Attach_1_-_DBEH_17-1612_ELEC_REDUND_-_FINAL_DWGS_REV1.pdf
PDF 2 MB Posted
- Attached to
- Repair Electrical Redundancy, Building 85125, CCAFS, FL Federal contract opportunity
- Solicitation number
- FA252119BA017
About this file
FA252119BA017 Attachment 1 - Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA252119BA017_ABSTRACT_OF_OFFERS.pdf | ||
| Solicitation_Amendment_FA252119BA0170003_SF_30.pdf | ||
| FA252119BA017_ADDL_PRE-BID_QUESTIONS_-_Consolidated.pdf | ||
| WD_FL20190001_30_Aug_19.pdf | ||
| DBEH_17-1612_C-501_REV1.pdf | ||
| FA252119BA017_PRE-BID_QUESTIONS.pdf | ||
| FA252119BA0170002_SF_30.pdf | ||
| Solicitation_Amendment_FA252119BA0170001_SF_30.pdf | ||
| Attach_6_-__45_SFS_Badge_Request_Form.pdf | ||
| Attach_4_-_DBEH_17-1612_ELEC_REDUND_-_GPP_Form.pdf | ||
| Attach_7_-__KTR_Hazardous_Waste_Generation_Form.doc | DOC document | |
| Attach_5_-_DBEH_17-1612_ELEC_REDUND_-_100__Submittal_Register.xlsx | XLSX spreadsheet | |
| Solicitation_-_FA252119BA017_RLSD.pdf | ||
| Attach_2_-_DBEH_17-1612_ELEC_REDUND_-_100__Specs.pdf | ||
| Attach_8_-_CECC_Form_3052.xls | XLS spreadsheet | |
| Attach_3_-_WD_FL20190001_10_May_19.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
2 3
C
D
1 2 3
4 5 6
S
B
U I L T
D
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
C O
N T
R A
N
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
G E
R C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d e s b r i t o
H
I
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
Y
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
M
G
O N
Z A
L E
Z
B
K
O L A
K
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED
IN ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING
OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
X
X
X
X
X
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
E
D
DBEH 17-1612
REPAIR ELECTRICAL REDUNDANCY SYSTEM
CCAFS, HQ 85125
TRUE
NORTH
N
G-001
L O
C A
T I O
N
M
P
D E
X
PROJECT LOCATION
DRAWING INDEX
Sheet Number Sheet Title REV
G-001 LOCATION MAP & INDEX
G-002 GENERAL NOTES & LEGENDS
G-003 PHASING PLAN - PART 1
G-004 PHASING PLAN - PART 2
G-005 PHASING PLAN - PART 3
CIVIL
C-001 CIVIL GENERAL NOTES & SYMBOLS
C-101 EXISTING CONDITIONS AND DEMOLITION PLAN
C-102 CIVIL SITE PLAN
C-501 CIVIL DETAILS
C-502 STORMWATER POLLUTION PREVENTION PLAN I
C-503 STORMWATER POLLUTION PREVENTION PLAN II
ELECTRICAL
E-001 GENERAL NOTES & SYMBOLS
ED-101 ELECTRICAL DEMOLITION SITE PLAN
ED-102 ELECTRICAL DEMOLITION FLOOR PLAN
ED-103 CONTROLS DEMOLITION FLOOR PLAN
E-101 ELECTRICAL SITE PLAN
E-102 ELECTRICAL FLOOR PLAN
E-103 GROUNDING SITE PLAN
E-104 CONTROLS SITE PLAN
E-601 ELECTRICAL SINGLE LINE DIAGRAM
E-602 CONTROLS SINGLE LINE DIAGRAM
LOCATION MAP
SCALE: N.T.S.
NOTE: PROJECT AREA DOES NOT REQUIRE FDEP NPDES PERMIT;
HOWEVER, A SWPPP IS REQUIRED.
1. CONSTRUCTION ACTIVITIES AND PLANNED OUTAGES MUST BE COORDINATED WITH THE CONTRACTING
OFFICER TO MINIMIZE IMPACT TO FACILITY OPERATIONS.
2. CONTRACTOR WILL PLAN ALL WORK AND PROVIDE ADDITIONAL LABOR, EXTEND SHIFTS, WORK
NON-STANDARD HOURS, PROVIDE TEMPORARY NORMAL AND STAND-BY POWER IF REQUIRED AT NO
ADDITIONAL COST TO THE GOVERNMENT TO ENSURE THE FACILITY IS FULLY OPERATIONAL AND HAS
ELECTRICAL REDUNDANCY DURING OPERATION HOURS.
3. CONTRACTOR MUST BE RESPONSIBLE FOR TESTING CONCRETE FOR ASBESTOS PER SPECIFICATION 01
57 19 TEMPORARY ENVIRONMENTAL CONTROLS PRIOR TO CUTTING OPERATIONS FOR DISPOSAL OF
STRUCTURES SHOWN TO BE REMOVED OR DEMOLISHED.
4. CONTRACTOR MUST COORDINATE WITH 45 CEIE PRIOR TO CONSTRUCTION ACTIVITIES FOR A GOPHER
TORTOISE SURVEY.
5. A REQUEST FOR FDEP PERMIT CLEARANCE MUST BE APPROVED PRIOR TO PLACING NEW GENERATOR
INTO SERVICE. PROVIDE 45 DAY NOTIFICATION PRIOR TO INSTALLATION OF ANY STORAGE TANK AND
SEVEN (7) DAY NOTIFICATION PRIOR TO PLACING FUEL IN STORAGE TANKS.
6. DURING DEMOLITION, THE EXISTING ELECTRICAL EQUIPMENT, MATERIALS AND ACCESSORIES THAT ARE
TO BE REMOVED BELONG TO THE BASE OPERATIONS SUPPORT CONTRACTOR FOR FIRST RIGHT OF
REFUSAL TO KEEP AS SPARE PARTS; THE CONTRACTOR SHALL COORDINATE THESE ITEMS WITH THE
BASE OPERATIONS SUPPORT CONTRACTOR.
ABBREVIATIONS:
LEGEND:
BENCHMARK LOCATION
EXISTING POST-INDICATOR VALVE
EXISTING VALVE
EXISTING BACKFLOW PREVENTION
EXISTING FIRE HYDRANT
EXISTING COMMUNICATI0NS MANHOLE
EXISTING ELECTRIC MANHOLE
EXISTING SANITARY SEWER MANHOLE
EXISTING SANITARY SEWER HANDHOLE
EXISTING LIGHT POLE
EXISTING WET WELL VENT
EXISTING HOSE BIBB
CONCRETE BOLLARD
METAL BOLLARD
LIFT STATION CONTROL PANEL
EXISTING ASPHALT
EXISTING CONCRETE
EXISTING GRAVEL
EXISTING RIP RAP RETENTION WALL
EXISTING SOD AREA
AREA TO BE DEMOED
EXISTING VEGETATION
C
E
SM
S
V
BLG
SF
EFF
CHT
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
M
G
O N
Z A
L E
Z
B
K
O L A
K
G-002
G E
N E
R A
L
N
O T
G
E N
D S
GENERAL NOTES:
AC ASBESTOS CEMENT
AF AIR FORCE
APPOX. APPROXIMATE
ARCHEO. ARCHEOLOGICAL
AWG AMERICAN WIRE GAUGE
BLG BUILDING
CCAFS CAPE CANAVERAL AIR FORCE STATION
CEIE DEPARTMENT OF CIVIL, ENVIROMENTAL AND INFRASTRUCTURE ENGINEERING
CHT COLLECTION, HOLDING AND TRANSFER
COMM COMMUNICATION
CX COMPLEX
DI DUCTILE IRON
DOM. DOMESTIC
EOP EDGE OF PAVEMENT
ERP ENVIRONMENTAL RESOURCE PERMIT
ESP ELECTRIC SERVICE PANEL
ET ELECTRIC TRANSFORMER
ETR EXISTING TO REMAIN
FBE FUSION BONDED EPOXY
FDEP FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FE FLANGED END
FL FLANGED
FM FORCEMAIN
FRP FIBERGLASS REINFORCEMENT POLYESTER
HB HOSE BIB
HDPE HIGH DENSITY POLYETHYLENE PIPE
HGR HANGAR
HH HANDHOLE
HS HYDRANT STATION
LF LINEAR FEET
LS LIFT STATION
IND. INDUSTRIAL
MIN. MINIMUM
MJ MECHANICAL JOINT
MH MANHOLE
MMH MISCELLANEOUS MANHOLE
MTL. METAL
NEC NATIONAL ELECTRICAL CODE
NO. NUMBER
NOI NOTICE OF INTENT
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
O.C. ON CENTER
OPS OPERATIONS
PVC POLYVINYL CHLORIDE PIPE
RCP REINFORCED CONCRETE PIPE
RSC GALVANIZED RIGID STEEL CONDUIT
SCH SCHEDULE
SSMH SANITARY MANHOLE
SSHH SANITARY HANDHOLE
SW SOUTHWEST
SWPPP STORMWATER POLLUTION PREVENTION PLAN
SQ. SQUARE
SSx SANITARY SEWER PIPE
TWWTP TRIDENT WASTEWATER TREATMENT PLANT
TYP. TYPICAL
VP VALVE PIT
UG UNDERGROUND
WW WET WELL
EXISTING ABANDON WATER
EXISTING FIRE WATER
EXISTING POTABLE WATER
EXISTING UG ELECTRIC
EXISTING AERIAL ELECTRIC
EXISTING COMMUNICATION
EXISTING SANITARY SEWER
EXISTING SANITARY SEWER FORCE MAIN
EXISTING NATURAL GAS
EXISTING STORM DRAIN
EXISTING EFFLUENT
EXISTING FENCE LINE
EXISTING ABANDONED IN PLACE
EXISTING CONTOURS
NEW SILT FENCE
NEW SANITARY SEWER FORCE MAIN
NEW WATER
NEW BILGE
NEW SANITARY SEWER
NEW COLLECTION, HOLDING AND TRANSFER
SAWCUT
13.2KV
FED FROM SOUTH SUBSTATION
EXISTING
MV SWITCH DLIG3
15KV
600A
13.2KV
FED FROM NORTH SUBSTATION
EXISTING
GENERATOR
TAP BOX-1
G
EXISTING GENERATOR
4160VAC
1000KW
EXISTING 1SWB1
480VAC
2000A
3PH 3W
350A
/3P
EXISTING 1CSWB1
480VAC
600A
3PH 3W
EXISTING LOADS
GEN BREAKER
/3P
EXISTING LOADS
EXISTING
UTILITY MAIN
2000A
/3P
EXISTING
GEN MAIN
2000A
/3P
E N
EXISTING
ATS-1
400A
L
N E
L
EXISTING
ATS-2
400A
EXISTING
CBKR-1
350A
/3P
EXISTING
CBKR-2
350A
/3P
EXISTING
GENERATOR
TAP BOX-2
4160VAC
480/277VAC
T-GEN
EXISTING
13.2KV
480/277VAC
DLOC1
EXISTING
225KVA
13.2KV
480/277VAC
DLOI2
EXISTING
1500KVA
SPECIFIC NOTES:
1. SINGLE LINE DIAGRAM SHOWN FOR PROJECT ELECTRICAL PHASING PURPOSES ONLY. REFER
TO SHEET E-601 FOR FINAL ELECTRICAL SYSTEM CONFIGURATION, CONDUIT, AND CONDUCTOR
INFORMATION.
2. CONSTRUCTION ACTIVITIES AND PLANNED OUTAGES MUST BE COORDINATED WITH THE
CONTRACTING OFFICER TO MINIMIZE IMPACT TO FACILITY OPERATIONS.
3. CONTRACTOR WILL PLAN ALL WORK AND PROVIDE ADDITIONAL LABOR, EXTEND SHIFTS, WORK
NON-STANDARD HOURS, PROVIDE TEMPORARY NORMAL AND STAND-BY POWER IF REQUIRED
AT NO ADDITIONAL COST TO THE GOVERNMENT TO ENSURE THE FACILITY IS FULLY
OPERATIONAL AND HAS ELECTRICAL REDUNDANCY THROUGHOUT CONSTRUCTION.
4. ELECTRICAL PHASING IS NOTIONAL AND FOR CONTRACTOR INFORMATION PURPOSES ONLY.
CONTRACTOR MUST DEVELOP AN INDEPENDENT ELECTRICAL PHASING PLAN BASED ON
CONSTRUCTION SCHEDULE AND MEANS AND METHODS EMPLOYED. SUBMIT PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL PRIOR TO BEGINNING WORK. REFER TO PROJECT
PHASING NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION.
PHASING NOTES:
1. DEMOLISH CONDUCTORS FEEDING SWITCHBOARD 1CSWB1 FROM ATS-2.
2. DEMOLISH CONDUCTORS FROM 350A CIRCUIT BREAKER IN SWITCHBOARD 1SWB1
SUPPLYING ATS-1.
3. RE-SUPPLY SWITCHBOARD 1CSWB1 FROM SWITCHBOARD 1SWB1 USING 350A CIRCUIT
BREAKER PREVIOUSLY FEEDING ATS-1.
4. DEMOLISH ATS-1, ATS-2, CBKR-1, CBKR-2, TRANSFORMER DLOC1 AND GENERATOR TAP BOX-2
AS INDICATED IN ELECTRICAL DRAWINGS.
5. INSTALL KEYED MECHANICAL INTERLOCKS ON SWITCHBOARD 1SWB1 MAIN BREAKERS AS
INDICATED IN ELECTRICAL DRAWINGS.
6. REFER SHEETS G-004 AND G-005 FOR INSTALLATION PHASING.
NEW WORK AREA
DEMOLITION AREA
SYMBOLS:
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
M
G
O N
Z A
L E
Z
B
K
O L A
K
G-003
P H
A S
I N
G
P
L A
N
P
A R
T
EXISTING
MV SWITCH DLIG4
15KV
600A
EXISTING
MV SWITCH DLOI2
15KV
600A
PHASING PLAN - PART 1
SCALE: N.T.S.
KEYED
MECHANICAL
INTERLOCK
EXISTING
MV SWITCH DLOI2
15KV
600A
EXISTING 1CSWB1
480VAC
600A
3PH 3W
EXISTING LOADS
13.2KV
FED FROM NORTH SUBSTATION
G
TEMPORARY ROLL-UP
GENERATOR
480VAC
600KW
EXISTING
GENERATOR
TAP BOX
EXISTING 1SWB1
480VAC
2000A
3PH 3W
350A
/3P
EXISTING LOADS
EXISTING
UTILITY MAIN
2000A
/3P
EXISTING
GEN MAIN
2000A
/3P
GEN BREAKER
/3P
13.2KV
480/277VAC
DLOI2
EXISTING
1500KVA
SPECIFIC NOTES:
PHASING NOTES:
1. INSTALL NEW 600KW, 480VAC, 3PH 3W TEMPORARY ROLL-UP GENERATOR TO REPLACE
EXISTING 4160VAC GENERATOR AND GENERATOR TRANSFORMER.
A. TEMPORARY GENERATOR WILL BE INSTALLED, TESTED AND APPROVED BY CONTRACTING
OFFICER PRIOR TO DECOMMISSIONING OF EXISTING GENERATOR.
B. TRANSITION GENERATOR CONTROL START SIGNAL FROM EXISTING GENERATOR TO
TEMPORARY GENERATOR.
C. DECOMMISSION AND REMOVE EXISTING 1000KW, 4160VAC GENERATOR AS INDICATED IN
ELECTRICAL DRAWINGS. COORDINATE WITH CONTRACTING OFFICER TO OBTAIN THE
CORRECT PAPERWORK AND CONFIRM DISPOSAL OF GOVERNMENT PROPERTY.
2. INSTALL NEW TRANSFORMER TB, ECB MAIN B, PERMANENT GENERATOR, ATS-A, ATS-B, TA
BYPASS MTS, SCADA ENCLOSURE, FIBER OPTIC LINE, RELOCATED METER E02 AND CONTROLS
AS INDICATED IN ELECTRICAL DRAWINGS.
A. INSTALL B-SIDE NEUTRAL CONDUCTORS TO EXISTING SWITCHBOARD 1SWB1 AND COIL
WITH SUFFICIENT LENGTH OF CONDUCTORS FOR FUTURE BONDING WITH A-SIDE NEUTRAL
CONDUCTORS INSTALLED IN PART 3.
3. TRANSITION NORMAL AND STAND-BY POWER SOURCES FROM EXISTING TRANSFORMER TA
AND TEMPORARY GENERATOR TO NEW TRANSFORMER TB AND PERMANENT GENERATOR VIA
ATS-B AND TA BYPASS MTS TO EXISTING SWITCHBOARD 1SWB1.
A. NEW EQUIPMENT WILL BE INSTALLED, INTERFACED WITH SCADA SYSTEM, TESTED AND
APPROVED BY CONTRACTING OFFICER PRIOR TO DECOMMISSIONING OF EXISTING
EQUIPMENT.
B. SET EXISTING SWITCHBOARD 1SWB1 CONTROLS TO MANUAL MODE, OPEN UTILITY MAIN
CIRCUIT BREAKER AND CLOSE GEN MAIN CIRCUIT BREAKER PRIOR TO TRANSITIONING TO
NEW EQUIPMENT.
C. ONCE TRANSITION TO NEW EQUIPMENT IS COMPLETE RE-LABEL EXISTING UTILITY MAIN
AND GEN MAIN CIRCUIT BREAKERS TO MAIN-1 AND MAIN-2 RESPECTIVELY.
4. DECOMMISSION AND REMOVE TEMPORARY GENERATOR.
6. REFER SHEETS G-003 AND G-005 FOR INSTALLATION PHASING.
NEW WORK AREA
DEMOLITION AREA
PHASING SYMBOLS:
G
EXISTING GENERATOR
4160VAC
1000KW
GEN BREAKER
/3P
4160VAC
480/277VAC
T-GEN
EXISTING
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
M
G
O N
Z A
L E
Z
B
K
O L A
K
G-004
P H
A S
I N
G
P
L A
N
P
A R
T
1. SINGLE LINE DIAGRAM SHOWN FOR PROJECT ELECTRICAL PHASING PURPOSES ONLY. REFER
TO SHEET E-601 FOR FINAL ELECTRICAL SYSTEM CONFIGURATION, CONDUIT, AND CONDUCTOR
INFORMATION.
2. CONSTRUCTION ACTIVITIES AND PLANNED OUTAGES MUST BE COORDINATED WITH THE
CONTRACTING OFFICER TO MINIMIZE IMPACT TO FACILITY OPERATIONS.
3. CONTRACTOR WILL PLAN ALL WORK AND PROVIDE ADDITIONAL LABOR, EXTEND SHIFTS, WORK
NON-STANDARD HOURS, PROVIDE TEMPORARY NORMAL AND STAND-BY POWER IF REQUIRED
AT NO ADDITIONAL COST TO THE GOVERNMENT TO ENSURE THE FACILITY IS FULLY
OPERATIONAL AND HAS ELECTRICAL REDUNDANCY THROUGHOUT CONSTRUCTION.
4. ELECTRICAL PHASING IS NOTIONAL AND FOR CONTRACTOR INFORMATION PURPOSES ONLY.
CONTRACTOR MUST DEVELOP AN INDEPENDENT ELECTRICAL PHASING PLAN BASED ON
CONSTRUCTION SCHEDULE AND MEANS AND METHODS EMPLOYED. SUBMIT PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL PRIOR TO BEGINNING WORK . REFER TO PROJECT
PHASING NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION
65°
1200AF/1080AT
3P
ECB MAIN B
480VAC
1200A
3PH 3W
13.2KV
480/277VAC
TB
(NEW)
750KVA
ATS-B
480VAC
1200A
3PH 3W
E
N
L
TA BYPASS
480VAC
1200A
3PH 3W
EN
L
G
GENERATOR
480VAC
600KW
3PH 3W
GEN BREAKER
1200AF/1080AT
3P
CONTROL
EXISTING
MV SWITCH DLIG4
15KV
600A
EXISTING
MV SWITCH DLIG3
15KV
600A
PHASING PLAN - PART 2
SCALE: N.T.S.
ATS-A
480VAC
1200A
3PH 3W
EN
L
KEYED
13.2KV
480/277VAC
DLOI2
EXISTING
1500KVA
SPECIFIC NOTES:
PHASING NOTES:
1. DEMOLISH MEDIUM VOLTAGE SWITCH DLOI2 AND TRANSFORMER DLOI2 AS INDICATED IN
DEMOLITION SHEET ED-101.
2. INSTALL NEW TRANSFORMER TA, ECB MAIN A, TA PULL BOX, RELOCATED METER E01 AND
CONTROLS AS INDICATED IN ELECTRICAL DRAWINGS.
3. TRANSITION SWITCHBOARD 1SWB1 PRIMARY NORMAL SOURCE FROM TRANSFORMER TB TO
TRANSFORMER TA VIA ECB MAIN A, ATS-A AND TA PULL BOX TO SWITCHBOARD 1SWB1 MAIN 1.
A. NEW EQUIPMENT WILL BE INSTALLED, INTERFACED WITH SCADA SYSTEM, TESTED AND
APPROVED BY CONTRACTING OFFICER PRIOR TO FINAL CONNECTION.
B. OPEN SWITCHBOARD 1SWB1 MAIN-2 CIRCUIT BREAKER AND CLOSE MAIN-1 CIRCUIT
BREAKER.
C. SWITCHBOARD 1SWB1 TO REMAIN IN MANUAL MODE.
NEW WORK AREA
DEMOLITION AREA
PHASING SYMBOLS:
TA PULL BOX
EXISTING 1CSWB1
480VAC
600A
3PH 3W
EXISTING LOADS
EXISTING 1SWB1
480VAC
2000A
3PH 3W
350A
/3P
EXISTING LOADS
EXISTING
MAIN 1
2000A
/3P
EXISTING
MAIN 2
2000A
/3P
EXISTING
GENERATOR
TAP BOX
13.2KV
FED FROM NORTH SUBSTATION
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
M
G
O N
Z A
L E
Z
B
K
O L A
K
G-005
P H
A S
I N
G
P
L A
N
P
A R
T
1. SINGLE LINE DIAGRAM SHOWN FOR PROJECT ELECTRICAL PHASING PURPOSES ONLY. REFER
TO SHEET E-601 FOR FINAL ELECTRICAL SYSTEM CONFIGURATION, CONDUIT, AND CONDUCTOR
INFORMATION.
2. CONSTRUCTION ACTIVITIES AND PLANNED OUTAGES MUST BE COORDINATED WITH THE
CONTRACTING OFFICER TO MINIMIZE IMPACT TO FACILITY OPERATIONS.
3. CONTRACTOR WILL PLAN ALL WORK AND PROVIDE ADDITIONAL LABOR, EXTEND SHIFTS, WORK
NON-STANDARD HOURS, PROVIDE TEMPORARY NORMAL AND STAND-BY POWER IF REQUIRED
AT NO ADDITIONAL COST TO THE GOVERNMENT TO ENSURE THE FACILITY IS FULLY
OPERATIONAL AND HAS ELECTRICAL REDUNDANCY THROUGHOUT CONSTRUCTION.
4. ELECTRICAL PHASING IS NOTIONAL AND FOR CONTRACTOR INFORMATION PURPOSES ONLY.
CONTRACTOR MUST DEVELOP AN INDEPENDENT ELECTRICAL PHASING PLAN BASED ON
CONSTRUCTION SCHEDULE AND MEANS AND METHODS EMPLOYED. SUBMIT PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL PRIOR TO BEGINNING WORK . REFER TO PROJECT
PHASING NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION
65°
1200AF/1080AT
3P
ECB MAIN B
480VAC
1200A
3PH 3W
ATS-B
480VAC
1200A
3PH 3W
E
N
L
TA BYPASS
480VAC
1200A
3PH 3W
EN
L
G
GENERATOR
480VAC
600KW
3PH 3W
GEN BREAKER
1200AF/1080AT
3P
750KVA
(NEW)
TB
480/277VAC
13.2KV
ATS-A
480VAC
1200A
3PH 3W
EN
L
1200AF/1080AT
3P
ECB MAIN A
480VAC
1200A
3PH 3W
65°
13.2KV
480/277VAC
TA
(NEW)
750KVA
CONTROL
EXISTING
MV SWITCH DLIG4
15KV
600A
EXISTING
MV SWITCH DLIG3
15KV
600A
EXISTING
MV SWITCH DLOI2
15KV
600A
PHASING PLAN - PART 3
SCALE: N.T.S.
KEYED
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
J
L O
N G
S H
O R
E
J
L O
N G
S H
O R
E
C-001
C I V
N
E R
T
M
B O
L S
UNLESS OTHERWISE SPECIFIED, ALL WORK MUST BE PERFORMED CONSISTENT WITH THE RULES AND REQUIREMENTS
OF THE FOLLOWING:
· CAPE CANAVERAL AIR FORCE STATION
· ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
· FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES SHOWN ARE THE
BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS BUT DO NOT PURPORT TO BE ABSOLUTELY
CORRECT. THERE MAY BE OTHER UNKNOWN IMPROVEMENTS, SUCH AS UTILITIES, WHICH ARE WITHIN THE PROJECT AREA.
VERIFY, PRIOR TO CONSTRUCTION, THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (WHETHER OR NOT SHOWN ON THE PLANS) AFFECTING THE WORK.
2. ON JULY 3, 2019 SUNRISE SYSTEMS OF BREVARD, INC. COLLECTED A TOTAL OF THREE (3) BULK CONCRETE SAMPLES, ONE (1)
FROM EACH OF THE THREE (3) EXISTING SLABS IDENTIFIED FOR MODIFICATION, AND THE RESULTS OF THE LABORATORY
ANALYSIS, PERFORMED BY SCHNEIDER LABORATORIES GLOBAL, INC., WERE "NON-DETECTED" FOR ASBESTOS CONTAINING
MATERIAL.
3. FIELD LOCATE ALL EXISTING UTILITIES AS TO SIZE, LOCATION, AND ELEVATION. NOTIFY THE CONTRACTING OFFICER OF ALL
CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. CONFIRM THE ACCURACY OF ALL SURVEY AND OTHER GRADING DATA.
4. FIELD CONDITIONS MAY NECESSITATE SLIGHT ALIGNMENT AND GRADE DEVIATION OF THE PROPOSED CONSTRUCTION TO
AVOID OBSTACLES, AS AGREED TO BY THE CONTRACTING OFFICER.
5. WORK THE SCOPE CONTAINED ON THE CIVIL DRAWINGS IN COORDINATION WITH ALL OTHER DISCIPLINES TO LOCATE
DEPRESSED SLABS, SLOPES, DRAINS, BOLT SETTINGS, AND GRADES, AND CALL OUT ANY DISCREPANCIES TO THE ATTENTION
OF THE CONTRACTING OFFICER BEFORE PROCEEDING WITH THE WORK.
6. REVIEW THESE DRAWINGS AND VISIT THE SITE BEFORE CONSTRUCTION BEGINS TO COMPARE ALL EXISTING CONDITIONS TO
WHAT IS SHOWN ON THE DRAWINGS. IF THERE ARE VARIANCES, NOTIFY THE CONTRACTING OFFICER.
7. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS ON THE INTERACTION OF VARIOUS CONNECTED
COMPONENTS. PROVIDE ADEQUATE BRACING, SHORING, AND OTHER TEMPORARY SUPPORTS AS REQUIRED BY SITE
CONDITIONS AND FOR SAFE WORK CONDITIONS.
8. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO ORDERING ANY MATERIALS AND NOTIFY THE CONTRACTING
OFFICER IF DIFFERENT FROM WHAT IS SHOWN ON THE DRAWINGS.
9. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND INTENDED TO APPLY TO ANY
SIMILAR SITUATION ELSEWHERE ON THE PROJECT, EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
10. SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE CONTRACTING OFFICER AND PROJECT STAKEHOLDERS TO REVIEW
THE CONSTRUCTION SCHEDULE, CRITICAL MILESTONES AND OUTAGES AND REVIEW/CLARIFY REQUESTS FOR INFORMATION.
11. SUBMIT SHOP DRAWINGS WITH COORDINATED TRADES TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR
TO THE START OF CONSTRUCTION.
12. GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND PERMIT CONDITIONS BEARING ON
THE CONDUCT OF THE WORK AS DRAWN AND SPECIFIED. IF THE CONTRACTOR OBSERVES THAT THE DRAWINGS AND
SPECIFICATIONS ARE AT VARIANCE, PROMPTLY NOTIFY THE CONTRACTING OFFICER, IN WRITING, AND ANY NECESSARY
CHANGES MUST BE ADJUSTED, AS PROVIDED IN THE AGREEMENT FOR CHANGES IN THE WORK.
13. BE RESPONSIBLE FOR THE ACTS AND OMISSIONS OF CONTRACTOR'S EMPLOYEES AND ALL THEIR SUBCONTRACTORS AND
THEIR AGENTS AND EMPLOYEES AND OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE
CONTRACTOR.
14. IF THE CONTRACTOR DISCOVERS ANY ERRORS OR OMISSIONS IN THE PLANS, IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
15. PRESERVE AND PROTECT ALL PERMANENT REFERENCE MONUMENTS, PERMANENT CONTROL POINTS, PERMANENT BENCH
MARKS AND PROPERTY CORNERS. IF THE MONUMENTS, POINTS OR MARKERS ARE DISTURBED, EMPLOY A FLORIDA
REGISTERED LAND SURVEYOR TO RESET OR REPLACE THEM.
16. BE RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS WITH THE U.S. AIR FORCE, PUBLIC UTILITIES, PUBLIC
CARRIERS, SERVICE COMPANIES, AND OTHER AGENCIES HAVING JURISDICTION OWNING OR CONTROLLING ROADWAYS, WATER, SEWER, GAS, ELECTRICAL, AND TELEPHONE SUCH AS PAVEMENTS, PIPING, WIRES, CABLES, CONDUITS, POLES, GUYS
OR OTHER SIMILAR FACILITIES, INCLUDING INCIDENTAL STRUCTURES THAT ARE ENCOUNTERED IN THE WORK SUCH THAT
ITEMS MAY BE PROPERLY SUPPORTED, PROTECTED OR LOCATED.
17. THE OWNER, OWNER'S AGENT AND INSPECTORS OF APPLICABLE GOVERNMENT JURISDICTIONS, MUST AT ALL TIMES HAVE
ACCESS TO THE WORK WHEREVER AND WHENEVER IT IS IN PREPARATION OR PROGRESS; AND THE CONTRACTOR MUST
PROVIDE PROPER FACILITIES FOR SUCH ACCESS AND FOR THE INSPECTION.
18. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE ALL REASONABLE AND PRUDENT PRECAUTIONS TO ENSURE THAT ALL
COMPLETED WORK, MATERIALS AND EQUIPMENT STORED ON SITE ARE SAFE AND SECURED FROM UNAUTHORIZED ACCESS, USE, THEFT, OR VANDALISM. SUCH PRECAUTIONS MAY INCLUDE INSTALLATION OF SIGNS, FENCES, OR POSTING OF
SECURITY GUARDS.
19. PRIOR TO INITIATING ANY EXCAVATION (INCLUDING BUT NOT LIMITED TO DITCHES, STORMWATER PONDS, CANALS), INSTALL
FENCES AND TAKE ALL OTHER REASONABLE AND PRUDENT STEPS TO ENSURE THAT ACCESS TO EXCAVATION BY
UNAUTHORIZED PERSONNEL IS PREVENTED.
20. USE ALL NORMALLY ACCEPTED AND REASONABLY EXPECTED SAFETY PRACTICES AND COMPLY WITH ALL FEDERAL, STATE
AND LOCAL REGULATIONS, ORDINANCES AND GUIDELINES PERTAINING TO SAFE UTILIZATION OF EQUIPMENT OR MATERIALS
AS PUBLISHED BY MANUFACTURER.
21. COMPLY WITH ALL FEDERAL OCCUPATIONAL HEALTH AND SAFETY ACT RULES AND REGULATIONS AND APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS PERTAINING TO JOB SAFETY AND HEALTH.
22. ALL WORK PERFORMED UNDER THE CONTRACT, AND ALL EQUIPMENT, APPLIANCES, TOOLS AND LIKE ITEMS USED IN THE
WORK MUST CONFORM TO APPLICABLE SAFETY CODES AND REGULATIONS OF ANY PUBLIC OR OTHER AUTHORITY HAVING
JURISDICTION. IN THE EVENT OF CONFLICTING REQUIREMENTS, THE MORE STRINGENT INTERPRETATION OR REGULATION
WILL GOVERN. TAKE ALL REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND PROVIDE ALL REASONABLE PROTECTION TO
PREVENT DAMAGE, INJURY OR LOSS TO:
A. ALL EMPLOYEES ON THE WORK AND ALL OTHER PERSONS WHO MAY BE AFFECTED;
B. ALL THE WORK AND ALL MATERIALS AND EQUIPMENT USED, WHETHER IN STORAGE ON OR OFF THE SITE, UNDER THE
CARE, CUSTODY OR CONTROL OF THE CONTRACTOR OR ANY OF ITS SUBCONTRACTORS;
C. OTHER PROPERTY AT THE SITE OR ADJACENT TO IT, INCLUDING TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAY, STRUCTURES AND UTILITIES NOT DESIGNATED FOR DEMOLITION DURING CONSTRUCTION.
23. ERECT AND MAINTAIN, AS REQUIRED BY EXISTING CONDITIONS AND PROGRESS OF THE WORK, ALL REASONABLE
SAFEGUARDS FOR SAFETY AND ENVIRONMENTAL PROTECTION, INCLUDING POSTING DANGER SIGNS AND OTHER WARNINGS
AGAINST HAZARDS, PROMULGATING SAFETY REGULATIONS AND NOTIFYING OWNERS AND USERS OF ADJACENT UTILITIES OF
THE EXISTENCE OF HAZARDS AND OF THE SAFETY OR ENVIRONMENTAL REGULATIONS.
24. SUBSTANTIALLY ENCLOSED WITH ADEQUATE PROTECTION THOSE PARTS OF WORK IN PLACE WHICH ARE SUBJECT TO
DAMAGE BECAUSE WORK IN ADJACENT AREAS AT CONTRACTOR'S EXPENSE.
25. FURNISH AND MAINTAIN ADEQUATE TRAFFIC CONTROL, BARRICADES AND FLAGMAN SERVICES BY THE CONTRACTOR AT ALL
POINTS WHERE CONVEYING EQUIPMENT ENGAGED ON THE WORK REGULARLY ENTERS ONTO OR CROSSES
TRAFFIC-CARRYING ROADS.
26. USE, HANDLE, TRANSPORT, AND DISPOSE OF ALL HAZARDOUS MATERIALS IN COMPLIANCE WITH ALL FEDERAL, STATE AND
LOCAL ENVIRONMENTAL, HEALTH OR SAFETY LAWS, AND REQUIREMENTS.
27. CONTRACTOR AND ITS SUBCONTRACTORS MUST NOT CAUSE THE DISCHARGE, RELEASE OR DISPOSAL OF ANY HAZARDOUS
MATERIAL CREATED BY THEIR WORK ON OR ABOUT THE JOB SITE. IN THE EVENT OF ANY SPILL, RELEASE OR ANY OTHER
REPORTABLE OCCURRENCE, NOTIFY THE APPROPRIATE GOVERNMENTAL AGENCY IN ACCORDANCE WITH THE CONTRACTING
OFFICER, AND TAKE SUCH ACTION AS MAY BE NECESSARY TO MINIMIZE THE DELETERIOUS EFFECT OF SUCH SPILL ON
PERSONS OR PROPERTY. THE CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ANY HAZARDOUS WASTE MATERIALS IN
ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS.
28. CONTRACTOR AND ITS SUBCONTRACTORS MUST, UPON COMPLETION OF PERFORMANCE OF ALL DUTIES UNDER THIS
CONTRACT, REMOVE ALL SUPPLIES, MATERIALS, AND WASTE CONTAINING AND HAZARDOUS MATERIAL FROM THE JOB SITE.
CONTRACTOR MUST BEAR FULL FINANCIAL RESPONSIBILITY, AS BETWEEN THE PARTIES OF THIS CONTRACT, FOR THE
COMPLIANCE OF CONTRACTOR AND ITS SUBCONTRACTORS.
29. IN THE EVENT CONTRACTOR OR ITS SUBCONTRACTORS ENCOUNTER ON THE PREMISES ANY PIPELINE, UNDERGROUND
STORAGE TANK OR OTHER CONTAINER, OF ANY KIND, THAT MAY CONTAIN A HAZARDOUS MATERIAL, OR ENCOUNTER
MATERIAL REASONABLY BELIEVED TO BE A HAZARDOUS MATERIAL, IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND
REPORT THE CONDITION TO CONTRACTING OFFICER IN WRITING.
30. "HAZARDOUS MATERIAL" MEANS ANY SUBSTANCE: (A) THE PRESENCE OF WHICH REQUIRES INVESTIGATION OR REMEDIATION
UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, ORDINANCE, RULE, CODE, ORDER, ACTION, POLICY
OR COMMON LAW, OR (B) WHICH IS OR BECOMES DEFINED AS A "HAZARDOUS WASTE," "HAZARDOUS SUBSTANCE,"
POLLUTANT OR CONTAMINANT UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, RULE OR
ORDINANCE OR AMENDMENTS THERETO INCLUDING, WITHOUT LIMITATION, THE COMPREHENSIVE ENVIRONMENTAL
RESPONSE COMPENSATION AND LIABILITY ACT (42 U.S.C. SECTIONS 9601 ET SEQ.) AND/OR THE RESOURCE CONSERVATION
AND RECOVERY ACT (42 U.S.C. SECTIONS 6901 ET SEQ.), OR (C) WHICH IS TOXIC, EXPLOSIVE, CORROSIVE, FLAMMABLE, INFECTIOUS, RADIOACTIVE, CARCINOGENIC, MUTAGENIC, OR OTHERWISE HAZARDOUS AND IS REGULATED BY ANY
GOVERNMENTAL AUTHORITY, AGENCY, DEPARTMENT, COMMISSION, BOARD, AGENCY OR INSTRUMENTALITY OF THE UNITED
STATES, THE STATE IN WHICH THE PREMISES ARE LOCATED OR ANY POLITICAL SUBDIVISION THEREOF, OR (D) THE
PRESENCE OF WHICH ON THE PREMISES CAUSES OR THREATENS TO CAUSE A NUISANCE UPON THE PREMISES OR TO
ADJACENT PROPERTIES OR POSES OR THREATENS TO POSE A HAZARD TO THE HEALTH OR SAFETY OF PERSONS ON OR
ABOUT THE PREMISES, OR (E) WHICH CONTAINS GASOLINE, DIESEL FUEL OR OTHER PETROLEUM HYDROCARBONS, OR (F)
WHICH CONTAINS POLYCHLORINATED BIPHENYLS, ASBESTOS, LEAD OR UREA FORMALDEHYDE FOAM INSULATION.
1. DEWATER, AS REQUIRED, SUCH THAT THE EXCAVATIONS ARE FREE OF STANDING WATER AT THE TIME OF CONCRETE
PLACEMENT.
2. COMPACT SUBGRADE SOIL TO A MINIMUM OF 95% OF THE MAXIMUM MODIFIED PROCTOR DRY DENSITY IN ACCORDANCE
WITH ASTM D-1557.
3. PLACE CLEAN GRANULAR FILL IN 6 INCH LAYERS AND COMPACT TO A MINIMUM OF 98% OF THE MAXIMUM MODIFIED
PROCTOR DRY DENSITY AS DETERMINED BY ASTM D-1557.
4. COORDINATE ALL NEW FOUNDATIONS WITH EXISTING CONDITIONS. ANY CONFLICTS SHALL BE REPORTED TO THE
CONTRACTING OFFICER FOR PROPOSED SOLUTION.
5. WHERE EARTH FORMING IS USED, EXCAVATION FOR FOUNDATIONS SHOWN ON DRAWINGS SHALL NOT BE LARGER THAN THE
INDICATED FOUNDATION SIZE BY MORE THAN THREE (3) INCHES IN EACH DIRECTION.
1. ALL EXCAVATED MATERIAL AND CONSTRUCTION AND DEMOLITION DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE
AND PROPERLY DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REQUIREMENTS.
2. THE EROSION CONTROL MEASURES TAKEN SHALL BE IN CONFORMANCE WITH CAPE CANAVERAL AIR FORCE STATION, FDEP, ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, AND ANY OTHER LOCAL, STATE, OR FEDERAL AGENCIES HAVING
JURISDICTION.
3. EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO CONSTRUCTION COMMENCEMENT.
4. THE APPROPRIATE TURBIDITY AND EROSION CONTROL METHODOLOGIES SELECTED BY THE CONTRACTOR FOR THIS
PROJECT SHOULD BE MADE FOLLOWING ASSESSMENT OF THE PLANS AND PROJECT SITE SPECIFIC FACTORS AND AFTER
CONSULTATIONS AS NEEDED WITH THE CONTRACTING OFFICER AND APPROPRIATE AGENCIES. THE CONSTRUCTION
SEQUENCING SHOULD BE THOUGHT OUT IN ADVANCE OF INITIATION TO PROVIDE ADEQUATE PROTECTION OF WATER
QUALITY.
5. THE TYPE OF EROSION CONTROL BARRIERS USED ARE GOVERNED BY THE NATURE OF THE CONSTRUCTION OPERATION
AND SOIL TYPE THAT WILL BE EXPOSED. SILTY AND CLAYEY MATERIAL MAY REQUIRE SOLID SEDIMENT BARRIERS TO
PREVENT TURBID WATER DISCHARGE WHILE SANDY MATERIAL MAY NEED ONLY SILT SCREENS OR HAY BALES TO
PREVENT EROSION. FLOATING TURBIDITY BARRIERS SHOULD GENERALLY BE USED IN OPEN WATER SITUATIONS.
DIVERSION DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID STORMWATER RUNOFF FROM BEING
DISCHARGED TO WETLANDS OR OTHER WATER BODIES. IT MAY BE NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES, AND OTHER EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS WARRANT.
6. THE CONTRACTOR MUST MAINTAIN THE EROSION CONTROL DEVICES THROUGHOUT THE DURATION OF CONSTRUCTION.
SUCH DEVICES SHALL REMAIN UNTIL SUFFICIENT GROUND COVER IS ESTABLISHED.
7. INSPECT THE SITE ROUTINELY AFTER RAINFALL EVENTS. EQUIPMENT SHOULD BE AVAILABLE AT THE SITE AT ALL TIMES TO
MAKE REPAIRS AS NECESSARY.
8. INSTALL TEMPORARY EROSION CONTROL BARRIERS IN COORDINATION WITH THE CONSTRUCTION OF THE PERMANENT
EROSION CONTROL FEATURES TO THE EXTENT NECESSARY TO ASSURE ECONOMICAL, EFFECTIVE, AND CONTINUOUS
CONTROL OF EROSION AND WATER POLLUTION THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE.
9. SCHEDULE OPERATIONS SUCH THAT THE AREA OF UNPROTECTED, ERODIBLE EARTH EXPOSED AT ANY ONE TIME IS NOT
LARGER THAN THE MINIMUM AREA NECESSARY FOR EFFICIENT CONSTRUCTION OPERATION AND THE DURATION OF
EXPOSED, UNCOMPLETED CONSTRUCTION TO THE ELEMENTS MUST BE AS SHORT AS PRACTICABLE. CLEARING AND
GRUBBING MUST BE SO SCHEDULED AND PERFORMED SUCH THAT GRADING OPERATIONS CAN FOLLOW IMMEDIATELY
THEREAFTER. GRADING OPERATIONS MUST BE SO SCHEDULED AND PERFORMED THAT PERMANENT EROSION CONTROL
FEATURES CAN FOLLOW IMMEDIATELY THEREAFTER IF CONDITIONS ON THE PROJECT PERMIT.
10. EXPOSED SOILS SHOULD BE STABILIZED AS SOON AS POSSIBLE. THE CONTRACTOR IS RESPONSIBLE FOR SELECTING AND
PROVIDING THE TEMPORARY AND PERMANENT STABILIZATION METHODS.
11. INSTALL ENERGY DISSIPATERS, INCLUDING BUT NOT LIMITED TO RIP-RAP, GRAVEL, HAY BALES, VEGETATION OR
GEOTEXTILES, AT THE DISCHARGE POINT OF PIPES OR SWALES IF SCOURING IS OBSERVED.
12. IF VEHICLE OR EQUIPMENT WASHDOWN DEBRIS/AREAS IS REQUIRED, OBTAIN APPROVAL FROM THE CONTRACTING
OFFICER.
13. STOCKPILE EXCAVATED MATERIAL IN SUCH A MANNER THAT PREVENTS DIRECT OFFSITE DISCHARGE FROM THE PROJECT
SITE OR INTO ANY ADJACENT WATER BODY, WETLAND, OR STORMWATER MANAGEMENT FACILITY.
14. CONSTRUCT ALL PROJECT FEATURES TO PREVENT EROSION AND SEDIMENTATION AND MAINTAIN THROUGHOUT THE LIFE
OF CONSTRUCTION.
15. ONGOING INSPECTIONS AND PERIODIC MAINTENANCE BY THE CONTRACTOR MUST OCCUR THROUGHOUT CONSTRUCTION
AS OFTEN AS NECESSARY TO ENSURE THAT THE ABOVE METHODS ARE WORKING SUITABLY. THIS MAY BE NEEDED AS
OFTEN AS DAILY IF CONDITIONS SO WARRANT. THE CONTRACTOR MUST MAINTAIN A WRITTEN RECORD OF ALL EROSION
CONTROL INSPECTIONS, INCIDENTS, AND MODIFICATIONS AND MUST MAKE ALL RECORDS AVAILABLE UPON REQUEST BY
THE CONTRACTING OFFICER.
CIVIL GENERAL NOTES:
FOUNDATIONS:
EROSION AND TURBIDITY CONTROL GENERAL NOTES:
REINFORCING STEEL:
1. CONCRETE REINFORCEMENT STEEL INSTITUTE (CRSI) AND AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS APPLY.
2. ALL DEFORMED BARS MUST CONFORM TO ASTM A615, GRADE 60 AND BE INSTALLED IN ACCORDANCE WITH ACI 315-99.
3. ALL REINFORCEMENT MUST BE COLD BENT. REINFORCEMENT PARTIALLY EMBEDDED IN GROUT SHALL NOT BE FIELD BENT.
4. MECHANICAL SPLICES, CONFORMING TO ACI 318-14, SECTION 25.5.7 CAN BE SUBSTITUTED FOR LAP SPLICES AT NO
ADDITIONAL COST. MECHANICAL SPLICES MUST DEVELOP 125% (MINIMUM) OF THE YIELD STRENGTH OF THE CONNECTING
REBAR.
5. AT THE TIME OF CONCRETE PLACEMENT, ALL REINFORCEMENT MUST BE FREE OF DIRT, DEBRIS, CORROSION, OIL, NONMETALLIC COATINGS OR OTHER DELETERIOUS MATERIAL THAT REDUCE BOND STRENGTH WITH CONCRETE.
6. SUBMIT FOR REVIEW SHOP DRAWINGS OF REINFORCING STEEL DETAILS PRIOR TO FABRICATING REINFORCING STEEL.
7. ALL WELDED WIRE FABRIC MUST CONFORM TO ASTM A185 AND BE LAPPED ONE FULL MESH PANEL PLUS 2 INCHES AT
SIDES AND ENDS AND WIRED TOGETHER.
8. ALL REINFORCING STEEL MUST BE SUPPORTED IN STANDARD ACCESSORIES, HELD RIGIDLY AND ACCURATELY IN PLACE, AND PROTECTED AGAINST DISPLACEMENT BEFORE AND DURING PLACEMENT OF CONCRETE. THE SUPPORT OF THE
REINFORCING STEEL AND THE WIRE MESH AT THE FOUNDATIONS AND SLAB-ON-GRADE SHALL BE PROVIDED BY PRECAST
CONCRETE BRICKS AT 2 FEET OC. E.W. (MAX SPACING). SEE THE SPECIFICATIONS FOR FURTHER REQUIREMENTS.
9. REINFORCEMENT CHAIR LEGS THAT REST ON CONCRETE SURFACES THAT WILL BE EXPOSED IN THE FINISHED
STRUCTURE MUST BE FIBERGLASS REINFORCED PLASTIC OR PLASTIC COATED STEEL.
CONCRETE:
1. THE LATEST EDITION OF THE FOLLOWING ACI STANDARDS APPLY:
ACI 318 (CODE)
ACI 304 (PLACING)
ACI 306 (WINTER CONCRETE)
ACI 315/SP66 (DETAILING)
ACI 305 (HOT WEATHER CONCRETE)
ACI 347 (FORM WORK)
ACI 211.1 (MIX PROPORTIONING)
2. ALL CONCRETE MUST BE 4,000 PSI, TYPE I OR II, NORMAL WEIGHT, PORTLAND CEMENT CONCRETE.
3. CALCIUM CHLORIDE SHALL NOT BE USED IN ANY FORM.
4. SITE ADDED WATER IS PERMITTED PROVIDED MAX WATER TO CEMENT RATIO ARE NOT EXCEEDED; HOWEVER, NOT MORE
THAN ONE GALLON OF WATER PER CUBIC YARD MAY BE USED TO ADJUST THE MIX AT THE JOB SITE.
5. ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185 AND BE LAPPED ONE FULL MESH PANEL PLUS 2 INCHES AT
SIDES AND ENDS AND WIRED TOGETHER.
6. CONSOLIDATE ALL CONCRETE, OTHER THAN SLABS ON GRADE USING MECHANICAL VIBRATING EQUIPMENT. DO NOT
OVER-CONSOLIDATE.
7. DO NOT PLACE CONCRETE DURING RAIN OR IF RAIN IS LIKELY TO OCCUR PRIOR TO CONCRETE HARDENING.
STRUCTURAL STEEL:
1. FIELD CONNECTIONS MUST BE WELDED OR BOLTED USING ASTM A325 HIGH STRENGTH BOLTS (A325 - X). USE E70XX
ELECTRODES FOR ALL WELDING.
2. ALL WELDING MUST BE PERFORMED BY AN AWS CERTIFIED WELDERS AND CONFORM TO AWS D1.1/D1.1M STRUCTURAL
WELDING CODE - STEEL, LATEST EDITION.
3. ALL BOLTS MUST BE A325 HIGH STRENGTH; ALL NUTS MUST BE A563; AND ALL WASHERS MUST BE F436.
4. THE CONTRACTOR MUST MINIMIZE THE USE OF DISSIMILAR METALS TO THE GREATEST EXTENT POSSIBLE. IF THE SITE
CONDITIONS, DRAWINGS OR SPECIFICATIONS DICTATE THE USE OF DISSIMILAR METALS, PROVIDE APPROPRIATE, EXTERIOR RATED, INSULATING BARRIERS BETWEEN THE INTERACTIVE SURFACES OF THE DISSIMILAR METALS.
ALL STRUCTURAL STEEL SHALL MEET OR EXCEED THE FOLLOWING ASTM SPECIFICATION AND YIELD STRENGTH
W AND WT SHAPES
FY=50 KSI (A992, GRADE 50)
RECTANGULAR AND SQUARE HSS
FY=46 KSI (A500, GRADE B)
ROUND HSS
FY=42 KSI (A500, GRADE B)
RECTANGULAR AND SQUARE HSS
FY=36 KSI (A36)
DESCRIPTION
ACI MINIMUM STANDARD HOOK EXTENSION LENGTHS
#3 #4 #5 #6 #7 #8 #9 #10 #11
STIRRUPS & TIES
90" BEND PLUS
2.5" 3" 3.75" N/A N/A N/A N/A N/A N/A
STIRRUPS & TIES
90" BEND PLUS
2.5" 3" 3.75" N/A N/A N/A N/A N/A N/A
OTHER BARS 90"
BEND PLUS
4.5" 6" 7.5" 9" 10.5" 12" 13.75" 15.5" 7"
OTHER BARS 90"
BEND PLUS
2.5" 2.5" 2.5" 3" 3.5" 4" 4.75" 5.25" 5.75"
CONCRETE PROTECTION FOR REINFORCEMENT:
STRUCTURAL SYSTEM
FOOTINGS (CAST AGAINST AND FOOTINGS (CAST AGAINST AND EXPOSED)
COVER
3 INCHES
2 INCHES
2 INCHES
1 1/2 INCHES
1 INCH
FOOTINGS AND WALLS (FORM CAST AND EARTH EXPOSED)
SLABS (EARTH EXPOSED)
SLABS (EXTERIOR EXPOSED)
SLABS (ABOVE GRADE)
LAP SPLICE LENGTH NORMAL WEIGHT CONCRETE, NO EPOXY
T O
P
B A
R S
O T
H E
R
BAR SIZES (#)
3 4 5 6 7 8 9 10 11
15" 20" 24" 29" 42" 48" 55" 65" 80"3"
15" 20" 24" 29" 46" 61" 77" 97" 120"2"
15" 20" 25" 36" 62" 81" 102" 130" 160"1 1/2"
18" 32" 50" 73" 106" 121" 136" 153" 170"3/4"
12" 15" 19" 23" 33" 37" 42" 50" 62"3"
12" 15" 19" 23" 36" 47" 59" 75" 92"2"
12" 15" 20" 28" 48" 62" 79" 100" 123"1 1/2"
14" 25" 39" 56" 81" 93" 105" 118" 131"3/4"
#3 #4 #5 #6 #7 #8 #9 #10 #11
DEFORMED REBAR
TYPE
STIRRUPS & TIES
OTHER BARS
2.25" 3" 3.75" 4.5" 5.25" 6" 9" 10.25" 11.25"
MIN INSIDE DIAMETER OF BEND
1.5" 2" 2.5" N/A
N/A N/A N/A N/A N/A
REQUIRED EMBEDEMENT DEPTH OF STANDARD ACI HOOKS INTO CONCRETE
NORMAL WEIGHT
CONCETE TYPE
BAR SIZES
4 5 6 7 8 9 10 113
8" 10" 12" 15" 17" 19" 22" 25" 27"
LEAST
CONCRETE
COVER AT BAR
TRUE
NORTH
1. INSTALL APPROXIMATELY 100 LINEAR FEET OF SILT FENCE.
2. INSTALL TURBIDITY BARRIER AROUND EXISTING STORMWATER CONTROL STRUCTURE.
3. SAW CUT APPROXIMATELY 10 LINEAR FEET AND DEMOLISH 12 SQUARE FEET OF EXISTING
CONCRETE SLAB.
4. SAW CUT APPROXIMATELY 25 LINEAR FEET AND DEMOLISH 250 SQUARE FEET OF EXISTING
CONCRETE SLAB.
5. SAW CUT APPROXIMATELY 7 LINEAR FEET AND DEMOLISH 10 SQUARE FEET OF EXISTING
CONCRETE SLAB.
6. SAW CUT TWO (2) PARALLEL AT APPROXIMATELY 12 LINEAR FEET EACH AND DEMOLISH
APPROXIMATELY 75 SQUARE FEET (50 SQUARE FEET (MIN)) OF EXISTING CONCRETE SLAB.
FLAG NOTES:
SCALE:
EXISTING CONDITIONS AND DEMOLITION PLAN
1" = 10'
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
J
L O
N G
S H
O R
E
J
L O
N G
S H
O R
E
C-101
E X
I S
T I N
G
C
O N
D I T
I O
M
O L
I T
I O
N
P
L A
N
CONCRETE FLUME
ETR
SHED ETR
CONCRETE PATH
ETR
MECHANICAL
EQUIPMENT PAD
ETR
LIFT STATION
ETR
STABILIZED SIDE
SLOPE ETR
CONCRETE FLUME ETR
STORMWATER CONTROL
STRUCTURE AND
OUTFALL PIPE
ETR
GENERATOR
CONCRETE PAD
ETR
CONCRETE SLAB
AND PAVILION
ETR
1. COORDINATE ALL CIVIL SITE DEMOLITION WITH THE ELECTRICAL DESIGN AND PHASING PLAN.
2. PRIOR TO CONSTRUCTION COMMENCEMENT, DEVELOP, IMPLEMENT AND MAINTAIN A
STORMWATER POLLUTION PREVENTION PLAN IN ACCORDANCE WITH FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION BEST MANAGEMENT PRACTICES, SPECIFICATION 01 57 19 AND
CIVIL DETAIL C502 AND C503.
3. REFER TO SPECIFICATION 01 57 19 FOR TEMPORARY ENVIRONMENTAL CONTROLS INCLUDING
BUT NOT LIMITED TO REMOVAL OF EXISTING OIL FILLED EQUIPMENT.
4. PROTECT AND PRESERVE ALL EXISTING CONDUIT AND UTILITY SERVICES THAT ARE NOT
IDENTIFIED TO BE DEMOLISHED.
5. REFER TO THE ELECTRICAL PHASING PLAN AND COORDINATE WITH THE ELECTRICAL
CONTRACTOR PRIOR TO PERFORMING CONCRETE DEMOLITION.
GENERAL NOTES:
0 5 10 20
1"=10'
SCALE IN FEET
GRAPHIC SCALE
1. REPAIR EXISTING CONCRETE SLAB IN ACCORDANCE WITH DETAILS ON SHEET C-501.
2. EXTEND EXISTING CONCRETE SLAB FOR NEW TRANSFORMER EQUIPMENT IN ACCORDANCE
WITH DETAILS ON SHEET C-501.
3. GROUT AND FILL EXISTING ELECTRICAL CONDUIT BELOW TOP OF SLAB ELEVATION PER
CONDUIT TERMINATION DETAIL ON SHEET C-501. MATCH EXISTING GRADES.
4. BACKFILL DEMOLISHED CONCRETE SLAB AREA WITH CLEAN GRANULAR FILL TO THREE
INCHES BELOW TOP OF EXISTING SLAB AND COVER WITH BAHIA SOD.
FLAG NOTES:
SCALE:
CIVIL SITE PLAN
1" = 10'
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
J
L O
N G
S H
O R
E
J
L O
N G
S H
O R
E
C-102
C I V
T
E
P
L A
N
CONCRETE FLUME ETR
SHED
ETR
CONCRETE PATH
ETR
MECHANICAL
EQUIPMENT PAD
ETR
LIFT STATION
ETR
STABILIZED SLOPE ETR
CONCRETE FLUME
ETR
STORMWATER CONTROL
STRUCTURE AND
OUTFALL PIPE
ETR
GENERATOR
CONCRETE PAD
ETR
CONCRETE SLAB
AND PAVILION
ETR
1. COORDINATE ALL CIVIL SITE WORK WITH THE ELECTRICAL DESIGN AND PHASING PLAN.
GENERAL NOTES:
0 5 10 20
1"=10'
SCALE IN FEET
GRAPHIC SCALE
NEW CONCRETE SLAB
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
J
L O
N G
S H
O R
E
J
L O
N G
S H
O R
E
C-501
C I V
T
A I L
S
TRENCH WIDTH
1. PROVIDE 1/4 INCH AMPLITUDE ALONG VERTICAL FACE OF EXISTING CONCRETE AND APPLY
BONDING AGENT PRIOR TO CONCRETE PLACEMENT.
2. DOWEL AND EPOXY ANCHOR #5 REBAR WITH A 6 INCH MINIMUM EMBEDMENT DEPTH. HILTI
MODEL HIT-HY 200-A OR APPROVED EQUIVALENT.
3. PROVIDE #3 STIRRUP AT 12 INCHES O.C.
4. REBAR SPACING (TRENCH): #5 REBAR AT 18 INCH O.C. (MAX.) AND 9 INCH O.C. (MIN.) EACH WAY.
5. PROVIDE 3 INCH COVER (MIN.) FROM EDGE OF NEW AND EXISTING CONCRETE.
6. SUBGRADE: COMPACT EXISTING SOIL TO 90% OF THE MATERIAL'S MODIFIED PROCTOR DENSITY
(ASTM D-1557).
7. BASE: PROVIDE AND COMPACT 8 INCH THICK LAYER OF FDOT STANDARD SPECIFICATION 204
GRANULAR BASE TO 95% OF THE MATERIAL'S MODIFIED PROCTOR DENISTY (ASTM D-1557).
8. TRENCH BASE, HAUNCHING AND COVER: PROVIDE AND COMPACT 6 INCH THICK (MAX.) LIFTS OF
FDOT STANDARD SPECIFICATION 204 GRANULAR BASE TO 95% OF THE MATERIAL'S MODIFIED
PROCTOR DENISTY (ASTM D-1557).
9. BACKFILL: COMPACT EXCAVATED SPOIL IN 8 INCH THICK (MAX.) LIFTS TO 90% OF THE
MATERIAL'S MODIFIED PROCTOR DENSITY (ASTM D-1557).
10. REFER TO ELECTRICAL DRAWINGS FOR SIZE AND TYPE OF CONDUIT.
11. APPLY 10 MIL VAPOR BARRIER BETWEEN TOP OF BASE MATERIAL AND NEW CONCRETE.
12. INSTALL DETECTABLE FOIL TAPE 8 INCHES ABOVE CENTER LINE OF CONDUIT.
CONSTRUCTION DETAIL NOTES:
NATIVE SOIL
EXISTING SUBGRADE
EXISTING BASE
EXISTING CONCRETE
TRENCH UPPER
WIDTH
8" (MIN.)
MATCH EXISTING
8" (MIN.)
18" (MIN.)
1/2"'
1/2"'
SECTION VIEW
PLAN VIEW
SECTION VIEW
PLAN VIEW
SLAB TRENCH REPAIR DETAIL TYPICAL
SCALE: N.T.S.
18" (MAX.)
3" (MIN.)
3" (MIN.)
18" (MAX.)
9" (MIN.)
3" (MIN.)
3" (MIN.)
9" (MIN.)
18" (MAX.)
18" (MAX.)
SLAB REPAIR DETAIL TYPICAL
SCALE: N.T.S.
MATCH EXISTING GRADE AND SLOPE
AWAY FROM EQUIPMENT (TYP.)
ELECTRICAL CONDUIT SLAB TERMINATION
SCALE: N.T.S.
CAP
EXISTING CONDUIT
TOP OF SLABNEW CONCRETE
EXISTING CONCRETE
3"
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
EDGE OF CONCRETE
EDGE OF CONCRETE
A
C-501
A
C-501
MATCH EDGE PROFILE
OF EXISTING CONCRETE
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C
C A
F S
N T
R A
F
A D
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
M
J O
H N
S O
N
D B
D B
R E
P A
E
C T
R I C
D
U N
D A
N
A
F S
H
Q
N E
L S
O N
E N
G I N
E E
R I N
G
M
G
O N
Z A
L E
Z
B
K
O L A
K
C-502
S T
O R
M W
A T
L
L U
T I O
N
P
R E
V E
N T
I O
N
P
L A
N
I
OWNER AND ADDRESS: UNITED STATES AIR FORCE
1224 JUPITER STREET, BUILDING 534
PATRICK A.F.B., FLORIDA 32925
LOCATION:
LATITUDE: LONGITUDE:
SECTION/TOWNSHIP/RANGE:
PROJECT NAME: REPAIR ELECTRICAL REDUNDANCY, CCAFS HQ, FL
PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF
SITE MAPS:
*CONSULT ASSOCIATED PLANS FOR EROSION AND SEDIMENT CONTROLS.
SITE AREA:
1. TOTAL AREA OF SITE
2. TOTAL AREA DISTURBANCE
3. WETLAND AREA
4. RECEIVING WATER
SITE DESCRIPTION:
CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE
AND LOCAL REGULATIONS:
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL LAWS
REGARDING EROSION AND TURBIDITY CONTROLS, THE FOLLOWING PERMITS HAVE
BEEN OBTAINED AND ARE AVAILABLE ON-SITE:
D.E.P. PERMIT: NONE
C.O.E. PERMIT: NONE
S.J.R.W.M.D.E.R.PERMIT: NONE
D.E.P.N.O.I.: NONE
SEQUENCE OF MAJOR ACTIVITIES:
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. SUBMIT NOTICE OF INTENT (N.O.I.).
2. FLAG THE WORK LIMITS & MARK TREE OR PROTECTED AREA BUFFER, IF
APPLICABLE COORDINATE PRE-CONSTRUCTION MEETING WITH DESIGNATED
SITE SUPERINTENDENT AND INSPECTOR(S) IN CHARGE OF SWPPP
REQUIREMENTS.
3. INSTALL REQUIRED PERIMETER CONTROLS.
4. PERFORM DEMOLITION OPERATIONS, IF APPLICABLE.
5. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE.
6. INSTALL PERMANENT SEEDING/SODDING AND PLANTING AND WATER AS
REQUIRED UNTIL PERMANENTLY ESTABLISHED WHEN ALL CONSTRUCTION
ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, COORDINATE.
7. INSPECTION OF ALL WORK AREAS.
8. REMOVE ANY EROSION CONTROL DEVICES AND RESEED/SOD AS REQUIRED.
9. SUBMIT NOTICE OF TERMINATION (N.O.T).
CONSTRUCTION CONTRACTOR REQUIREMENTS:
IN ADDITION TO THE RESPONSIBILITIES OUTLINED IN THE ABOVE SECTIONS, IT IS
ALSO THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
FOLLOWING IS CONDUCTED:
*N.O.I. FORM IS COMPLETED AND SUBMITTED WITH APPROPRIATE FEE AT LEAST
48 HOURS PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY.
*CONSTRUCTION CONTRACTOR AND ALL CONSTRUCTION SUB-CONTRACTORS
COMPLETE CERTIFICATION SIGNIFYING THAT THEY ARE AWARE OF TERMS AND
CONDITIONS OF THE GENERIC PERMIT.
*CHANGES TO SWPPP ARE COMPLETED, AS NEEDED, TO ENSURE COMPLIANCE
WITH FEDERAL, STATE AND LOCAL REQUIREMENTS AND THE REPORT FORM FOR
CHANGES TO SWPPP IS COMPLETED, WHEN NECESSARY.
*SITE INSPECTIONS ARE PERFORMED AND THE INSPECTION REPORT FORM
COMPLETED AS INDICATED BY PLAN BY CONSTRUCTION CONTRACTOR'S
QUALIFIED INSPECTOR.
*MAINTENANCE ON BMP's AND MAINTENANCE RECORD COMPLETED AS
INDICATED BY PLAN.
*N.O.T. FORM IS COMPLETED AND SUBMITTED AS INDICATED BY PLAN.
IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE
BEST MANAGEMENT PRACTICES (BMPs) AS SHOWN ON THE SITE PLAN AND AS
CONTAINED IN THIS SWPPP. IT IS ALSO THE CONSTRUCTION CONTRACTOR'S
RESPONSIBILITY TO ENSURE THESE BMPs ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED
WATER FROM LEAVING THE PROJECT SITE. THE CONSTRUCTION CONTRACTOR
SHALL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON THE SITE
PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED TO ENSURE THE
SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY CONTROL
REQUIREMENTS. BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED BY THE
CONSTRUCTION CONTRACTOR AS REQUIRED TO MEET THE SEDIMENT AND
TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE BY THE REGULATORY
AGENCIES.
THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION,
MITIGATION AND REPAIR COSTS ASSOCIATED WITH NON-COMPLIANCE. IT IS THE
CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL
MEASURES TO ATTAIN IMMEDIATE COMPLIANCE, SHOULD VIOLATIONS BE
IDENTIFIED.
EROSION AND SEDIMENT CONTROLS:
PERIMETER CONTROLS:
1. SILT FENCE: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING
LIMITATIONS:
A. WHERE THE MAXIMUM DRAINAGE AREA IS 1/4 ACRE PER 100 FEET OF
LENGTH.
B. USE 4"x4" TRENCH & 8" FABRIC EXTENDED INTO GROUND BEFORE BACKFILL
& COMPACTION.
C. MAXIMUM USEFUL LIFE 6 MONTHS.
SWALE / LIVE STREAM SILT / SEDIMENT CONTAINMENT:
1. SEE FDOT INDEX 102, CHART 1, SHEET 1 FOR SPACING REQUIREMENTS FOR
TYPE I AND II SYNTHETIC BALE BARRIERS & SILT FENCES.
2. TURBIDITY CURTAINS SHALL BE LOCATED PARALLEL TO FLOW OF A MOVING
BODY OF WATER AND SHALL NOT BE PLACED ACROSS THE MAIN FLOW OF A
SIGNIFICANT BODY OF MOVING WATER.
3. SOIL PRACTICES SHALL BE ALLOWED TO SETTLE A MINIMUM OF 6-12 HOURS
BEFORE REMOVAL OF TURBIDITY CURTAIN.
4. LAND DISTURBING ACTIVITY SHALL NOT CREATE VIOLATIONS OF WATER
QUALITY STANDARDS. MONITORING OF TURBIDITY LEVELS SHALL OCCUR IN
ACCORDANCE WITH PERMIT CONDITIONS.
STOCKPILING MATERIAL:
1. NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS TO
DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO AN ADJACENT
WATER BODY OR STORM WATER COLLECTION FACILITY.
VEGETATION:
1. TEMPORARY STABILIZATION SHALL BE APPLIED TO AREAS OPENED BY
CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE
RE-DISTURBED AND RECEIVE FINAL STABILIZING TREATMENT WITHIN 14
DAYS. IF, AFTER 14 DAYS FROM TIME OF STABILIZATION, THE TEMPORARY
GRASSED AREAS HAVE NOT ATTAINED A MINIMUM OF 70% GOOD GRASS
COVER, THE AREA WILL BE REWORKED AND ADDITIONAL MEASURES APPLIED
SUFFICIENT TO ESTABLISH THE DESIRED VEGETATIVE COVER.
2. PERMANENT STABILIZATION SHALL BE PERFORMED IN ALL AREA THAT HAVE
BEEN DISTURBED BY CONSTRUCTION ACTIVITY UNLESS OTHERWISE
DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE FUNCTION OF
CRITICAL SCRUB HABITAT. FINAL STABILIZATION MUST BE INITIATED NO
MORE THAN 7 DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED IN
THAT AREA. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE
PERMITTED TO CAUSE A DEGRADATION OF OFFSITE WATER QUALITY. IF SEE
IS USED, THE SEEDING MIX MUST PROVIDE BOTH LONG-TERM VEGETATION
AND RAPID GROWTH SEASONAL VEGETATION. SLOPES STEEPER THAN 4:1
SHALL BE SODDED.
3. DISTURBED SIDE SLOPES OF DRAINAGE CONVEYANCE SWALES OR SURFACE
WATERS SHALL BE IMMEDIATELY SODDED. SOD SHALL BE PEGGED OR
STAPLED TO RESIST WASHOUT.
4. CONSTRUCTION CONTRACTOR SHALL STABILIZE COMPLETED PORTIONS OF
THE PROJECT AS WORK PROGRESSES TO PROTECT AGAINST EROSION
UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER TO
PRESERVE THE FUNCTION OF CRITICAL SCRUB HABITAT. CONSTRUCTION
CONTRACTOR SHALL IMMEDIATELY REPAIR, FILL AND SOD ERODED AREA OF
THE PROJECT THAT RESULT FROM THE CONSTRUCTION LAND ALTERATIONS.
5. ALL AREAS THAT ARE SEEDED/SODDED SHALL BE INSTALLED AND WATERED
UNTIL THE GROUND COVER IS FULLY ESTABLISHED.
POLLUTANT SOURCE CONTROL:
WASTE DISPOSAL:
WASTE MATERIALS AND RUBBISH SHALL BE COLLECTED AND STORED IN
CONTAINERS OR, IF APPROPRIATE, IN PILES. SEPARATE, SELF-CLOSING,
NONFLAMMABLE, NON-REACTIVE CONTAINERS SHALL BE USED FOR GARBAGE.
OILY FLAMMABLE AND DANGEROUS WASTES, NON-SALVAGE MATERIAL AND
DEBRIS SHALL BE REMOVED FROM WORK AREAS AND DISPOSED OF DAILY. THE
CONSTRUCTION CONTRACTOR MAY USE CAPE CANAVERAL AIR FORCE STATION
(CCAFS) LANDFILL FOR DISPOSAL OF CCAFS AND PAFB C&D IN ACCORDANCE
WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMITS.
ASBESTOS WASTE SHALL BE DISPOSED OF AT THE CCAFS ASBESTOS MONO-FILL
UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
REFER TO SPECIFICATIONS FOR FURTHER WASTE AND DISPOSAL AND RECORD
KEEPING REQUIREMENTS.
HAZARDOUS / NON HAZARDOUS:
ALL HAZARDOUS WASTE SHALL BE MANAGED IN ACCORDANCE WITH STATE AND
FEDERAL REGULATIONS BY THE CONSTRUCTION CONTRACTOR AND SHALL BE
TURNED OVER TO THE AIR FORCE FOR DISPOSAL UNDER THE AIR FORCE'S EPA
IDENTIFICATION NUMBER.
AT THE PRE-CONSTRUCTION CONFERENCE, THE CONSTRUCTION CONTRACTOR
SHALL PROVIDE THE CONTRACTING OFFICER WITH A LIST OF ALL HAZARDOUS
MATERIALS TO BE INCORPORATED INTO THE PROJECT INCLUDING THE MATERIAL
SAFETY DATA SHEET IN ACCORDANCE WITH DFARS 52.223-3, HAZARDOUS WASTE
MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA AND PROJECT
SPECIFICATIONS. THE CONSTRUCTION CONTRACTOR SHALL SUBMIT COPIES OF
SIGNED INTERNAL MANIFESTS TO THE CONTRACTING OFFICER MONTHLY.
THE CONSTRUCTION CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY IF ANY CONTAMINATED SOIL, GROUND WATER OR SUSPECT DEBRIS
IS ENCOUNTERED DURING EXCAVATION, DEMOLITION OR CONSTRUCTION OF THE
PROJECT.
SANITARY WASTE:
ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS AS
NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE SHALL BE COLLECTED
AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL
REGULATIONS FOR SANITARY SEWER.
OFFSITE VEHICLE TRACKING:
A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED, WHERE
NECESSARY, TO HELP REDUCE VEHICLE TRACKING OF SEDIMENT. THE PAVED
STREET ADJACENT TO THE SITE ACCESS SHALL BE SWEPT DAILY TO REMOVE
ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE.
DUMP TRUCKS HAULING MATERIAL FROM THE CONSTRUCTION FROM THE
CONSTRUCTION SITE SHALL BE COVERED WITH A TARPAULIN.
FERTILIZERS, PESTICIDES, HERBICIDES:
THE SPECIFIED REQUIREMENT FOR FERTILIZERS, PESTICIDES, AND HERBICIDES
SHALL BE IDENTIFIED. THE QUANTITIES AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.