Questions_and_Answers__2.pdf

PDF 61 KB Posted

Attached to
Robotic Grit Blast Booth System Federal contract opportunity
Solicitation number
F3QCCM8079A002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Questions and Answers #2

View the file

Other files for this federal contract opportunity

Other files attached to Robotic Grit Blast Booth System, newest first.
File Type Posted
Purchase_Desription-Robotic_Robotic_Grit_Blast_Booth_System_B169_L8WC14-4_27_18.pdf PDF
CDRLs_A007-_Acceptance_Test_Plan_-_Site.pdf PDF
Questions_and_Answers_-_Job_Walk.pdf PDF
CDRLs_A005-_Training.pdf PDF
CDRLs_A002-_Mishap.pdf PDF
CDRLs_A003-_COTS.pdf PDF
RFQ.pdf PDF
CDRLs_A004-_Chart.pdf PDF
CDRLs_A001-_Contractor's_Standard_Operating_Procedures.pdf PDF
CDRLs_A006-_Acceptance_Test_Plan_-_Factory.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robotic Grit Blast Booth System Questions and Answers #2

1. Question: Are we able to get pictures of the current manual system being used – hoppers, feeders, and recovery system?

Answer: It is not a requirement to match the existing equipment. The equipment provided shall meet the requirements in the PD.

2. Question: What is the rate of material deposited per minute?

Answer: The system shall be capable of blasting/depositing 6 lbs/min or lower and 20 lbs/min or higher.

This rate shall be adjustable per Purchase Description Section 3.1.B. The recovery system shall be able to handle the maximum deposition rate.

3. Question: What is the preferred type of recovery – pneumatic – dust collector only or mechanical using a conveyor?

Answer: The PD calls out a dust collector and media recovery. The equipment shall meet the requirements in the PD.

4. Question: What is the expected pit depth?

Answer: No pit depth requirement in the PD.

5. Question: Robot and track would be inside the enclosure and class 1 division 2. P350ia mounted to a seventh axis track, no additional covers or bags provided; planning on one gun mounted on M710 – is all of this acceptable?

Answer: The PD calls out that the rails shall be designed to operate in and withstand the abrasive grit environment.