Questions_and_Answers_17_Sep_2019.docx

DOCX document 12 KB Posted

Attached to
Replace Existing Lighting with LED Lighting Federal contract opportunity
Solicitation number
F3YTAJ9191AW0
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Questions and Answers 17 Sep 2019

View the file

Other files for this federal contract opportunity

Other files attached to Replace Existing Lighting with LED Lighting, newest first.
File Type Posted
Amendment_03_-_F3YTAJ9191AW0.docx DOCX document
Questions_and_Answers_LED_Lighting.docx DOCX document
Amendment_02_-_F3YTAJ9191AW0.docx DOCX document
TAFB_Electrical_Standards_-_2019_Final_Signed.pdf PDF
Amendment_01_-_F3YTAJ9191AW0.docx DOCX document
COMBO_LED_Lighting.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 17 Sep 2019:

Question: Will members require an escort each time they enter the area around bldg. 220?

Answer: Once the contract is awarded, the vendor will submit the names of those working on the project and those names will be added to an authority letter which will grant them access without the need of an escort (an area seven badge will not be necessary for this project). Further, any vehicles that require access will have to be added to an authority letter as well.

Question: Please confirm if new occupancy sensors will need to be installed.

Answer: New occupancy sensors will not be installed.

Question: Please confirm if all current UFC's requiring extended warranties are to be followed.

Answer: Standard commercial warranties apply.

Question: Please clarify the procedure for the abatement of lamps and ballasts.

Answer: Follow Tinker AFB electrical standards.

Question: Confirm that this RFP requires providing the fixtures as well as installing them? Is that correct?

Answer: All lighting and fixtures are to be provided by the contractor.

Question: Are there any available electrical drawings, showing as built or updated circuits, conductor sizing and existing or new panel schedule.

Answer: These are not available.

Question: Can you provide the part numbers for the fixtures Answer: Part numbers are not available.