This document contains questions and answers from a pre-proposal site visit for a solicitation to replace street light poles and fixtures at Patrick Air Force Base in Florida. The contractor shall provide all labor, materials, equipment, transportation, and supervision to remove existing concrete light poles and fixtures throughout the base and replace them in accordance with contract specifications and applicable regulations. Nine light poles near Buildings 820 and 821 have been identified for salvage. New wire, conduit, and ground rods are required for each pole. The voltage ranges from 120-277V and 347-480V depending on the color of the photocell on each fixture. A minimum four foot allowance for new conduit should be included where handholes are damaged. The period of performance can be adjusted to 180 days after issuance of notice to proceed due to pandemic-related material delivery timelines of 60 days.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1409_ABSTRACT OF OFFERS.pdf | ||
| Answers_FA252120B0010.pdf | ||
| Solicitation Amendment FA252120B00100001 SF 30.pdf | ||
| Atch 2 Drawings.pdf | ||
| Solicitation - FA252120B0010.pdf | ||
| Atch 7 HAZWST Form.doc | DOC document | |
| Atch 5 Badge Request (45 SFS).pdf | ||
| Atch 3 CECC Form 3052.xls | XLS spreadsheet | |
| Atch 1 Technical Specifications .pdf | ||
| Atch 4-WD FL20200001 (03Jul2020).pdf | ||
| Atch 6 GPP Form.pdf | ||
| Atch 8 Questions and Answers Template.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation FA252120B0010
Replace Street Light Poles and Fixtures, Various (SXHT13-1232) Patrick AFB, FL
Pre-Proposal Site Visit Questions and Answers
SXHT 13-1232 Replace Light Poles – Pre-proposal Inquiries 5 August 2020
1. Question: Will there be a designated storage area for materials and equipment, what are the dimensions?
45 CES Response: Refer to Specification section 01 11 00.00 30 paragraph 1.8 for procedures to request a storage/laydown area.
2. Question: Can all salvageable materials be identified?
45 CES Response: The 45 CES Electrical Shop has identified approximately 9 light poles in the area surrounding Buildings 820 and 821 that are to be salvaged. An amendment to the drawings will be issued to reflect this.
3. Question: What kind of splices/wirenuts will be required when re-connecting wires coming from the pole to the pullbox?
45 CES Response: Refer to Specification section 26 05 00.00 40 paragraph 3.2.1.8 for splice type(s).
4. Question: What allowance can we use for burnt wire and bad conduit if replacement is needed?
45 CES Response: Provide new wire and conduit from the handhole to the light fixture, as shown on sheet DT-601. Where there are damaged handholes, as indicated in the drawings, the replacement should include a minimum 4 ft allowance for new conduit installation to repair damage to existing.
5. Question: What is the voltage in each zone?
45 CES Response: The voltage varies; the existing fixtures accept multiple voltages within a range. 120-277V and 347-480V are the ranges of the existing fixtures. The color of the photocell on top of the fixture indicates the voltage range.
6. Question: Wire size required if replacement is needed?
45 CES Response: Refer to sheet DT-601, TYPICAL CONCRETE LIGHT POLE DETAIL, for minimum wire size required
7. Question: Are there grounding rods at each pole at this time, or should cost be considered in bid?
45 CES Response: Refer to sheet DT-601, a new ground rod is required for each pole.
8. Question: Is there a specified color for the light pole replacement?
45 CES Response: The Gov’t intends to perform color selection during the submittal stage.
9. Question: Could the current timeframe be adjusted to 180 days? Considering material delivery date for material is 60 days due to the pandemic?
45 CES Response: Period of performance can be adjusted to 180 days after issuance of