26_Jul_2018.pdf

PDF 72 KB Posted

Attached to
18E-166A-RF High Power Coaxial Standards Federal contract opportunity
Solicitation number
FA2263-18-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to 18E-166A-RF High Power Coaxial Standards, newest first.
File Type Posted
Attachment_3_-_DD_1423_18E-166B-RF_Coaxial_Stds.pdf PDF
FA226318RA001_3Jul2018.pdf PDF
Attachment_4_-_Section_L.pdf PDF
Attachment_1_-_PD.pdf PDF
Attachment_5_-_Section_M.pdf PDF
Attachment_2_-_DD_1423_18E-166A-RF_Coaxial_Stds.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA226318RA001, High Power Coaxial Standards Responses to Questions

(26 Jul 2018)

QUESTION:

Is there a required minimum calibration cycle for either High Power Coaxial Standards for the Precision Measurement Equipment Laboratories (PMEL’s) (18E-166A-RF) or Air Force Primary Standards Laboratory (AFPSL) (18E-166B-RF)?

Will the Purchase Description (PD) be modified to formally include a minimum calibration cycle for either?

ANSWER:

No, there is not a required minimum calibration cycle for either High Power Coaxial Standards for the PMEL’s or AFPSL.

The PD will not be modified to formally include a minimum calibration cycle for either.

File details come from the government source that posted it.