QA_for_ACSC_Tables.pdf

PDF 48 KB Posted

Attached to
Trapezoidal Tables, Rectangular Tables, Storage Lockers and Hutches Federal contract opportunity
Solicitation number
F2XHC16208AW01
Issued by
Department of the Air Force Air Education and Training Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Trapezoidal Tables, Rectangular Tables, Storage Lockers and Hutches, newest first.
File Type Posted
QA_for_ACSC_Tables_2.pdf PDF
ACSC_SOR_Amendment_1.pdf PDF
Synopsis_Solicitation_ACSC_Furniture.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Original Date Posted 1 Sep 16 Q&A Posted 8 Sep 16

ACSC Tables Questions and Answers

1. Question: Will the Government accept a table height of 29 inches?

Response: Yes. See amended Statement of Requirements (SOR), paragraph 2.1.2.

2. Question: Can the legs of the tables be made of metal?

Response: Yes, See amended SOR, paragraph 1.0.

3. Question: Is there existing furniture and does it need to be removed?

Response: There is existing furniture and it will be removed by the Government.

4. Question: Are the stairs interior or exterior?

Response: The stair are interior.

5. Question: Will there be a site visit for this requirement?

Response: A site visit will be held on Wednesday, 14 September 2016 at 10:00 AM. The location for the site visit is 225 Chennault Circle, Maxwell AFB, AL, 36112.

6. Question: Please attach the drawings for the tables.

Response: See amended SOR. Attachments 1 and 2 have been added.

7. Question: Must the lockers be made of wood laminate, or can they be metal?

Response: All furniture items will be made of wood or engineered wood laminate materials.

8. Question: Can the user provide and images of what they are expecting to better help us meet the requirement?

Response: See amended SOR. Attachments 1 and 2 have been added.

9. Question: Delivery date is listed as 30 Sep 16. Is this an estimated award date? May a more realistic project milestone plan be proposed?

Response: Yes, a more realistic project milestone plan may be proposed.

10. Question: Is there a preferred method to phase the classrooms for installation?

Response: A schedule for installation will be worked out with the customer and contractor after award. No abnormal circumstances will be demanded that will increase cost.

11. Question: Are floorplans available for the building?

Response: No