Haz_Waste_Form.doc

DOC document 39 KB Posted

Attached to
Repair Envelope, CCAFS, Bldg. 1645 Federal contract opportunity
Solicitation number
FA252119BA014
Issued by
Department of the Air Force Space Command

About this file

Hazardous Waste Form

View the file

Other files for this federal contract opportunity

Other files attached to Repair Envelope, CCAFS, Bldg. 1645, newest first.
File Type Posted
Abstract_of_Offers.pdf PDF
FA252119BA014_-_RFI_Response_and_Add'l_Info.pdf PDF
SV_Sign-in_Redacted.pdf PDF
Amendment_1_Approved.pdf PDF
Wage_Determination_051019.pdf PDF
Solicitation_-_FA252119BA014_Final.pdf PDF
RMD_Fm_(5.29.19).pdf PDF
DRWG_(5.29.19).pdf PDF
Specifications_(5.29.19).pdf PDF
Stmnt_of_Work_(5.29.19).pdf PDF
Form_3052_-_Constr_Cost_Est_Breakdown_w_cont.xls XLS spreadsheet
Precon_05-Badge_Request_45_SFS_Form,_V11_25Jul18.pdf PDF
Wage_Determination_as_of_030119.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION

PROJECT #:

PROJECT TITLE:

CONTRACTOR:

POINT OF CONTACT:

PHONE:

FAX:

HAZARDOUS MATERIAL:
DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL

(INCLUDE METHOD OF APPLICATION)

DESCRIPTION OF WASTE:
QUANTITY:

Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.

Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:

1) Must remove and dispose of paints, building components, or equiptment containing hazardous materials (lead, mercury, etc.)

2) Submits an MSDS for approval of use of a material known to be hazardous.

On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.

1. Project #: Provide installation project number.

2. Project Title: Provide installation project title.

3. Contractor: Enter complete name of contractor performing process.

4. Point of Contact: Provide name of individual knowledgable on requirements of materials listed.

5. Phone/Fax: Provide phone and fax numbers for point of contact.

6. Hazardous Material: Provide common name of each hazardous material

7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).

8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.

9. Quantity: Estimate quantity of waste to be generated

10. Sign and date each form at bottom

CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________

File details come from the government source that posted it.