XLS spreadsheet 76 KB Posted
- Attached to
- Upgrade Douglas Street Main Perimeter Federal contract opportunity
- Solicitation number
- FA2816-10-R-0012
About this file
Attachment 7 - AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Reference Drawing 2.JPG | JPG image | |
| Footing Design.pdf | ||
| Intro pictures and layout.pdf | ||
| Reference Drawing 3.JPG | JPG image | |
| Entrance and Exit Gate Plan.pdf | ||
| Reference Drawing 1.JPG | JPG image | |
| Sign in Sheet.pdf | ||
| Site Walk Question and Answer.docx | DOCX document | |
| Attachment 6 - Section 01010 - Environmental Requirements.pdf | ||
| Attachment 2 - Section 07500 - Reclaimed Irrigation Specification.pdf | ||
| Attachment 1 - SOW Douglas Street Gates 9_11_09.doc | DOC document | |
| Attachment 3 - Section 07000 - Landscape Specifications.pdf | ||
| Attachment 9 - Wage Determination.docx | DOCX document | |
| Attachment 5 - Section 02085 - Asbestos Specifications.pdf | ||
| FA2816-10-R-0012.pdf | ||
| Attachment 4 - Section 02086 - Lead-Based Paint Specifications.pdf | ||
| Attachment 10 - ufc Requirement Perimeter Fence and Gate.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION / CONTRACT NO.: | ||||||||||||||||||||||
| ACJP 072028 | Repair Douglas St Main Perimiter Gate | xxx | |||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS | DRAWINGS | COST ESTIMATE | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | ELECTRONIC VERSION (CD or DVD) | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS |
| 1 | Project Manager and designated representatives contact information (SOW Sec 5.8.1) | 2 | 1 | At time of NTP | |||||||||||||||||||||
| 2 | Project Schedule (SOW Sec 5.2) | 2 | 1 | NTP plus 5 working days - Updated weekly | |||||||||||||||||||||
| 3 | Meeting Minutes (SOW Sec 5.5.1) | 2 | 1 | 5 working days after event | |||||||||||||||||||||
| 4 | A-E Design Professionals List (SOW Sec 6.1) | 2 | 1 | Prior to start of Design Phase | |||||||||||||||||||||
| 5 | Schematic Design Submittal (15 percent) (SOW Sec 6.3.1) | 2 | 2 | 2 | Per Project Schedule | ||||||||||||||||||||
| 6 | Preliminary Design submittal (35 percent) (SOW Sec 6.3.2) | 2 | 2 | 2 | Per Project Schedule | ||||||||||||||||||||
| 7 | Progress Design Submittal (65 percent) (SOW Sec 6.3.3) | 2 | 2 | 2 | Per Project Schedule | ||||||||||||||||||||
| 8 | Pre-Final Design Submittal (90 percent) (SOW Sec 6.3.4) | 2 | 2 | 2 | Per Project Schedule | ||||||||||||||||||||
| 9 | Issued for Construction Submittal (100 percent) (SOW Sec 6.3.5) | 3 | 3 | 2 | Per Project Schedule | ||||||||||||||||||||
| 10 | Site Safety Plan (SOW Sec 7.4.3 | 2 | 1 | 5 working days prior to onsite work | |||||||||||||||||||||
| 11 | Work Phasing Plan (SOW Sec 7.2.1) | 2 | 1 | 5 working days after NTP | |||||||||||||||||||||
| 12 | Environmental Protection Plan (Spec Sec 01010 - Section 1.6) | 2 | 1 | 5 working days prior to onsite work | |||||||||||||||||||||
| 13 | List of Equipment Requiring Air Permit (Spec Sec 01010 - Section 1.7) | 2 | 1 | 5 working days prior to onsite work | |||||||||||||||||||||
| 14 | Hazardous Waste Certification & Hazardous Waste Transporter Documentation (Spec Sec 01010 - Section 1.8) | 2 | 1 | As required | |||||||||||||||||||||
| 15 | AF form 3952, MSDS Chemical/Hazardous Material Request Authorization (Spec Sec 01010 - Section 1.9) | 2 | 1 | 5 working days prior to use | |||||||||||||||||||||
| 16 | Hazardous Material Spill/Release Report (Spec Sec 01010 - Section 1.10) | 2 | 1 | As required | |||||||||||||||||||||
| 17 | Green Procurement Determination Form and Estimate/Certification Form (Spec Sec 01010 - Section 1.11) | 2 | 1 | 5 working days prior to onsite work | |||||||||||||||||||||
| 18 | Construction & Demolition Debris Report (Spec Sec 01010 - Section 1.13) | 2 | 1 | As required | |||||||||||||||||||||
| 19 | NPDES General Permit Notice of Intent, SWPPP and Draft Notice of Termination (Spec Sec 01010 - Section 1.14) | 2 | 1 | 5 working days prior to onsite work | |||||||||||||||||||||
| 20 | Lead-Based Paint Abatement Submittals (Spec Sec 01010 - Section 1.15) | 2 | 1 | 5 working days prior to onsite work | |||||||||||||||||||||
| 21 | Asbestos Abatement Submittals (Spec Sec 01010 - Section 1.16) | 2 | 1 | 5 working days prior to onsite work | |||||||||||||||||||||
| 22 | AST Technical Information and Site Specific Spill Plan (Spec Sec 01010 - Section 1.19) | 2 | 1 | As required | |||||||||||||||||||||
| 23 | Construction Material and Shop Drawing Submittals Schedule/Log (SOW Sec 7.2.2) | 2 | 1 | At start of Construction Phase - Updated weekly | |||||||||||||||||||||
| 24 | AF Form 3000, Material Submittals (SOW Sec 7.2.2) | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | As required | ||||||||||||
| 25 | A-E Site Visit Report (SOW Sec 6.4.2) | 2 | 1 | 5 working days after meeting | |||||||||||||||||||||
| 26 | Operations and Maintenance Manuals (SOW Sec 8.3) | 2 | 2 | 30 days after BOD | |||||||||||||||||||||
| 27 | Operations and Maintenance Training Video (SOW Sec 8.3) | 2 | 30 days after BOD | ||||||||||||||||||||||
| 28 | Equipment/Workmanship Warranty Letter (SOW Sec 8.4) | 2 | 2 | 30 days after BOD | |||||||||||||||||||||
| 29 | DD-1354 Transfer and Acceptance of Real Property (Draft / Interim) (SOW Sec 8.5) | 2 | 1 | 20 days prior to BOD | |||||||||||||||||||||
| 30 | DD-1354 Transfer and Acceptance of Real Property (Final) (SOW Sec 8.5) | 2 | 1 | 30 days after BOD | |||||||||||||||||||||
| 31 | Construction Record Drawings (SOW Sec 8.6 and 8.7) | 2 | 1 | 30 days after BOD | |||||||||||||||||||||
| 32 | |||||||||||||||||||||||||
| 33 | |||||||||||||||||||||||||
| 34 | |||||||||||||||||||||||||
| 35 | |||||||||||||||||||||||||
| 36 |
&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 (11-6-08)&C&"Arial,Bold"&8&P of &N&R&"Arial,Bold"&8Appendix B Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
File details come from the government source that posted it. Updated .