DRWG_(5.29.19).pdf
PDF 26 MB Posted
- Attached to
- Repair Envelope, CCAFS, Bldg. 1645 Federal contract opportunity
- Solicitation number
- FA252119BA014
About this file
Drawing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_of_Offers.pdf | ||
| FA252119BA014_-_RFI_Response_and_Add'l_Info.pdf | ||
| SV_Sign-in_Redacted.pdf | ||
| Amendment_1_Approved.pdf | ||
| Wage_Determination_051019.pdf | ||
| Solicitation_-_FA252119BA014_Final.pdf | ||
| RMD_Fm_(5.29.19).pdf | ||
| Specifications_(5.29.19).pdf | ||
| Stmnt_of_Work_(5.29.19).pdf | ||
| Form_3052_-_Constr_Cost_Est_Breakdown_w_cont.xls | XLS spreadsheet | |
| Haz_Waste_Form.doc | DOC document | |
| Precon_05-Badge_Request_45_SFS_Form,_V11_25Jul18.pdf | ||
| Wage_Determination_as_of_030119.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
K
I
D
T
R
I
P
B
A
N
R
V
E
L
C
O
PORT CANAVERAL
TO
KENNEDY SPACE CENTER
INDUSTRIAL AREA
VISITOR CONTROL
CENTER
SOUTH GATE
STATE RD 401
N
A
W
Y
SR 528 BEACHLINE
SR A1A TO COCOA BEACH
CAPE CANAVERAL AIR FORCE STATION
DBEH 18-1547
CAPE CANAVERAL, FLORIDA
SCALE:
LOCATION MAP
NONE
CCAFS
INDUSTRIAL
AREA
REPAIR ENVELOPE, FAC 1645,
CCAFS, FLORIDA
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
E
D
TRUE
NORTH
NORTH
PLAN
G-001
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
L O
C A
T I O
N
M
A P
P
R O
J E
C T
A R
A
W I N
G
I N
D E
X
P
C
H O
S A
D B
H
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
PROJECT
AREA
SCALE:
ENLARGED PROJECT AREA
NONE
TRUE
NORTH
NORTH
PLAN
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
U I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
SUPPLEMENTAL DRAWING'S NOTE:
ORIGINAL DRAWING MODIFICATIONS ARE CLOUDED
AND REFERENCE THE SUPPLEMENTAL DRAWING
PACKAGE AT THE END OF THE CURRENT PACKAGE.
DRAWING INDEX
SHEET NUMBER SHEET DESCRIPTION
GENERAL
G-001
LOCATION MAP, PROJECT AREA AND DRAWING INDEX
HAZARDOUS MATERIALS
H-001 GENERAL HAZARDOUS MATERIAL NOTES AND ABBREVIATIONS
ARCHITECTURAL
A-001
GENERAL NOTES, ABBREVIATIONS AND LEGEND
AD-100 FLAG NOTES - DEMOLITION
AD-101 ROOF PLAN - DEMOLITION
AD-901 PHOTOS 1 - DEMOLITION
AD-902 PHOTOS 2 - DEMOLITION
A-100 FLAG NOTES - NEW CONSTRUCTION
A-101 ROOF PLAN - NEW CONSTRUCTION
A-501 DETAILS - 1
A-502 DETAILS - 2
A-503 DETAILS - 3
A-504 DETAILS - 4
A-505 DETAILS - 5
A-506 DETAILS - 6
ELECTRICAL
E-001 GENERAL NOTES
E-002 LEGEND AND ABBREVIATIONS
ED-101 LIGHTNING PROTECTION PLAN AND NOTES - DEMOLITION
ED-901 PHOTOS - DEMOLITION
E-100 FLAG NOTES - NEW CONSTRUCTION
E-101 LIGHTNING PROTECTION PLAN - NEW CONSTRUCTION
E-501
PLAN, DETAILS AND DIAGRAM
SUPPLEMENTAL DRAWINGS
SPG-001 SUPPLEMENTAL DRAWINGS COVER SHEET
SPA-001
GENERAL NOTES, ABBREVIATIONS AND LEGEND
SPAD-101
ROOF PLAN, FLAG NOTES AND PHOTOS - DEMOLITION
SPA-101
ROOF PLANS, FLAG NOTES AND SCHEDULES - NEW CONSTRUCTION
SPA-301 SECTIONS AND DETAILS
SPA-601 DOOR AND HARDWARE SCHEDULE AND DETAILS
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
G d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
GENERAL HAZARDOUS MATERIAL NOTES:
1. THE CONTRACTOR SHALL COMPLY WITH, BUT NOT LIMITED TO: AFI 32-7086, HAZARDOUS MATERIALS
MANAGEMENT, FEBRUARY 2015 AND THE 45TH SW HAZMAT TRACKING PROCEDURES FOR
CONSTRUCTION AND SERVICE CONTRACTORS. NO HAZARDOUS MATERIALS ARE ALLOWED TO BE
BROUGHT ON TO ANY 45 SW INSTALLATION WITHOUT PRIOR APPROVAL. THE CONTRACTOR SHALL
CONTACT THE CONTRACTING OFFICER AND 45 CEIE PM TO REVIEW HAZARDOUS MATERIALS
AUTHORIZATION PROCEDURES PRIOR TO HAZARDOUS MATERIALS BEING BROUGHT ON TO 45 SW
FACILITIES. ALL CONSTRUCTION MATERIALS REJECTED BY THE GOVERNMENT SHALL BE REMOVED
FROM THE SITE IMMEDIATELY.
2. IF PRODUCTS ARE TO BE USED DURING THE PROJECT WHICH MAY CONTAIN HAZARDOUS CHEMICALS, THE SDS FOR THOSE PRODUCTS SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW
ALONG WITH CONTRACTOR'S SAFETY PLAN, PRIOR TO START OF WORK.
3. THERE SHALL BE NO HAZARDOUS AIR EMISSIONS FROM DEBRIS PER 29 CFR 1910. ANY
SANDBLASTING OR NEEDLE-JET OPERATIONS MUST BE APPROVED BY THE CONTRACTING OFFICER
AND SHALL HAVE FULL CONTAINMENT.
4. THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER IF THE PRESENCE OF MATERIALS
CONTAINING ACM, PCB OR HEAVY METALS, INCLUDING LEAD, CADMIUM, OR CHROMIUM, IS
SUSPECTED OR DISTURBED, AND HAS NOT BEEN IDENTIFIED BY THIS CONTRACT, BUT IS REQUIRED
TO BE DISTURBED IN ORDER TO:
· PERFORM THE CONTRACT WORK;
· SAFELY ACCESS THE AREA OF WORK WITHOUT EXPOSURE TO HAZMAT ABOVE THE PEL;
· HAVE WORKERS PERFORM THE CONTRACT WORK WITHOUT EXPOSURE TO HAZMAT ABOVE PEL.
UNDER NO CIRCUMSTANCES SHALL ANY MATERIALS CONTAINING HEAVY METALS OR ASBESTOS
BE REMOVED WITHOUT THE CONTRACTING OFFICER APPROVAL. FOR REFERENCE, SEE HAZMAT
LEGEND.
5. ASBESTOS AND HEAVY METALS INFORMATION IS BASED FIELD SAMPLING AND TESTING REPORT
INCLUDED IN ATTACHMENT I TO THE SPECIFICATIONS. CONTRACTOR SHALL FIELD VERIFY TEST
RESULTS AS ACCURATE AND COMPLETE PRIOR TO INITIATING WORK AND PERFORM ANY ADDITIONAL
TESTING REQUIRED TO SAFELY PERFORM WORK AND PROPERLY DISPOSE OF DEMOLITION
MATERIALS. SEE FIGURE 1 FOR HAZMAT SAMPLE LOCATIONS. SEE TABLE 1 FOR ASBESTOS RESULTS
SCHEDULE. SEE TABLE 2 FOR HEAVY METALS RESULTS SCHEDULE.
6. IF ROOF REPAIR WORK AT FACILITY 1645 REQUIRES DISTURBANCE OF CMU OR OTHER CONCRETE
FIXTURES THAT GENERATES SILICA DUST, WORKERS SHALL UTILIZE RESPIRATORY PROTECTION PER
29 CFR 1910.134 AND 29 CFR 1926.1153 AGAINST SILICA AND PARTICULATES.
HAZARDOUS MATERIAL - FLAG NOTES:
1. MERCURY, ARSENIC, BARIUM, CADMIUM, CHROMIUM AND LEAD HAVE BEEN DETECTED IN PAINT ON
THE EXTERIOR STAIRCASE LEADING UP TO THE HIGH BAY ROOF. DURING ROOF REPAIR AND
REFURBISHMENT, WORK SHALL BE CONDUCTED IN SUCH A MANNER AS TO AVOID GENERATING PAINT
DUST. WORKERS SUBJECT TO EXPOSURE TO HEAVY METALS IN PAINT SHALL COMPLY WITH: 29 CFR
1926.55 OSHA STANDARD FOR GASES, VAPORS, FUMES, DUSTS, AND MISTS: 29 CFR 1910.1018, OSHA
STANDARD FOR ARSENIC; 29 CFR 1926.1127, OSHA STANDARD FOR CADMIUM; 29 CFR 1926.1126, OSHA
STANDARD FOR CHROMIUM; AND 29 CFR 1926.62, OSHA STANDARD FOR LEAD.
2. CHROMIUM WAS DETECTED IN PAINT ON THE EXTERIOR STAIRCASE AT A CONCENTRATION
EXCEEDING THE EPA TOXICITY CHARACTERISTIC LEACHING PROCEDURE (TCLP) HAZARDOUS
CRITERIA. PAINT REMOVED FROM STAIRCASE DURING REFURBISHMENT MUST BE MANAGED AS
HAZARDOUS WASTE IN ACCORDANCE WITH FEDERAL AND STATE REGULATIONS, INCLUDING 40 CFR
CHAPTER I, SUBCHAPTER I, AND U.S. AIR FORCE HAZARDOUS WASTE MANAGEMENT PLAN, 45TH
SPACE WING. SEE SPECIFICATION SECTIONS 02 81 00 AND 02 82 33.13 20.
ABBREVIATIONS:
45 SW - 45TH SPACE WING
ACM - ASBESTOS CONTAINING MATERIAL
CFR - CODE OF FEDERAL REGULATIONS
EPA - ENVIRONMENTAL PROTECTION AGENCY
F.A.C. - FLORIDA ADMINISTRATIVE CODE
HAZMAT - HAZARDOUS MATERIALS
OSHA - OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PEL - PERMISSIBLE EXPOSURE LIMITS
PCB - POLYCHLORINATED BIPHENYLS
PPE - PERSONAL PROTECTIVE EQUIPMENT
H-001
J
M
C G
A N
N
J
M
C G
A N
N
G E
N E
R A
L
H
A Z
A R
D O
M
T
E R
I A
L
N O
T E
S
A
B
R E
V I A
T I O
N S
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
APPLICABLE CODES
WORK SHALL BE IN COMPLIANCE WITH THE LATEST REVISION OF THE FOLLOWING CODES AND WITH PROJECT
SPECIFICATIONS:
OSHA STANDARD FOR RESPIRATORY PROTECTION, 29 CFR 1910.134
OSHA STANDARD FOR HAZARDOUS WASTE COMMUNICATION, 29 CFR 1910.1200
OSHA STANDARD FOR GASES, VAPORS, FUMES, DUSTS AND MISTS, 29 CFR 1926.55
OSHA STANDARD FOR LEAD, 29 CFR 1926.62
OSHA STANDARD FOR ASBESTOS, 29 CFR 1926.1101
OSHA STANDARD FOR CHROMIUM (VI), HEXAVALENT CHROMIUM, 29 CFR 1926.1126
OSHA STANDARD FOR CADMIUM, 29 CFR 1926.1127
OSHA STANDARD FOR RESPIRABLE CRYSTALLINE SILICA, 29 CFR 1926.1153
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL MECHANICAL CODE
ASBESTOS ABATEMENT, FLORIDA STATUTES CHAPTER 469
ASBESTOS PROGRAM, F.A.C. CHAPTER 62-257
2016 GENERAL BUILDING REQUIREMENTS UFC 1-200-01
HAZARDOUS WASTE MANAGEMENT PLAN, 45TH SPACE WING
NATIONAL EMISSION STANDARD FOR ASBESTOS, 40 CFR 61 SUBPART M
EPA STANDARD FOR PCB, 40 CFR 761
SYNTHETIC ORGANIC CONTAMINANTS MONITORING REQUIREMENTS, F.A.C. 62-550.516
NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE
NFPA 70, NATIONAL ELECTRICAL CODE
NFPA 111, STANDARD ON STORED ELECTRICAL ENERGY EMERGENCY AND STANDBY POWER SYSTEMS
FIGURE 1 : FACILITY 1645
FACILITY 1645
TABLE 2
BUILDING 1645, SPACECRAFT SUPPORT CENTER, CAPE CANAVERAL AFS HEAVY METALS RESULTS (PARTS PER MILLION)
Sample ID Material Type
Arsenic Barium Cadmium Chromium Lead
Mercury Sample Date Report Date
P-01 (TOTAL RCRA 8)
Upper High
Bay Exterior
Staircase Paint
ND 295 ND 4760 874 10.2 6/18/2018 6/25/2018
P-01A (TCLP RCRA 8)
Upper High
Bay Exterior
Staircase Paint
0.0900 0.107 0.0800 83.6 ND 0.000894 8/17/2018 8/24/2018
1 2
TABLE 1
BUILDING 1645, SPACECRAFT SUPPORT CENTER, CAPE CANAVERAL AFS ASBESTOS RESULTS (PARTS PER MILLION)
Sample ID Material Type
Asbestos
Sample Date
Test Date
ACM-01
Silver Flashing, South East Roof
No 6/18/2018 6/24/2018
ACM-02
Built-up Roof and Foam, South East Roof
No 6/18/2018 6/24/2018
ACM-03
Built-up Roof and Foam, South East Roof
No 6/18/2018 6/24/2018
ACM-04
Built-up Roof and Foam, South Roof
No 6/18/2018 6/24/2018
ACM-05
Built-up Roof and Foam, High Bay Roof
No 6/18/2018 6/24/2018
ACM-06
Built-up Roof and Foam, Middle Roof
No 6/18/2018 6/24/2018
ACM-07
Built-up Roof and Foam, Upper Roof
No 6/18/2018 6/24/2018
ACM-08
Black Flashing, Upper Roof
No 6/18/2018 6/24/2018
ACM-09
Built-up Roof and Foam, South West Roof
No 6/18/2018 6/24/2018
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
H d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
A-001
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
G E
N E
R A
L
N
O T
E S
A B
B R
E V
I A
T I O
G
E N
D
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
EXISTING - TO REMAIN
ARCHITECTURAL LEGEND:
(ALL MAY NOT BE USED)
DEMOLITION - TO BE REMOVED
NEW - TO BE INSTALLED
GENERAL REMOVAL AND INSTALLATION NOTES:
1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH PROJECT DRAWINGS AND SPECIFICATIONS; FOR PURPOSES OF CLARIFICATION THE WORD 'PROVIDE' MEANS PROVIDE
AND INSTALL U.O.N.
2. INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE OBSERVABLE IN PLACE ELEMENTS. CONTRACTOR TO FIELD MEASURE AND VERIFY REQUIREMENTS FOR
EXACT DIMENSIONS. PRIOR TO START OF ALL WORK OPERATIONS, CONTRACTOR SHALL FIELD VERIFY CURRENT PROJECT CONDITIONS. ALL CONSTRUCTION REQUIREMENTS
SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS FOR PROPOSED WORK, AT BID PHASE, PRIOR TO CONSTRUCTION. PROJECT SPECIFICATIONS CONTAIN ADDITIONAL
DEMOLITION AND REPAIR PROCEDURES AND REQUIREMENTS.
4. NOTATIONS FOR REMOVAL AND INSTALLATION REQUIREMENTS SHALL APPLY TO ALL SHEETS IN THIS DRAWING PACKAGE.
5. CONTRACTOR SHALL TAKE CARE TO AVOID DAMAGE TO EXISTING ITEMS INTENDED TO BE REMOVED AND RE-USED, OR RECYCLED.
6. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE ON THE
PROJECT, EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
7. REFERENCES TO MANUFACTURER'S NAMES ARE TO IDENTIFY DESIGN STANDARDS AND NOT TO LIMIT SELECTION OF OTHER SIMILAR OR EQUAL ITEMS.
8. NO EXISTING (LOAD BEARING) STRUCTURAL MEMBER SHALL BE CUT, REMOVED, AND/OR MODIFIED (UNLESS SPECIFIED IN THE CONSTRUCTION DOCUMENTS) WITHOUT THE
WRITTEN APPROVAL OF THE CONTRACTING OFFICER; ANY EXISTING DISTURBED AND/OR DAMAGED SURFACES (I.E. GYPSUM DECK, CONCRETE, PAINT, ETC.) WITHIN THE AREA
OF CONSTRUCTION SHALL BE REPAIRED AS NECESSARY, TO MATCH EXISTING CONSTRUCTION.
9. WHERE REQUIRED, ALL NEW STEEL STRUCTURAL MEMBERS SHALL BE ASTM A36.
10. WHERE REQUIRED AND NOT OTHERWISE SPECIFIED, ALL WELDING SHALL BE DONE BY AWS CERTIFIED WELDERS.
11. ALL CONSTRUCTION REQUIREMENTS INCLUDING ENVIRONMENTAL ASBESTOS AND HEAVY METAL DEMOLITION SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.
12. DISPOSAL OF ALL CONSTRUCTION DEBRIS SHALL BE AS DESCRIBED IN THE SPECIFICATIONS. ANY UNFORESEEN CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER.
13. AFTER COMPLETION OF CONSTRUCTION WORK, ALL WORK AREAS SHALL BE LEFT CLEAN AND FREE OF ANY EXTRANEOUS JOINT COMPOUND, PAINT SMEARS OR SPLATTERS.
14. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION IN FINISHED/OCCUPIED SPACES BELOW THE AREA OF WORK, TO PREVENT ACCIDENTAL INJURY TO BUILDING
OCCUPANTS. CONTRACTOR SHALL PROVIDE METHOD/CONSTRUCTION OF DUST CONTROL/BARRIER TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO START OF DEMO
WORK.
15. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE GOVERNMENT, ANY DAMAGE DONE BY HIMSELF OR HIS EMPLOYEES. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR
ALL CUTTING AND PATCHING REQUIRED TO PROPERLY INSTALL ITS WORK.
ABA/ADA - AMERICAN BARRIER ACT - FEDERAL/
AMERICAN DISABILITY ACT - COMMERCIAL
ACM - ASBESTOS CONTAINING MATERIAL
ACT - ACOUSTIC CEILING TILE
AFF - ABOVE FINISHED FLOOR
ALUM - ALUMINUM
ANOD - ANODIZED
A.T. - ANTI TERRORIST
ATFP - ANTI TERRORIST FORCE PROTECTION
BLDG - BUILDING
B.F. - BOARD FEET
CCAFS - CAPE CANAVERAL AIR FORCE STATION
CID - COMPREHENSIVE INTERIOR DESIGN
CONC - CONCRETE
CONT - CONTINUOUS
CMDR - COMMANDER'S
CMU - CONCRETE MASONRY UNIT
CONF - CONFERENCE
DN - DOWN
DET - DETAIL
DWGS - DRAWINGS
EXIST - EXISTING
EXT - EXTERIOR
F.G. - FIBERGLASS
FIN FL - FINISH FLOOR
F.V. - FIELD VERIFY
GA - GAUGE
GALV - GALVANIZED
GYP BD - GYPSUM WALL BOARD
GWB - GYPSUM WALL BOARD
H.M. - HOLLOW METAL
HW - HARDWARE
HDW - HARDWARE
HAZMAT - HAZARDOUS MATERIAL
INSUL - INSULATION
INT - INTERIOR
LLV - LONG LEG VERTICAL
LLH - LONG LEG HORIZONTAL
LFT OR
L.FT. - LINEAL FEET
MAX - MAXIMUM
MFR - MANUFACTURER
MIN - MINIMUM
M.O. - MASONRY OPENING
MOD BIT - MODIFIED BITUMEN
MTL - METAL
MRGWB - MOISTURE RESISTANT
GYPSUM WALL BOARD
MTD - MOUNTED
N.I.C. - NOT INCLUDED IN CONTRACT
NOM - NOMINAL
O.FT. - ON CENTER
O.FU. - OUTSIDE DIAMETER
PAW - PAGING AREA WARNING
P/PT - PAINT
P.T. - PRESSURE TREATED
PLYWD - PLYWOOD
PWD - PLYWOOD
PL - PLASTIC LAMINATE
PLST - PLASTER
PSI - POUNDS PER SQUARE INCH
PTS - POINTS
PVC - POLYVINYL CHLORIDE
REINF - REINFORCED
R.O. - ROUGH OPENING
SBS - STYRENE BUTADIENE STYRENE
S.C. - SOLID CORE
SCH OR
SCHED - SCHEDULE
SF OR
SQ.FT. - SQUARE FEET
SMS - SHEET METAL SCREW
S.S. - SOLID SURFACE
ST. STL. - STAINLESS STEEL
S.O.W. - SCOPE OF WORK
TYP. - TYPICAL
U.O.N - UNLESS OTHERWISE NOTED
VTR - VENT THRU-ROOF
(ALL MAY NOT BE USED) FOR ADDITIONAL END ITEMS ABBREVIATIONS; REFER TO RESPECTIVE DISCIPLINE DRAWINGS
ABBREVIATIONS:
AREA OF WORK - GENERAL ROOF AREAS A - H, FACILITY
1645, CCAFS (APPLICABLE TO ALL DISCIPLINES)
EQUIPMENT/CURB DEMOLITION (PHOTOS)
DISSIMILAR METALS:
CONTRACTOR SHALL PROVIDE ADEQUATE SEPARATION OF DISSIMILAR METALS BY APPROPRIATE MEANS, SUCH AS 15# SEPARATION FELT FOR ROOFS AND ASPHALTIC TAPE, NEOPRENE TAPE, PEEL AND STICK TAPE, OR ASPHALTIC PAINT AT OTHER LOCATIONS AS REQUIRED.
ALL CONNECTORS, FASTENERS, BOLTS, ETC., SHALL BE SELECTED IN ORDER TO PREVENT OR MINIMIZE ANY GALVANIC REACTION BETWEEN DISSIMILAR METALS. AND UNLESS
OTHERWISE NOTED PROVIDE 304 STAINLESS STEEL.
SEQUENCING OF WORK:
CONTRACTOR SHALL SEQUENCE DEMO WORK TO FULLY COMPLETE ALL REQUIRED CONSTRUCTION WORK. PHASED CONSTRUCTION IS ACCEPTABLE WHERE APPROVED BY
THE CONTRACTING OFFICER. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION OF EXISTING ASSEMBLIES TO BE SALVAGED AGAINST INCLEMENT WEATHER AND
CONSTRUCTION DAMAGE.
PROJECT SPECIFIC NOTES
1. MISSION DEDICATED ROOF MOUNTED EQUIPMENT, INCLUDING BUT NOT LIMITED TO PAW SYSTEM, CCTV AND ASSOCIATED CONDUITS AND
WIRING, SHALL BE MAINTAINED AND SHALL BE PROTECTED IN-PLACE. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING
OFFICER AND SHALL BE IDENTIFIED IN THE CONTRACTOR'S SAFETY PLAN AND METHOD OF PERFORMING THE WORK PER DRAWINGS
AND SPECIFICATIONS.
2. USER ESCORT SERVICE WILL BE PROVIDED TO GENERAL CONTRACTOR PERSONNEL WHEN REQUIRED TO ENTER THE INTERIOR OF
BUILDING DURING CONSTRUCTION.
3. EXISTING ROOF-TOP HVAC PACKAGE UNIT SHALL BE REMOVED BY A SPECIALTY CONTRACTOR AND SHALL REPLACED WITH IN-KIND MODEL
AND TONNAGE UNIT FOR REINSTALLATION. CONTRACTOR SHALL LIMIT DOWN-TIME REPLACEMENT OF HVAC PACKAGE UNIT TO NOT MORE
THAN 5 DAYS IN COORDINATION WITH THE CONTRACTING OFFICER.
4. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER IN THE EVENT CRANES AND/OR EQUIPMENT LIFTS MUST BE USED.
PLACEMENT OF CRANE TO BE APPROVED BY THE CONTRACTING OFFICER.
5. ALL NEW WOOD NAILERS AND FASCIA IN CONTACT WITH CONCRETE SURFACES SHALL BE PRESSURE TREATED (P.T.).
6. DOWNSPOUT LOCATION AND VERTICAL INSTALLATION SHALL BE FIELD DETERMINED DUE TO IN-PLACE WALL MOUNTED END ITEMS.
NOTES:
1. ALL PRESSURES ABOVE ARE 'NORMAL' / 'ASD'. NO FURTHER REDUCTIONS ARE ALLOWED. SEE NOTE 2 BELOW FOR WIND DESIGN CRITERIA.
2. WIND: ASCE 7-16 W/ THE FOLLOWING PARAMETERS:
· RISK CATEGORY III => V = 160 mph
· EXPOSURE 'D', ENCLOSED BUILDING => GCpi = ± 0.18
WIND LOAD PRESSURE TABLE
TRIBUTARY AREA
LESS THAN 20 SF
WIND ZONES
ZONE 1 = ROOF FIELD ZONE 2 = ROOF PERIMETER AND RIDGE ZONE 3 = ROOF CORNERS ZONE 4 = BLDG WALL FIELD ZONE 5 = BLDG WALL CORNERS
POSITIVE (PSF)
29.2 29.0 29.2 73.1 73.1
NEGATIVE (PSF)
-113.7 -150.4 -198.4 -79.6 -95.45
APPLICABLE CODES
WORK SHALL BE IN COMPLIANCE WITH THE FOLLOWING CODES AND THEIR LATEST REVISION AND WITH PROJECT SPECIFICATIONS:
2015 BUILDING CONSTRUCTION AND SAFETY NFPA 5000
NATIONAL ELECTRIC CODE/INTERNATIONAL ELECTRICAL CODE SERIES, NEC - NFPA 70
2015 STANDARD ON TYPES OF BLDG. CONSTRUCTION NFPA 220
2018 INTERNATIONAL BUILDING CODE
2016 GENERAL BUILDING REQUIREMENTS UFC 1-200-01
2014 AIR FORCE SIGN STANDARD UFC 3-120-01
SEQUENCE OF USER AND GC ROOF DEMOLITION AND INSTALLATION NOTES
1. GENERAL CONTRACTOR SHALL REMOVE MECHANICAL/ELECTRICAL END ITEMS AND LIGHTNING PROTECTION SYSTEM, INCLUDING, BUT NOT
LIMITED TO ROOF-TOP AC UNIT, LIGHTING FIXTURES, GROUNDING CONDUCTORS AND AIR TERMINALS WITH ATTACHMENTS. PRIOR TO
REMOVAL, END ITEMS SHALL BE TESTED FOR OPERATIONAL STATUS. REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR
SPECIFIC EQUIPMENT REMOVAL AND DISPOSAL OR EQUIPMENT REMOVAL AND SALVAGING.
2. GENERAL CONTRACTOR SHALL REPAIR ROOF PER DRAWINGS AND SPECIFICATIONS.
3. GENERAL CONTRACTOR SHALL INSTALL EXISTING/NEW MECHANICAL END ITEMS AND NEW LIGHTNING PROTECTION SYSTEM FOR A FULLY
OPERATIONAL SYSTEM. REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR SPECIFIC EQUIPMENT INSTALLATION.
EXISTING EQUIPMENT TO REMAIN (SHOWN ON PHOTOS)
AREA OF WORK - CANOPY ROOF I, J AND K, FACILITY
1645, CCAFS (APPLICABLE TO ALL DISCIPLINES)
ROOF MOUNTED MECHANICAL ITEMS
ROOF MOUNTED MECHANICAL ITEMS
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
A d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
AD-100
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
F L
G
T
E M
O L
I T
I O
N
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
GENERAL NOTES - DEMOLITION:
1. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS OF ROOF AT BID PHASE PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING BUILDING AND IN-PLACE ADJOINING ROOF STRUCTURES
AND SHALL PROVIDE TEMPORARY ROOF ENCLOSURE TO AVOID WATER INTRUSION IN THE BUILDING DURING ALL PHASES OF
CONSTRUCTION. COORDINATE DEMOLITION WITH SUBSEQUENT DISCIPLINE DRAWINGS.
3. CONTRACTOR SHALL FIELD VERIFY THE PRESENCE AND LOCATIONS OF ANY EXISTING MECHANICAL AND ELECTRICAL ROOF
MOUNTED ITEMS AT BID PHASE PRIOR TO CONSTRUCTION.
4. THE CONTRACTOR SHALL REMOVE ONLY AS MUCH ROOFING SYSTEM AS CAN BE REPAIRED, REPLACED AND WATERPROOFED IN
ONE DAY. THE PUBLIC SHALL BE PROTECTED FROM DEMOLITION MATERIAL, DUST, FUMES, ETC. BY BARRIERS FROM AND OR
PLASTIC SHEETS AS REQUIRED. DEMOLITION WORK SHALL CEASE IF THE PUBLIC IS ENDANGERED IN ANY WAY.
FLAG NOTES - DEMOLITION:
GENERAL BLDG ROOF 1645 - WALLS AND ROOF FOR ROOF AREAS A - H:
1. ROOF A - H; EXISTING BLDG CONSTRUCTION EXCEPT AT BASE OF WALLS AND AT DOOR THRESHOLD, INCLUDING BUT NOT LIMITED
TO COLUMNS, WALLS, DOORS, WINDOWS AND MISSION DEDICATED CCTV STAND AND PAW SYSTEM TO REMAIN (N.I.C) - SHOWN
FOR REFERENCE.
2. ROOF C; EXISTING STEEL VIEWING PLATFORM ASSEMBLY TO REMAIN. CAREFULLY DETACH AND REMOVE VIEWING PLATFORM
OPEN GRATING FLOOR PLATES BY MEANS OF FASTENERS REMOVAL AND GRINDING EXISTING SPOT WELDS, TO ALLOW FOR
DEMOLITION AND NEW CONSTRUCTION ROOFING WORK. SAVE GRATING PLATES FOR REINSTALLATION.
3. ROOF C; EXISTING ROOF VIEWING PLATFORM ACCESS STEEL STAIRWELL ASSEMBLY TO REMAIN (N.I.C) - SHOWN FOR REFERENCE.
CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE LADDER DURING DEMOLITION WORK.
4. ROOF D; EXISTING STEEL STAIR ASSEMBLY TO REMAIN. CAREFULLY CUT, REMOVE AND DISPOSE OF STAIR TOP OF LANDING
CORRODED TOP SECTION OF GUARDRAILS; MAINTAIN MID-RAILING IN-PLACE; PRIOR TO DEMOLITION WORK, CONTRACTOR SHALL
LOCALLY ABATE GUARDRAIL METAL SURFACE AS SPECIFIED ON HAZARDOUS MATERIALS DRAWINGS. CONTRACTOR SHALL
EXERCISE CARE DURING DEMOLITION PROCEDURE TO AVOID DAMAGE TO IN-PLACE RAILING. PREPARE FOR NEW WORK.
5. ROOF A; DETACH AND REMOVE EXISTING ROOF MOUNTED, 15 TON HVAC PACKAGE UNIT. DE-ENERGIZE EQUIPMENT PRIOR TO
REMOVAL. REMOVE SUPPORTS, SUPPORT COLLARS AND PITCH PANS. PROVIDE ADDITIONAL SUPPORTS FOR CONDUITS AND
WIRES AS REQUIRED. REFER TO NOTE 6 FOR DUCTWORK MODIFICATION NOTES AND TO PROJECT SPECIFIC NOTE 3 ON DRAWING
A-001 FOR DOWN-TIME REQUIREMENTS.
NOTE: CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, FOR GOVERNMENT APPROVAL, INDICATING REMOVAL AND INSTALLATION
OF IN-KIND HVAC PACKAGE UNIT AND SUPPORT STANDS.
6. ROOF A; EXISTING ROOF MOUNTED HVAC RETURN AND SUPPLY DUCTWORK TO REMAIN IN-PLACE. CONTRACTOR SHALL PROTECT
VERTICAL DUCTWORK SUPPORTS DURING ALL PHASES OF CONSTRUCTION.
NOTE: CONTRACTOR SHALL MODIFY IN-PLACE DUCTWORK TERMINATIONS TO ACCOMMODATE NEW ROOF MOUNTED HVAC
PACKAGE UNIT. PROVIDE SHOP DRAWINGS, FOR GOVERNMENT'S APPROVAL OF MODIFICATIONS TO DUCTWORK; REFER TO NOTE
5 FOR HVAC PACKAGE UNIT MODIFICATIONS.
7. ROOF A; REMOVE AND DISPOSE OF EXISTING CONDENSATE LINE.
8. ROOF B; EXISTING ALUMINUM RAILING TO REMAIN - CONTRACTOR SHALL CAREFULLY REMOVE AND DISPOSE RAILING PITCH PAN
ASSEMBLIES AND PREPARE FOR NEW WORK.
9. ROOF A AND B; EXISTING CONCRETE STAIR AND ELEVATED LANDING WITH ALUMINUM RAILING TO REMAIN - CONTRACTOR SHALL
PROTECT DURING ALL PHASES OF CONSTRUCTION.
10. ROOF A - H; CONTRACTOR SHALL CAREFULLY REMOVE AND DISPOSE OF BUILT-UP ROOFING SYSTEM, INCLUDING BUT NOT
LIMITED TO BALLAST, ROOFING MEMBRANES AND INSULATION DOWN TO IN-PLACE:
- CONCRETE DECK AT ROOF A - C AND E - H, AND
- GYPSUM DECK AT ROOF D.
CONTRACTOR SHALL REMOVE NAILERS AS REQUIRED PER NOTE 12. PREPARE AREA TO RECEIVE NEW ROOFING SYSTEM.
CONTRACTOR SHALL EXERCISE CARE DURING DEMOLITION PROCEDURE TO AVOID DAMAGE TO EXISTING ROOF DECK
SUBSTRATES. CONTRACTOR SHALL INSPECT ROOF DECK PRIOR TO INSTALLATION OF NEW ROOFING.
11. ROOF A - H; EXISTING DECK SUBSTRATE TO REMAIN, TYP.
12. ROOF A - H; CONTRACTOR SHALL CAREFULLY REMOVE EXISTING EAVE OR RAKE FLASHING, INCLUDING CLEATS, BRACKETS AND
STRAPS. INSPECT ROOFING EAVE AND RAKE NAILERS AND WALL ATTACHMENTS FOR WATER INTRUSION AND DAMAGE. IF
DAMAGED, CUT, REMOVE AND DISPOSE OF AFFECTED ROOF NAILERS AND PREPARE TO RECEIVE NEW WORK. FOR BIDDING
PURPOSES, ASSUME 1500 B.FT.
13. ROOF A - C AND E - H; AT INTERSECTION OF WALLS WITH ROOFS - CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING
FLASHING ASSEMBLY TO INCLUDE, WOOD CANT STRIP, ST. STL. FLASHING, REGLET AND TERMINATION BAR WITH ATTACHMENTS, AS APPLICABLE. REPAIR SPALLING CMU AND CONCRETE PRIOR TO NEW FLASHING INSTALLATION. PREPARE AREA FOR NEW
WORK.
CONT.:
14. ROOF A - D; REMOVE AND DISPOSE OF VTR FLASHING. INSPECT CONDITION OF VTR AFTER REMOVAL OF BUILT-UP ROOFING
SYSTEM. PREPARE TO EXTEND VTR TO 8" ABOVE FINISHED ROOFING, AS REQUIRED.
15. ROOF D AND G; EXISTING AIR INTAKE HOOD (ROOF D) AND EXHAUST FAN (ROOF G) - REMOVE AND SAVE FOR REINSTALLATION
HOOD AND EXHAUST FAN ASSEMBLIES. REMOVE AND DISPOSE OF CURB FLASHING AND SEALANT. CURB NAILERS AND CANT
STRIP TO REMAIN (CONTRACTOR SHALL REMOVE NAILERS AS REQUIRED PER NOTE 12). DISCONNECT AND REMOVE EXHAUST
FAN WIRING TO NEAREST J-BOX (FOR BIDDING PURPOSES, ASSUME 20 L.FT.) INSPECT ROOF FOR WATER INTRUSION AND
DAMAGE.
16. ROOF C; AT EXISTING MISSION DEDICATED EQUIPMENT AND ELEVATOR SHAFT ROOF CURBS - REMOVE AND DISPOSE OF CURB
FLASHING, CANT STRIP AND SEALANT. INSPECT ROOF FOR WATER INTRUSION AND DAMAGE.
17. ROOF A - H; CONTRACTOR SHALL REMOVE AND DISPOSE OF STAINLESS STEEL GUTTER AND DOWNSPOUT ASSEMBLIES WITH
ATTACHMENTS.
18. ROOF A, B AND GROUND LEVEL; REMOVE AND DISPOSE OF CONCRETE SPLASH BLOCKS.
19. ROOF B; REMOVE AND DISPOSE OF ROOF WALK PADS (2 LOCS).
20. ROOF A - E; FOR ROOF MOUNTED ELECTRICAL LIGHTNING PROTECTION SYSTEM DEMOLITION WORK, REFER TO ELECTRICAL
DRAWINGS.
21. ROOF A AND B; AT EXISTING DOOR THRESHOLD - CAREFULLY REMOVE THRESHOLD FLASHING (3 LOCS).
FLAG NOTES 22 - 30 NOT USED.
CANOPY ROOFS 1645 - WALLS AND ROOF FOR ROOF AREAS I - K:
31. ROOF I AND J; EXISTING BLDG CONSTRUCTION EXCEPT AT BASE OF WALLS. INCLUDING BUT NOT LIMITED TO EXTERIOR BUILDING
WALLS AND SUPPORTS, TO REMAIN - SHOWN FOR REFERENCE.
32. ROOF I; CONTRACTOR SHALL CAREFULLY REMOVE AND DISPOSE OF METAL BATTEN ROOF AND ATTACHMENTS DOWN TO
EXISTING STEEL JOISTS; INSPECT CONDITION OF EXISTING STEEL JOISTS PRIOR TO APPLICATION OF NEW METAL ROOF; WIRE
BRUSH AND PAINT WITH ZINC RICH PAINT. CONTRACTOR SHALL EXERCISE CARE DURING DEMOLITION PROCEDURE TO AVOID
DAMAGE TO ADJOINING ROOF STRUCTURE. ANY DAMAGE CAUSED BY REMOVAL OF ROOF SYSTEM SHALL BE REPORTED TO
CONTRACTING OFFICER AND SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR SHALL REMOVE
AND DISPOSE OF STAINLESS STEEL GUTTER AND DOWNSPOUT ASSEMBLIES; RETAIN A SECTION OF GUTTER/DOWNSPOUT
ASSEMBLY AS A TEMPLATE FOR NEW CONSTRUCTION.
33. ROOF I; AT INTERSECTION OF VERTICAL BATTEN ROOF WITH ROOF - CONTRACTOR SHALL CAREFULLY REMOVE AND DISPOSE OF
EXISTING BASE FLASHING TO INCLUDE, ST. STL. FLASHING, REGLET AND TERMINATION BAR, AS APPLICABLE. REMOVE WOOD
NAILERS AND BLOCKING, INCLUDING ATTACHMENTS.
34. ROOF I; EXISTING METAL CEILING PANELS AT UNDERSIDE OF STEEL STRUCTURE TO REMAIN. PROTECT DURING ALL PHASES OF
CONSTRUCTION.
35. ROOF J; ROOFING SYSTEM ASSEMBLY TO REMAIN. MODIFY ROOF MEMBRANE AT PERIMETER INTERSECTION OF PARAPET TO
ROOF AND CMU WALL TO ROOF. CONTRACTOR SHALL EXERCISE CARE DURING DEMOLITION PROCEDURE TO AVOID DAMAGE TO
IN-PLACE ROOFING SYSTEM.
36. ROOF J; CONTRACTOR SHALL CAREFULLY REMOVE EXISTING COPING CAP, PARAPET FLASHING AND FASTENERS; INSPECT WOOD
NAILERS FOR WATER INTRUSION AND DAMAGE. IF DAMAGED, CUT AND REMOVE AFFECTED NAILERS AND PREPARE TO RECEIVE
NEW WORK. DISPOSE OF DEMOLISHED MATERIAL. RETAIN A SECTION OF COPING CAP AS A TEMPLATE FOR NEW CONSTRUCTION.
PROTECT IN-PLACE PARAPET WALL PANELING.
37. ROOF J; EXISTING STAINLESS STEEL SCUPPERS AND SUMP BOXES TO REMAIN (2 EA). MODIFY EXISTING WEST LEADER
OUTFLOW PER NEW CONSTRUCTION FLAG NOTES. MAINTAIN EAST LEADER IN CURRENT LOCATION.
38. ROOF J; CUT AND DISPOSE OF EAST AND WEST PARAPETS TO CONSTRUCT NEW OVERFLOW SCUPPERS. MATCH EXISTING
SCUPPER OPENING DIMENSIONS. BOTTOM OF OVERFLOW SCUPPER SHALL BE AT 2" ABOVE THE ROOF ELEVATION.
39. ROOF J; AT INTERSECTION OF WALL WITH ROOF - CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING FLASHING ASSEMBLY, TO INCLUDE, REGLET AND TERMINATION BAR WITH ATTACHMENTS, AS APPLICABLE.
40. ROOF I - J; REMOVE ELECTRICAL LIGHTNING PROTECTION SYSTEM ROOF MOUNTED ITEMS PER ELECTRICAL DRAWINGS.
41. GROUND LEVEL; REMOVE AND DISPOSE OF CONCRETE SPLASH BLOCKS.
42. ROOF K; EXISTING STANDING SEAM CANOPY ROOF K, INCLUDING GUTTER AND DOWNSPOUTS TO REMAIN. REFER TO NEW
CONSTRUCTION NOTES.
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
A
D d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
AD-101
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
R O
F
A
N
D
E M
O L
I T
I O
N
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
SCALE:
KEY PLAN
N.T.S.
GENERAL ROOF
AREAS A - H,
FACILITY 1645, CCAFS
GENERAL NOTES:
1. FLAG NOTES ARE INDICATIVE OF WORK TO BE ACCOMPLISHED, APPLICABLE TO EACH INDIVIDUAL ROOF AREA AND REFERENCE
TYPICAL DETAILS AS INDICATED IN SUBSEQUENT DRAWINGS.
2. THE ACRONYM 'TYP.', ATTACHED TO INDIVIDUAL FLAG NOTES, REFLECTS WORK TO BE COMPLETED TO THE APPLICABLE ROOF
AREAS.
3. REFER TO NOTES, LEGEND AND ABBREVIATIONS ON DRAWING A-001.
4. REFER TO DEMOLITION FLAG NOTES ON DRAWING AD-100.
5. INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE EXISTING DOCUMENTS AND OBSERVABLE IN-PLACE
ELEMENTS. CONTRACTOR TO FIELD MEASURE AND VERIFY FOR EXACT DIMENSIONS.
GRAPHIC SCALE: 3/32" = 1'-0"
10' 20' 30'10' 5' 0'
SCALE:
ROOF PLAN - GENERAL ROOF AREAS AND CANOPIES - FACILITY 1645 - DEMOLITION
3/32" = 1'-0"
H
G
E
D
C
1 2 3 4 5 6 7 8 9 10
10.9 11 12 13 14 15 15.5 16 17
L
K
J
I
H
G
A
B
C
D
E
F
1 2 3 4 5 6 7
CANOPY ROOF J,
FACILITY 1645, CCAFS
CANOPY ROOF I,
FACILITY 1645, CCAFS
R O
O F
S L
O P
E
R O
O F
S L
O P
E
RIDGE
R O
O F
S L
O P
E
R O
O F
S L
O P
E
R O
O F
S L
O P
E
151'-1"
35'-0" 13'-8"
5'-0"
8'-8 1/2"
20'-5"
31'-2" 30'-5" 106'-9"
10'-1 1/2"
11'-4 1/16"
21'-4" 97'-0"
F
83'-0"
RIDGE
R O
O
P E
R O
O
P E
R O
O F
S L
O P
E
T
R
U
E
N
O
R
T
H
N O
R T
H
P L A
N
T
R
U
E
N
O
R
T
H
N O
R T
H
P L A
N
6"±
6"±
10 11 20
10 11 20
10 11 20
BELOW
TYP.
8 19
3'-2 1/2"
14'-7 1/2"
TYP.
9 13
19'-3"
TYP.
1712 10
TYP.
ROOF C - ELEVATOR
SHAFT ROOF
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
10 11 20
TYP.
TYP.
ROOF
A
ROOF
H
ROOF
G
ROOF
B
ROOF
C
ROOF
E
ROOF
D
ROOF
J
ROOF
I
10 11 20
10 11 20
TYP.
ROOF
F
TYP.
TYP.
TYP.
10"±
24"±
A
B
C
D
F
E
G H
S I N
G L
E
S
L O
P E
P E
R
E
X I S
T I N
G
D E
V
S I N
G L
E
S
L O
P E
P E
R
E
X I S
T I N
G
D E
V
CANOPY ROOF K,
FACILITY 1645, CCAFS
ROOF
K
2'-6"
ROOF D
ABOVE
ROOF J
GUTTER AND DOWNSPOUT
ABOVE TO BE DEMOLISHED,
SHOWN FOR REFERENCE
GROUND LEVEL
16'12'8'0'2'4' 4'
GRAPHIC SCALE 3/16" = 1'-0"
TYP.
TYP.
TYP.
TYP.
36'-1 3/8"
5'-0"
TYP.
TYP.
TYP.
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
A
D d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
AD-901
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
P H
O T
E M
O L
I T
I O
N
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C
C A
F S
F L
O R
I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
SCALE:
PHOTOS - GENERAL ROOF AREAS A THROUGH C - DEMOLITION:
NONE
PHOTO AD-901:
ROOF A - NORTH VIEW - OVERALL VIEW SHOWING ROOF STEP-DOWN
GENERAL NOTES:
REFER TO NOTES, LEGEND AND ABBREVIATIONS ON DRAWING
A-001.
REFER TO DEMOLITION PLANS AND FLAG NOTES ON DRAWINGS
AD-100 AND AD-101.
INFORMATION ON EXISTING CONDITIONS IS BASED ON THE
AVAILABLE EXISTING DOCUMENTS AND OBSERVABLE IN-PLACE
ELEMENTS. CONTRACTOR TO FIELD MEASURE AND VERIFY
EXACT DIMENSIONS.
PLAN NORTH NOTE:
PHOTOS ORIENTATION ARE IN ACCORDANCE WITH KEY PLAN
'PLAN NORTH' THIS DRAWING.
REMOVE GUTTERS, GUTTER BRACKETS, DOWNSPOUTS, AS WELL AS BASE DOOR THRESHOLD AND EAVE FLASHING PER ARCHITECTURAL NOTES
R E
M O
X I S
T I N
G
R
O O
F I N
G
S
Y S
T E
M
D
O W
N
T
O
C
O N
C R
E T
E
D
E C
K
P
C
H I T
E C
T U
R A
L
F
L A
G
N
O T
E S
PHOTO AD-901:
ROOF A - NORTH EAST
VIEW - EAVE GUTTER
PHOTO AD-901:
ROOF A - WEST VIEW - ROOF ACCESS DOOR (SET OF 2 IMAGES)
PHOTO AD-901:
ROOF A - SOUTH VIEW - OVERALL VIEW
PHOTO AD-901:
ROOF A - NORTH VIEW - WALL/ROOF MECHANICAL ITEMS (TOTAL OF 2 IMAGES)
PHOTO AD-901:
ROOF A - WEST WALL - GUTTER, DOWNSPOUT, BACK SPLASH, BASE FLASHING
AND CONCRETE STAIR WITH RAILING ASSEMBLY (TOTAL OF 2 IMAGES)
PHOTO AD-901:
ROOF B - RAILING ASSEMBLY AND PITCH PANS
PHOTO AD-901:
ROOF B - SOUTH WEST VIEW - BACK
SPLASH AND BASE FLASHING
PHOTO AD-901:
ROOF B - NORTH VIEW
PHOTO AD-901:
ROOF B - NORTH WEST VIEW -
GUTTER, DOWNSPOUT, BACK SPLASH
AND BASE/DOOR FLASHING
PHOTO AD-901:
ROOF B - NORTH VIEW - BASE FLASHING,
SPLASH BLOCKS AND RAILING ASSEMBLY
PHOTO AD-901:
ROOF C - SOUTH VIEW
PHOTO AD-901:
ROOF C - SOUTH VIEW - ELEVATOR SHAFT
ROOF CURB AND FLASHING
PHOTO AD-901:
ROOF C - NORTH VIEW
PHOTO AD-901:
ROOF C - SOUTH VIEW - ROOF CURB AND FLASHING
PHOTO AD-901:
ROOF C - SOUTH WEST VIEW - STEEL VIEWING PLATFORM (SET OF 5 IMAGES)
REMOVE ROOF MOUNTED MECHANICAL EQUIPMENT TO INCLUDE
SUPPORTS AND PITCH PANS PER ARCHITECTURAL NOTES
SCALE:
KEY PLAN
N.T.S.
GENERAL ROOF
AREA A, FACILITY
1645, CCAFS
T
R
U
E
N
O
R
T
H
N O
R T
H
P L A
N
GENERAL ROOF AREA B,
FACILITY 1645, CCAFS
GENERAL ROOF AREA C,
FACILITY 1645, CCAFS
REMOVE GUTTERS, GUTTER BRACKETS, DOWNSPOUTS, SPLASH BLOCKS, WALK-PADS, RAILING PITCH PANS, AS WELL AS BASE DOOR THRESHOLD AND EAVE FLASHING PER ARCHITECTURAL NOTES
REMOVE GUTTERS, GUTTER BRACKETS, SPLASH BLOCKS, RAILING PITCH PANS, AS WELL AS BASE DOOR THRESHOLD, CURB FLASHING AND EAVE FLASHING PER ARCHITECTURAL NOTES
OPEN GRATING
FLOOR PLATES
STEEL VIEWING
PLATFORM
SUPPORT
ASSEMBLY
STEEL VIEWING
PLATFORM
STAIRWELL
TOP LANDING
AND ACCESS
GATE
STEEL VIEWING
PLATFORM
ACCESS
PHOTO AD-901:
ROOF B - WALK PADS
10 11
TYP.
TYP.
6 7
TYP.
TYP.
TYP.
TYP.
12 13
10 11 12 13
10 11 12
10 11 12
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
D
F
E
G
H
J
I
K
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
A
D d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
AD-902
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
P H
O T
E M
O L
I T
I O
N
P
C
H O
S A
D B
F
G
B
E A
R D
R E
P A
V
E L
O P
E
F
C
C A
F S
F L
O R
I D
A
F
C C
A F
S
F
L
D B
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
SCALE:
PHOTOS - GENERAL ROOF AREAS D THROUGH H AND CANOPY ROOF AREAS I, J AND K - DEMOLITION:
NONE
GENERAL NOTES:
REFER TO NOTES, LEGEND AND ABBREVIATIONS ON DRAWING
A-001.
REFER TO DEMOLITION PLANS AND FLAG NOTES ON DRAWINGS
AD-100 AND AD-101.
INFORMATION ON EXISTING CONDITIONS IS BASED ON THE
AVAILABLE EXISTING DOCUMENTS AND OBSERVABLE IN-PLACE
ELEMENTS. CONTRACTOR TO FIELD MEASURE AND VERIFY
EXACT DIMENSIONS.
PLAN NORTH NOTE:
PHOTOS ORIENTATION ARE IN ACCORDANCE WITH KEY PLAN
'PLAN NORTH' THIS DRAWING.
PHOTO AD-902:
ROOF D - NORTH VIEW
R E
M O
X I S
T I N
G
R
O O
F I N
G
S
Y S
T E
M
D
O W
N
T
O
I N
P
L A
C E
D E
B
S T
R A
C
H I T
E C
T U
R A
L
F
L A
G
N
O T
E S
PHOTO AD-902:
ROOF D - NORTH WEST VIEW -
MECHANICAL EQUIPMENT CURB FLASHING
PHOTO AD-902:
ROOF D - SOUTH VIEW
REMOVE GUTTERS, GUTTER BRACKETS, DOWNSPOUTS, EAVE/RAKE FLASHING, VTR, EQUIPMENT CURB FLASHING AS WELL AS CORRODED PORTION OF TOP LANDING RAILING PER ARCHITECTURAL NOTES
PHOTO AD-902:
ROOF E - NORTH VIEW
PHOTO AD-902:
ROOF F - NORTH VIEW -
GUTTER AND BASE FLASHING
SCALE:
KEY PLAN
N.T.S.
CANOPY ROOF J,
FACILITY 1645, CCAFS
PHOTO AD-902:
ROOF G - ROOF VIEW - GUTTER AND
MECHANICAL EQUIPMENT CURBS
CANOPY ROOF I,
FACILITY 1645, CCAFS
GENERAL ROOF AREA H,
FACILITY 1645, CCAFS
GENERAL ROOF AREA E,
FACILITY 1645, CCAFS
REMOVE GUTTERS, GUTTER BRACKETS, DOWNSPOUTS, AS WELL AS BASE AND EAVE/RAKE FLASHING PER ARCHITECTURAL NOTES
REMOVE METAL ROOF ASSEMBLY DOWN TO STEEL JOISTS AS WELL AS GUTTERS, GUTTER BRACKETS, DOWNSPOUTS AND BASE FLASHING PER ARCHITECTURAL NOTES
GENERAL ROOF AREA D,
FACILITY 1645, CCAFS
GENERAL ROOF
AREA F, FACILITY
1645, CCAFS
GENERAL ROOF AREA G,
FACILITY 1645, CCAFS
T
R
U
E
N
O
R
T
H
N O
R T
H
P L A
N
PHOTO AD-902:
ROOF D - NORTH AND WEST VIEWS - ROOF D ACCESS STEEL STAIRS (SET OF 2 IMAGES)
PHOTO AD-902:
ROOF D - NORTH
WEST VIEW - VTR
PHOTO AD-902:
ROOF I - EAST ELEVATION
PHOTO AD-902:
ROOF I - SOUTH EAST VIEW
PHOTO AD-902:
ROOF I - ELECTRICAL ITEMS
PHOTO AD-902:
ROOF I - BASE FLASHING
PHOTO AD-902:
ROOF J - SOUTH WEST VIEW - COPING
CAP AND ROOFING SYSTEM
PHOTO AD-902:
ROOF J - WEST ELEVATION - STEEL SCUPPERS,
LEADER AND PARAPET SIDING PANELS
PHOTO AD-902:
ROOF J - NORTH EAST VIEW - SCUPPERS,
PARAPET, BASE FLASHING AND ELECTRICAL ITEM
EXISTING ROOFING SYSTEM TO REMAIN IN PLACE; CLEAN SURFACE AND PREPARE TO RECEIVE NEW
ROOFING SYSTEM; REMOVE COPING CAP PARAPET AND FLASHING PER ARCHITECTURAL NOTES
10 11
TYP.
12 13
TYP.
TYP.
PHOTO AD-902:
ROOF H - OVERALL ROOF VIEW - GUTTER
10 11 12 13
TYP.
PHOTO AD-902:
ROOF I - BASE FLASHING
TYP.
TYP.
15 1
TYP.
TYP.TYP.
TYP.
TYP.
32 40
TYP.
35 36
TYP.
TYP.
PHOTO AD-902:
ROOF I - SOUTH VIEW
PHOTO AD-902:
ROOF E - NORTH WEST VIEW
PHOTO AD-902:
ROOF J - WEST ELEVATION - STEEL SCUPPERS,
LEADER AND PARAPET SIDING PANELS
39 4038
TYP.
TYP.
A
B
C
PHOTO AD-902:
ROOF K - SOUTH VIEW
(SET OF 2 IMAGES)
TYP.
GENERAL ROOF
AREA K, FACILITY
1645, CCAFS
PHOTO AD-902:
ROOF J - NORTH VIEW -
BACK SPLASH AND LEADER
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
A
D d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
A-100
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
F L
T
E W
C O
N S
T R
U C
T I O
N
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
GENERAL NOTES - NEW CONSTRUCTION:
1. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS OF ROOF PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL EXERCISE CARE TO AVOID DAMAGE TO EXISTING BUILDING STRUCTURE AND SHALL PROVIDE TEMPORARY
ROOF ENCLOSURE TO AVOID WATER INTRUSION IN THE BUILDING DURING ALL PHASES OF CONSTRUCTION.
3. CONTRACTOR SHALL FIELD VERIFY THE PRESENCE AND LOCATIONS OF ANY EXISTING MECHANICAL AND ELECTRICAL ROOF
MOUNTED ITEMS PRIOR TO CONSTRUCTION.
4. THE CONTRACTOR SHALL REMOVE ONLY AS MUCH ROOFING SYSTEM AS CAN BE REPAIRED, REPLACED AND WATERPROOFED IN
ONE DAY. THE FACILITY USERS SHALL BE PROTECTED FROM DEMOLITION MATERIAL, DUST, ETC. BY BARRIERS FROM AND/OR
PLASTIC SHEETS AS REQUIRED. DEMOLITION WORK SHALL CEASE IF THE PUBLIC IS ENDANGERED IN ANY WAY. CONTRACTOR
SHALL PREVENT NOXIOUS FUMES FROM ENTERING INTO THE BUILDING THROUGH FRESH INTAKE VENTS.
FLAG NOTES - NEW CONSTRUCTION:
GENERAL BLDG ROOF 1645 - WALLS AND ROOF FOR ROOF AREAS A - H:
1. ROOF A - H; PROVIDE AND INSTALL NEW SBS MODIFIED BITUMEN ROOFING SYSTEM EQUAL TO SOPREMA. REFER TO TYP. ROOF
PROFILE SECTIONS 1AND 2 ON DRAWING A-501 AND TO SPECIFICATIONS.
2. ROOF A; AT STEP-DOWN AREAS - PROVIDE AND INSTALL NEW EXPANSION JOINT MEMBRANE EQUAL TO SOPRAJOINT, SOPREMA
PER DETAIL 4, DRAWING A-502.
3. ROOF A, B AND E - H; AT INTERSECTION OF WALL AND LOWER ROOF AREAS - PROVIDE AND INSTALL NEW BASE FLASHING AND
TERMINATION BAR. REFER TO TYP. BASE FLASHING DETAIL 5, DRAWING A-502.
4. ROOF A AND B; AT EXISTING DOOR THRESHOLD - PROVIDE AND INSTALL NEW ST. STL. THRESHOLD FLASHING (3 LOCS).
5. ROOF A - D; PROVIDE NEW VTR EXTENSIONS TO COMPLY WITH HEIGHT CLEARANCE REQUIREMENTS AS REQUIRED, TYP.;
PROVIDE AND INSTALL NEW VTR FLASHING PER DETAIL 7, DRAWING A-503.
6. ROOF A - H; PROVIDE AND INSTALL NEW NOM. 2"x P.T. NAILERS AT PERIMETER OF ROOF, AS REQUIRED (FOR BIDDING PURPOSES, ASSUME 1500 B.FT). ATTACH TO EXISTING DECK SUBSTRATE WITH ST. STL. FASTENERS - ATTACHMENT AND SPACING OF
NAILERS SHALL BE IN ACCORDANCE WITH CURRENT WIND CODES AND PER WIND LOADING REQUIREMENTS AS INDICATED IN
WIND DESIGN PRESSURE TABLE SHOWN ON DRAWING A-001. PROVIDE NEW 24 GA ST. STL. EAVE AND RAKE FLASHING AND
CLEATS. REFER TO DETAILS 1, 2 AND 3 ON DRAWING A-502 AND DETAIL 11 ON A-503.
7. ROOF A - H; PROVIDE AND INSTALL NEW 24 GA ST. STL. RECTANGULAR GUTTERS. PROVIDE 22 GA ST. STL. GUTTER CLEATS, 1"x1/8" ST. STL. BRACKETS AND STRAPS. BRACKETS AND 22 GA ST. STL. GUTTER STRAPS SHALL ALTERNATE AT MAX. 18" O.C.
SPACING. SEE TYP. EAVE GUTTER DETAILS 1, 2, AND 3 ON DRAWING A-502 AND TYP. GUTTER DETAILS AND SCHEDULE ON
DRAWING A-506.
8. ROOF A - H; PROVIDE AND INSTALL NEW 24 GA ST. STL. DOWNSPOUTS WITH MINIMUM (4) 1"x1/8" ST. STL. SUPPORT BRACKETS, SEE TYP. DETAILS AND SCHEDULE ON DRAWING A-506 AND PROJECT SPECIFIC NOTE 6 ON DRAWING A-001.
9. ROOF A - H; APPLY 3-COAT PRIME / PAINT SYSTEM AT WALL LOCATIONS DAMAGED BY DEMOLITION WORK. COLOR AND SHEEN
SELECTION SHALL MATCH EXISTING AND TO BE APPROVED BY CONTRACTING OFFICER.
10. ROOF A - H; APPLY NEW SINGLE COMPONENT POLYURETHANE SEALANT TO ALL FASTENERS AND ATTACHMENT POINTS OF
ROOFING COMPONENTS AND CMU WALLS, INCLUDING EXISTING CMU WALL PENETRATIONS, AS REQUIRED.
11. ROOF D AND G; EXISTING AIR INTAKE HOOD (ROOF D) AND EXHAUST FAN (ROOF G) - REINSTALL EA ASSEMBLY TO EXISTING
CURBS; PROVIDE AND INSTALL NEW CURB FLASHING WITH ATTACHMENTS TO MATCH EXISTING; SEE TYP. DETAIL 6, DRAWING
A-502. RE-CONNECT EXHAUST FAN (ROOF G) PER ELECTRICAL DRAWINGS.
12. ROOF C; AT ELEVATOR SHAFT - PROVIDE AND INSTALL NEW BASE FLASHING WITH ATTACHMENTS PER LEGACY ELEVATOR
SHAFT DETAIL 8, DRAWING A-503. CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE ELEVATOR SHAFT COMPONENTS BY NEW
CONSTRUCTION WORK.
13. ROOF A - C; PROVIDE AND INSTALL NEW WALKWAY CONSISTING OF SBS MODIFIED BITUMEN CAP SHEET, SIMILAR TO SPECIFIED
SOPREMA CAP SHEET SHOWN ON PROFILE SECTION 1 ON DRAWING A-501, WITH CONTRASTING COLOR. ADDITIONALLY, CONTRACTOR SHALL PROVIDE 200 SQ.FT. OF NEW WALKWAY AT VARIOUS LOCATIONS PER GOVERNMENT DIRECTION (IN LIEU OF
THE SPECIFIED WALKWAY MATERIAL AND WITH CONTRACTING OFFICER APPROVAL, PROVIDE WALKWAY MEMBRANE PADS
EQUAL TO SOPRAWALK, BY SOPREMA).
14. ROOF D; AT EXISTING STAIR TOP LANDING - PROVIDE AND INSTALL NEW 1 1/2" DIAM. ST. STL. TOP OF SECTION OF LANDING
GUARDRAIL. AT EACH SIDE OF TOP LANDING, PROVIDE AND INSTALL NEW SCH 40, 1 1/2" DIAM. ALUMINUM GUARDRAIL AND WALL
MOUNTED BRACKET. ATTACH BRACKET TO WALL AS INDICATED ON DETAIL 11, DRAWING A-503. GUARDRAIL CONFIGURATION
SHALL BE EQUAL TO 'HOLLAENDER - SPEEDRAIL'. TOP OF GUARDRAIL SHALL BE AT 42" ABOVE ROOF SURFACE AND POST
SPACING SHALL BE AT MAX. 6'-0" O.C. CONFIGURATION SHALL MATCH EXISTING. GUARDRAIL ASSEMBLIES SHALL COMPLY WITH
OSHA 1910.29 AND PERFORMANCE REQUIREMENTS IN SPECIFICATIONS. PROVIDE NEW ST. STL. CHAIN AND SIGN AT BOTTOM OF
STAIR TO MATCH EXISTING.
15. ROOF C; PROVIDE AND INSTALL (3 EA) NEW SCH 40, 1 1/2" DIAM. ALUMINUM GUARDRAIL. PROVIDE WALL MOUNTED BRACKETS.
ATTACH BRACKET TO EXISTING IN-PLACE STEEL BRACKETS AT EXTERIOR WALL OF ROOF C AS INDICATED IN DETAIL10 ON
DRAWING A-503. GUARDRAIL CONFIGURATION SHALL BE EQUAL TO 'HOLLAENDER - SPEEDRAIL'. TOP OF GUARDRAIL SHALL BE
AT 42" ABOVE ROOF SURFACE AND POST SPACING SHALL BE AT 6'-0" O.C. OR SHALL BE AT THE SPACING OF IN-PLACE STEEL
BRACKETS. GUARDRAIL CONFIGURATION SHALL MATCH EXISTING, ASSEMBLIES SHALL COMPLY WITH OSHA 1910.29 AND
PERFORMANCE REQUIREMENTS IN SPECIFICATIONS.
CONT.:
16. ROOF A, B AND GROUND LEVEL; PROVIDE AND INSTALL WATER DISSIPATING CONCRETE SPLASH BLOCKS AT BOTTOM OF NEW
DOWNSPOUTS AND LEADERS AS SHOWN ON DRAWINGS. CONCRETE SPLASH BLOCK SHALL BE EQUAL TO 'ATLANTIC COAST
PRECAST' AND SHALL BE SIZED AT 11"x24" FOR UPPER LEVELS AND NOM. 14"x30" AT GROUND LEVEL. FOR SPLASH BLOCKS ON
ROOFS A AND B, THE CONTRACTOR IS TO PROVIDE SACRIFICIAL CAP SHEET, APPROXIMATELY 30" x 30", AS SPECIFIED ON FLAG
NOTE 13 THIS DRAWING.
17. EXISTING BUILDING WALLS SHOWN FOR REFERENCE, TYP.
18. ROOF A; THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW IN-KIND, 15 TON ROOF-TOP HVAC PACKAGE UNIT. INSTALL ON
NEW GALVANIZED STEEL FRAME AS REQUIRED TO SUPPORT THE EQUIPMENT AND MAINTAIN INTERFACE ELEVATION WITH
EXISTING DUCTWORK (PER SHOP DRAWINGS AS INDICATED ON NOTE 5 AND 6 ON DRAWING AD-100). INSTALL NEW ROOF
MOUNTED PVC CONDENSATE LINE. RE-CONNECT HVAC PACKAGE UNIT TO IN-PLACE DUCTWORK AND TO NEW CONDENSATE
LINE. TEST AND BALANCE EQUIPMENT AND DUCTWORK FOR FULL OPERATIONAL CAPACITY. FOR DOWN-TIME REQUIREMENTS
REFER TO PROJECT SPECIFIC NOTE 3 ON DRAWING A-001.
19. ROOF C; CONTRACTOR SHALL RE-INSTALL VIEWING PLATFORM FLOOR GRATING PANELS IN PREVIOUS LOCATIONS. ATTACH TO
IN-PLACE STEEL FRAMING AND FASTEN WITH ST. STL. FASTENERS AND SPOT WELDING. FOR FULLY SUPPORTED FLOOR SYSTEM.
REPAIR EXISTING SURFACES WITH ZINC-RICH TIE-COAT PRIMER AND PAINT TO MATCH EXISTING COLOR. FOR PURPOSES OF
BIDDING ASSUME 300 SQ FT.
20. ROOF A - E; NEW LIGHTNING PROTECTION SYSTEM PER ELECTRICAL DRAWINGS.
21. ROOF B; AT EXISTING GUARDRAILS, PROVIDE AND INSTALL NEW BASE FLASHING PER DETAIL 9, DRAWING A-503.
22. ROOF C; AT EXISTING MISSION DEDICATED EQUIPMENT CONCRETE PEDESTAL - PROVIDE AND INSTALL NEW BASE FLASHING
WITH ATTACHMENTS PER DETAIL 17, DRAWING A-505. CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE EQUIPMENT
COMPONENTS BY NEW CONSTRUCTION WORK.
FLAG NOTES 23 - 30 NOT USED.
CANOPY ROOFS 1645 - WALLS AND ROOF FOR ROOF AREAS I - K:
31. ROOF I; PROVIDE AND INSTALL NEW 24 GA, PRE-FINISHED, GALVALUME, STANDING SEAM ROOF, INCLUDING BUT NOT LIMITED
TO ST. STL. THERMAL CLIPS AND FASTENERS. ATTACH METAL ROOF TO 1/2" P.T. PLYWOOD, FELT AND UNDERLAYMENT AS
RECOMMENDED BY MFR. REFER TO TYP. ROOF PROFILE SECTION 4 ON DRAWING A-501, METAL ROOF DETAILS ON DRAWING
A-504 AND TO SPECIFICATIONS.
32. ROOF I; AT NORTH AND WEST SIDE OF ROOF I VERTICAL METAL ROOF - PROVIDE AND INSTALL NEW CANT STRIP, FLASHING AND
TERMINATION BAR. REFER TO LEGACY SECTION 5 ON DRAWING A-504.
33. ROOF I; PROVIDE AND INSTALL NEW 24 GA ST. STL. RECTANGULAR GUTTERS. PROVIDE 22 GA ST. STL. GUTTER CLEATS, 1"x1/8"
ST. STL. BRACKETS AND STRAPS. BRACKETS AND 22 GA ST. STL. GUTTER STRAPS SHALL ALTERNATE AT MAX. 18" O.C. SPACING.
SEE EAVE GUTTER DETAIL 16, DRAWING A-504 AND TYP. GUTTER DETAILS AND SCHEDULE ON DRAWING A-506.
34. ROOF I; PROVIDE AND INSTALL NEW 24 GA ST. STL. DOWNSPOUTS WITH MINIMUM (4) 1"x1/8" ST. STL. SUPPORT BRACKETS, SEE
TYP. DETAILS AND SCHEDULE ON DRAWING A-506.
35. ROOF J; PROVIDE AND INSTALL NEW SBS MODIFIED BITUMEN ROOFING SYSTEM EQUAL TO SOPREMA. PROTECT IN-PLACE
METAL PARAPET. REFER TO TYP. ROOF PROFILE SECTION 3 ON DRAWING A-501 AND TO SPECIFICATIONS.
36. ROOF J; PROVIDE AND INSTALL NEW METAL PARAPET COPING CAP, FLASHING ON CONTINUOUS CLEAT, WOOD NAILERS AS
REQUIRED AND FASTENERS. NEW COPING CAP PROFILE, PAINT COLOR AND SHEEN SHALL MATCH EXISTING AND SHALL BE
APPROVED BY CONTRACTING OFFICER. REFER TO TYP. COPING CAP FLASHING DETAIL 19 ON DRAWING A-505.
37. ROOF J; EXISTING ST. STL. SCUPPERS AND SUMP BOXES TO REMAIN IN-PLACE. CONTRACTOR SHALL ENSURE THAT EXISTING
SCUPPERS INTERIOR SLEEVE IS FEATHERED INTO NEW ROOFING SYSTEM. EXTEND WEST LEADER OUTFLOW TO SOUTH EDGE
OF LOBBY STRUCTURE.
38. ROOF J; PROVIDE AND INSTALL NEW OVERFLOW SCUPPERS ADJACENT TO IN-PLACE SCUPPERS AS INDICATED ON TYP.
OVERFLOW SCUPPER FABRICATION DETAIL, DRAWING A-506. TRIM INTERIOR AND EXTERIOR FACE OF SCUPPER SLEEVES. NEW
OVERFLOW SCUPPER PAINT, COLOR AND SHEEN SHALL MATCH EXISTING AND SHALL BE APPROVED BY CONTRACTING OFFICER.
39. ROOF J; AT INTERSECTION OF WALL WITH ROOF - PROVIDE AND INSTALL NEW BASE FLASHING AND TERMINATION BAR. REFER
TO TYP. BASE FLASHING DETAIL 18 ON DRAWING A-505.
40. ROOF I AND J; FOR ELECTRICAL LIGHTNING PROTECTION SYSTEM ROOF MOUNTED ITEMS, REFER TO ELECTRICAL DRAWINGS.
41. ROOF J; - APPLY 3-COAT PRIME / PAINT SYSTEM AT WALL LOCATIONS DAMAGED BY DEMOLITION WORK. COLOR AND SHEEN
SELECTION SHALL MATCH EXISTING AND TO BE APPROVED BY CONTRACTING OFFICER.
42. ROOF K; WIRE BRUSH CORROSION FROM SOFFIT AREA, PRIME WITH ZINC RICH PRIMER AND FINISH WITH ZINC FINISH TOP COAT
TO MATCH EXISTING IN COLOR AND SHEEN APPROXIMATELY 120 SQ.FT.
43. GROUND LEVEL; PROVIDE AND INSTALL WATER DISSIPATING CONCRETE SPLASH BLOCKS AT BOTTOM OF NEW DOWNSPOUTS
AND LEADERS AS SHOWN ON DRAWINGS. CONCRETE SPLASH BLOCK SHALL BE EQUAL TO 'ATLANTIC COAST PRECAST' AND
SHALL BE SIZED AT NOM. 14"x30".
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
A d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
A-101
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
R O
A
N
N
W
N
S T
R U
C T
I O
N
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
SCALE:
KEY PLAN
N.T.S.
GENERAL ROOF
AREAS A - H,
FACILITY 1645, CCAFS
16'12'8'0'2'4' 4'
GRAPHIC SCALE 3/16" = 1'-0"
SCALE:
ROOF PLAN - GENERAL ROOF AREAS AND CANOPIES - FACILITY 1645 - NEW CONSTRUCTION
3/32" = 1'-0"
ELEVATOR
SHAFT ROOF
1/4" SLOPE
S
L O
P E
S
L O
P E
S I N
G L
E
S
L O
P E
P E
R
E
X I S
T I N
G
D E
V
H
G
E
D
C
1 2 3 4 5 6 7 8 9 10
10.9 11 12 13 14 15 15.5 16 17
L
K
J
I
H
G
A
B
C
D
E
F
1 2 3 4 5 6 7
CANOPY ROOF J,
FACILITY 1645, CCAFS
CANOPY ROOF I,
FACILITY 1645, CCAFS
S L
O P
E
S L
O P
E
S L
O P
E
RIDGE
S
L O
P E
S L
O P
E
S L
O P
E
151'-1"
35'-0" 13'-8"
5'-0"
8'-8 1/2"
20'-5"
31'-2" 30'-5" 106'-9"
10'-0"
11'-4 1/16"
21'-4" 97'-0"
F
83'-0"
RIDGE
6"±
6"±
T
R
U
E
N
O
R
T
H
N O
R T
H
P L A
N
T
R
U
E
N
O
R
T
H
N O
R T
H
P L A
N
1 6
TYP.
TYP.
TYP.
TYP.
6'-0" EXTENSION
3'-1 1/2"
19'-3"
14'-7 9/16"
TYP.
TYP.
A
B
C
D
F
E
G H
1/4" SLOPE
S
L O
P E
ROOF
A
ROOF
G
ROOF
B
ROOF
C
ROOF
E
ROOF
D
ROOF
I
ROOF
F
ROOF
F
ROOF
F
GENERAL NOTES:
1. FLAG NOTES ARE INDICATIVE OF WORK TO BE ACCOMPLISHED, APPLICABLE TO EACH INDIVIDUAL ROOF AREA AND REFERENCE TYPICAL
DETAILS AS INDICATED IN SUBSEQUENT DRAWINGS.
2. THE ACRONYM 'TYP.', ATTACHED TO INDIVIDUAL FLAG NOTES, REFLECTS WORK TO BE COMPLETED TO THE APPLICABLE ROOF AREAS.
3. REFER TO NOTES, LEGEND AND ABBREVIATIONS ON DRAWING A-001.
4. REFER TO NEW CONSTRUCTION FLAG NOTES ON DRAWING A-100.
5. INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE EXISTING DOCUMENTS AND OBSERVABLE IN-PLACE ELEMENTS.
CONTRACTOR TO FIELD MEASURE AND VERIFY EXACT DIMENSIONS.
1/8" SLOPE
36'-1 7/16"
1 20
7 8
1 6 20
1 6
TYP.TYP.
TYP.
TYP.
1 6 20
1 6 20
1 6
35'-0"
10'-9 3/8"
39'-5 11/16"
15'-2 3/8"
ROOF
J
2'-6"
TYP.
3'-2 1/2"
6'-0" EXTENSION
S L
O P
E
TYP.
TYP.
TYP.
TYP.
TYP.
R I D
G E
H
I
P
H
I
P
10"±
24"±
S I N
G L
E
S
L O
P E
P E
R
E
X I S
T I N
G
D E
V
S L
O P
E
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
S L
O P
E
S L
O P
E
CANOPY
ROOF K,
FACILITY
1645, CCAFS
ROOF
K
10'-2 5/8"
5'-0"
PHOTO A-101:
ROOF J - EXISTING
LEADER CONDITION
2'-6"
ROOF D
ABOVE
ROOF J
NEW GUTTER AND
DOWNSPOUT ABOVE,
SHOWN FOR REFERENCE
1/4":12"
TYP.
1/8":12"
GRAPHIC SCALE: 3/32" = 1'-0"
10' 20' 30'10' 5' 0'
GROUND LEVEL
NOM 4'-0"
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
ROOF
H
1 6
TYP.
TYP.
TYP.
TYP.
VARIES
.23 TO
.93"±
TYP.
3'-0"
3'-0"
TYP.
3'-0"
3'-0"
3'-0"
43'-0"
TYP.
TYP.
3'-0"
3'-0"
3'-0"
TYP.
TYP.
A m r c w k s R
A E I S T E S S D
B E H
R
E P
L
R
O O
F
F A
C
D
W G
A d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
1 3/8"
16"
1 3/16"
1 1/16"
A-501
F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
D E
T A
I L
S
P
C
H O
S A
D B
F
G
B
E A
R D
D B
R E
P A
V
E L
O P
E
F
C C
A F
S
F
L O
R I D
A
F
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.