Justification and Approval For Other than Full and Open Competition
1. Agency and Contracting Activity:
2. Nature and/or Description of Action:
3. Description of Product:
4. Esimated Price:
5. Statutory Authority:
6. Reason for Authority Cited:
REQUESTING UNIT AUTHORIZED REPRESENTATIVE CERTIFICATION
I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
NAME: DATE:
TITLE: SIGNATURE:
CONTRACTING OFFICER APPROVAL
I certify that this justification is accurate and complete to the best of my knowledge and belief.
NAME: DATE:
TITLE: SIGNATURE:
LEGAL OFFICE APPROVAL (over the SAT)
I have reviewed the foregoing justification and approval and deem it legally sufficient.
NAME: DATE:
TITLE: SIGNATURE:
COMPETITION ADVOCATE APPROVAL (exceeding $650k but not exceeding $12.5m)
Based on the foregoing justification, I hereby approve this procurement on an other than full and open competition basis pursuant to the statuatory authority cited.
Approval is granted subject to the availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.
NAME: DATE:
TITLE: SIGNATURE:
| Dropdown1: [141 MSG/MSC] | |
| Dropdown2: [Sole Source - Modification] | |
| Text3: ALSC Architects provided a 100% design package (drawings, specifications, narrative, and cost estimate) in 2018 for project GJKZ112716, Multi Energy Conservation Measures as a task order against the AE IDIQ for Eastern WA. This project is currently funded to include Type C Services. Based on the complexity associated with multiple facilities and varying operations and tenants, Type C Services (Construction Inspection and Testing) are required. As ALSC Architects are the AE of record, they maintain responsibility for their design, and have all the existing design records and calculations. To have another AE firm review and implement this design work would require the new firm to interpret all requirements for enforcement and commissioning although warranty for the design would remain with ALSC. | |
| Text6: 12 Feb 2019 | |
| Text1: Architect/Engineer Type C Services (Construction Inspection and Testing) | |
| Text2: 27065.03 | |
| Dropdown3: [10 U.S.C.2304(c)(3) as implemented by FAR 6.302-3 -- Industrial Mobilization; Engineering, Developmental, or Research Capability; or Expert Services] | |
| Text4: Robert A. Loniewsky, Maj | |
| 2019-02-13T08:33:33-0800 | |
| LONIEWSKY.ROBERT.ADAM.1239044936 |
| Text5: Deputy Base Civil Engineer, 141 ARW | |
| 2019-02-13T10:00:45-0800 | |
| RICHARD.MATTHEW.R.1255089559 |
| Text7: Matthew Richard |
| Text8: Contracting Officer |
| Text9: 13 Feb 2019 |