Q and A No 2-10.pdf
PDF 64 KB Posted
- Attached to
- Containerized Housing Units Federal contract opportunity
- Solicitation number
- F2MTR29352AW01
About this file
This document contains questions and answers regarding solicitation number FA301620Q0032 for containerized housing units at Joint Base San Antonio Lackland in Texas. The solicitation seeks single-use, insulated shipping containers measuring 8 feet wide by 40 feet long. Each container will be divided into three rooms with insulated walls and equipped with durable laminate flooring. Electrical specifications include LED lights with switches, 110V outlets, and the ability to connect to 220V or 208V power. While mechanical HVAC is not required, the units must include properly sized heating and air conditioning. Plumbing is not needed. The related federal contract opportunity is for containerized housing units per the Statement of Objectives, issued by the Department of the Air Force Air Education and Training Command under solicitation number F2MTR29352AW01.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A No 12-15.pdf | ||
| Q and A No 11.pdf | ||
| Q and A No 1.pdf | ||
| Site Visit Meet-up Location Map.pdf | ||
| Location Map.pdf | ||
| Statement of Objectives.pdf | ||
| Base Pass Info Sheet.docx | DOCX document | |
| Specification Layout.pdf | ||
| Questions And Answers Sheet.docx | DOCX document | |
| Solicitation - FA301620Q0032.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
502 CONS/JBKAE Solicitation #FA301620Q0032 JBSA Lackland, TX Containerized Housing Units
QUESTIONS & ANSWERS
Question 2: Size of container?
Government Response: 8 feet wide by 40 feet long
Question 3: Condition of container?
Government Response: 1 time use container
Question 4: Container to be insulated?
Government Response: Yes, the walls and ceilings be insulated with R7 foam insulation or better within the space available with rigid, material that, in layers, provides maximum insulation value, reduces thermal bridging, and provides minimum 30 minutes of fire resistance
Question 5: Interior finish material?
Government Response: Insulated walls that will divide each connex into 3 rooms
Question 6: Flooring to be finished?
Government Response: Durable laminate flooring
Question 7: Electrical specifications?
Government Response: Containers must be able to connect to 220 volt or 208 volt power. Rooms will have an LED light with a switch and an outlet with 2-110V sockets
Question 8: Mechanical?
Government Response: Nothing will be mechanical (vice HVAC)
Question 9: HVAC?
Government Response: All rooms will be equipped with heating and air conditioning properly designed to fit the needs
Question 10: Plumbing?
Government Response: No plumbing will be needed