FA3047-13-R-0026_Amendment_0002.doc

DOC document 500 KB Posted

Attached to
Washer/Dryer/Duct Lease, Service, Maintenance
Solicitation number
F2M3CB3057AQ01
Issued by

About this file

This amendment incorporates a new Performance Work Statement dated 29 Jan 2014 which supercedes previous Performance Work Statement dated 13 Sept 2013.

View the file

Other files

File Type Posted
FA3047-13-R-0026_Amendment_0004.doc DOC document
FA3047-13-R-0026_Amendment_0003.doc DOC document
Solicitations_Questions.docx DOCX document
FA3047-13-R-0026_Amendment_0001.doc DOC document
FA3047-13-R-0026_Washer-Dryer-Duct.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

PERF WORK STATEMENT 29 JAN 14

PERFORMANCE WORK STATEMENT 29 JAN 2014

PERFORMANCE WORK STATEMENT

WASHER/DRYER MAINTENANCE/REPAIR/LEASING

AND CLOTHES DRYER EXHAUST DUCT CLEANING SERVICE

29 January 2014

1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other items or services necessary for Washer/Dryer Maintenance, Repair and Leasing and Clothes Dryer Exhaust Duct Cleaning service as defined in this Performance Work Statement (PWS) at Lackland AFB, Lackland Training Annex, Wilford Hall Ambulatory Surgical Center and Kelly Field Annex. Contractor shall be responsible for the delivery, installation, cleaning, maintenance, repair, removal and relocation of contractor furnished washers and dryers. Contractor shall be responsible for the cleaning, maintenance, repair, and relocation of Government furnished washers and dryers. Washer/dryer locations and types are listed on Appendix 1, Workload History. Contractor shall monitor, schedule and clean clothes dryer exhaust ducts as necessary to minimize the amount of lint accumulation and ensure ducts do not pose a safety or fire hazard. Facility numbers, duct sizes, quantities and recommended cleaning schedules for dryer ducts are listed on Appendices 3A, 3B, and 3C Dryer Duct Workload History.

1.1. BASIC SERVICES

1.1.1 Contract Manager. The contractor shall provide a Contract Manager or alternate who shall be responsible for the operations, management, compliance of contract requirements and quality control. Contract Manager/alternate shall respond to the Contracting Officer (CO) or Contracting Officer’s Representative (COR) within two hours of notification.

1.1.2. Washer/Dryer Repair Technicians. The contractor shall provide repair technicians who are qualified to work on the washers/dryers. Contractor shall be responsible for, but not limited to, responding to service calls, machine repair, preventative maintenance, scheduled inspections, dryer exhaust duct cleaning and monitoring of equipment. The contractor shall maintain a log of all inspections performed, repairs and preventative maintenance accomplished. The log shall be made available to the Contracting Officer Representative (COR) for review and copies provided within two business days of request.

1.2. REQUIREMENTS

1.2.1. Washer/Dryer Service Tickets. The COR will prepare washer/dryer service request tickets for all calls received by base customers. The contractor shall pick up the service request tickets from the COR, Monday through Friday, no later than 8:00 A.M. The contractor shall complete the service ticket by identifying the response date, a short summary of repair performed or reason the equipment was not made operational. Completed service ticket shall be returned to the COR within 48 hours of ticket pick up time (excluding weekends and federal holidays). Equipment shall be repaired and operational within the same 48-hour period. If a contractor provided appliance cannot be made operational within the 48-hour time frame, the contractor shall replace the appliance with a fully operational machine no later than 60 hours after the service ticket pick up. Contractor shall notify COR of replacement date and time so service ticket may be closed out. If a contractor provided appliance is not repaired or replaced within 60 hours (excluding weekends and federal holidays), the Government will not pay for the inoperable machine. Replacement appliances shall not be older than the machine being replaced and shall conform to the requirements of the PWS and the contract.

1.2.2. Service Call Historical Data. For informational purposes only, washer/dryer historical data for fiscal years FY08 – FY12 is provided on Appendix 2.

1.2.3. Equipment Quality Standards. All machines shall be brand new at time of the start of the first period of performance. Replacement appliances shall not be older than the current age of the machine installed at the beginning of the contract. Replacement equipment shall be the same size and color. All machines shall be in compliance with Executive Order 13123, Greening the Government Through Efficient Energy Management, DoD Instruction 4170.11, Installation Energy Management, and Energy Policy Act (EPACT) 2005, Public Law 109-58, where applicable.

1.2.4. Washer and Dryer Appliances. The contractor shall furnish, deliver, install, repair and maintain the number of washers and dryers for each facility as listed in Appendix 1 (except Government Furnished Equipment (GFE) Appendix 4). Washers and dryers shall be heavy duty, commercial or industrial brand/design and have the minimum number of control knobs, switches, settings and cycles. All washers and dryers shall be white in color. Washers and dryers shall operate without the use of coins or tokens and shall not have any coin or token slot attachments.

1.2.4.1. Dryer Exhaust Metal Ducting. The contractor shall ensure rigid metal ducting is used for all 30 lb single and stacked dryers, from the dryer to the facility permanent exhaust system. Dryer exhaust vents shall be firmly attached to prevent the ducting from coming loose. The contractor shall ensure flexible aluminum ducting is used for all other dryers.

1.2.4.2. Appliance Floor Anchoring System. When requested by the Contracting Officer (CO)/COR, the contractor shall furnish and install a metal floor anchor system to secure equipment to prevent the movement of appliances by facility users. Materials used for floor anchor system shall be new and durable

1.2.4.3. System Modifications. The contractor shall modify the existing support systems (i.e. exhaust systems, water lines, gas lines, and electrical lines, etc.) as necessary to install contractor equipment and make it fully operational. All system modifications shall be coordinated and approved by the CO prior to the commencement of any work. The contractor shall notify the COR prior to performing any work involving gas lines, splitters, cut-offs, etc. The contractor shall furnish and install gas-splitters, shut offs, reducers, nipples and any other equipment and materials as required to ensure machines operate correctly. Machines shall be grounded in accordance with manufacturer’s recommendations and National Electric Code. The contractor shall provide labor and material cost breakdowns to the Government, which must be approved by the CO prior to commencement of work. The CO may delegate the authority to review and approve cost for labor, parts and materials to the COR.

1.2.4.4. Washer/Dryer Maintenance. At a minimum, the contractor shall monitor and inspect all washers and dryers monthly to ensure equipment is operational and performing according to design. Preventative maintenance shall be performed to identify potential problems and to repair them before equipment actually fails. Washer and dryer connections such as hoses, exhaust vents, gas lines, etc., shall be inspected during the scheduled equipment inspections. Contractor shall inspect all washers and dryers monthly in order to maintain and repair the exterior of the machines. The contractor shall submit a monthly maintenance schedule to the COR for all appliances at least 5 business days before the start of each month. Maintenance schedule shall include the date and approximate time each machine shall be serviced.

1.2.4.4.1. Washer/Dryer Maintenance and Repair - Government Furnished Equipment (GFE) (APPENDIX 4). The contractor is responsible for all maintenance and repair of government furnished washers & dryers in accordance with paragraph 1.2.4.4. and in accordance with the manufacturer’s recommendations. The contractor shall be responsible for all warranty related issues concerning parts replacement and repair during the warranty period.

1.2.5. Washers. Washers shall be the largest size commercially available (no smaller than 16 lb capacity) that can fit in the same locations as existing equipment listed in Appendix 1. Existing washer dimensions are 27” W x 25 ½” D x 42 ¾” H. Contractor shall furnish all parts and accessories and make all connections (hot and cold water hoses, drain hose, etc), to make equipment operational. The hot and cold water lines and drain hoses are not cost reimbursable. Washers shall be equipped with a UL listed, molded 3 prong 110V male plug.

1.2.6. Dryers. Dryers shall be the largest capacity (minimum of 18 lb) possible for the location and electric or gas operated as indicated on Appendix 1. The current three sizes of dryer dimensions are as follows: 18 lb dryer – 29” W x 25 ½” D x 41 ¾” H; 30 lb stackable dryer – 31 1/2” W x 42 1/2 “ D x 75 1/2” H; and, 18 lb stackable dryers - 27” W x 28” D x 75 1/4” H. Dryers shall have a “push to start” button, which operates only when door is closed. Dryers shall be heavy-duty machines designed specifically for commercial use. All gas dryers shall be equipped with electronic igniter. Contractor shall furnish electrical cords for electric dryers (the electrical cords are not cost reimbursable). Dryer cords shall be equipped with a UL listed, molded 3 or 4 prong 110V or 220V male plug, whichever is applicable to the building electrical requirement. The contractor shall furnish all flexible gas lines for gas dryers.

1.2.6.1. Stackable Dryers (18 lb and 30 lb). Dryers shall be gas or electric as indicated on Appendix 1. Dryers shall have a “push to start” button, which operates only when door is closed. Stackable dryers consisting of one (1) drum equal one (1) each, and 2 drums equal 1 stackable unit or 1 pair (see applicable CLINS). Inoperable machines will be deducted per drum, not per pair.

1.2.7. Filter and Vent Cleaning. The contractor shall inspect and clean all dryer exhaust vents monthly, from the dryer itself to the permanent exhaust system. Contractor shall inspect dryer lint filters and immediately replace torn or unusable filters. Contractor shall ensure dryer exhaust vents are properly secured to dryer and exhaust ducting at all times to prevent fire hazards. Contractor shall identify and replace deteriorated ducting as part of the monthly cleaning schedule. Contractor shall ensure areas surrounding dryers are free from lint, debris etc, after each service.

1.2.8. Appliance Identification and Signage. All contractor provided washers and dryers shall be labeled with a machine number (i.e. D100 for Dryer #100, W303 for Washer #303) for easy identification. Identification numbers shall be non-removable and easily viewed. The contractor shall also identify equipment as property of the contractor (where applicable). The contractor shall furnish and apply “Operating Instructions” decals on each appliance that will be prominently displayed in plain view. The contractor shall furnish and apply any other signage deemed necessary for proper usage and safe operation of equipment.

1.2.8.1 Appliance Identification and Signage Government Furnished Equipment. GFE provided washers and dryers shall have a separate numbering system (i.e. GW #100 for Washer, GD #103 for Dryer) to easily identify them as government provided equipment.

1.2.9. Replacement Equipment. The contractor shall maintain, at his own storage facility, sufficient stock to replace equipment that cannot be made operational as required in Paragraph 1.2.1 and 1.2.3 above.

1.2.10. Dryer Exhaust Cleaning Schedule. The contractor shall establish and submit a monthly dryer duct cleaning schedule for all work to the COR at least 5 business days before the start of each month. The schedule shall identify the date and time when cleaning services will be performed in each facility. Changes to the cleaning schedule shall be immediately identified to the COR. The contractor shall post a cleaning schedule in the laundry room for each facility.

1.2.11. Access to Ducts. The contractor shall gain access to ducts, both interior and exterior. Contractor may disconnect and remove dryers, exhaust louvers, grills and duct access covers as necessary to gain access to the interior of exhaust ducts. Contractor shall reinstall dryers and ducting immediately after duct cleaning is completed in a facility. Contractor shall not cause damage to dryers, gas lines, electrical connections, and ducting. The contractor shall be responsible for making repairs to damages caused by the contractor at no additional cost to the government.

1.2.11.1. The contractor will be allowed to cut additional access openings and install additional access covers, if required, to gain additional access into the exhaust ductwork. New access covers shall be made of sheet metal and shall be easily accessible and airtight when in the closed position. The contractor shall get approval from the COR prior to cutting new openings in dry exhaust ducting. . The contractor shall provide labor and material cost breakdowns to the Government, which must be approved by the CO prior to commencement of work. The CO may delegate the authority to review and approve cost for labor, parts and materials to the COR.

1.2.12. Duct Cleaning. The contractor shall monitor, schedule and clean ducts as needed to ensure ducts do not fill with lint, are clean and lint/dirt free and do not pose a fire/safety hazard. The contractor shall thoroughly clean all areas of the interior and exterior of dryer exhaust ducts and adjacent areas so that all traces of dirt, mildew, lint, etc., are removed. The contractor shall clean all components to the dryer exhaust duct system to include exhaust caps, grills, louvers, bird/insect screens, rain caps, exhaust fan hoods and the exterior of ducts if exposed. The contractor shall clean the floor area around all dryers, specifically behind the dryers where lint and trash accumulate. Floor shall be cleaned of all dirt, lint, grime, trash, etc.

1.2.12.1. In facilities where multi dryer ducts are available, the contractor will be allowed to shut off only one system at a time for cleaning.

1.2.13. Machine Reinstallation. The contractor shall reinstall all washers and dryers removed for work back to their original location (includes back in floor anchoring system where applicable). Contractor shall test gas line connections after dryers are reinstalled to ensure no gas leaks are present. Contractor shall make repairs to connections as necessary to correct any gas leaks. All washers and dryers shall be returned to operation at completion of work for each facility. The contractor shall routinely check all vent connections to ensure dryers exhaust ducts are connected to dryer flex hoses.

1.2.14. Machine Relocation. There may be instances when the contractor is responsible for temporarily removing CFE or GFE machines from a building for renovations. If there is space elsewhere in the building or on the installation for temporary storage of the machines, it will be made available to the contractor. Otherwise, the contractor shall store only the CFE machines at his facility until such time as the renovations are complete. GFE shall not be removed from the installation by the Contractor.

1.3. GENERAL INFORMATION.

1.3.1. Hours of Operation. All work shall be performed during the normal duty day, 7:30 A. M. to 4:30 P. M., Monday thru Friday, except for federal holidays. Arrangements may be made in the case of building modifications, installation of floor anchor systems and washer/dryer installation to allow for weekend work at no additional cost to the government.

1.3.2. Appliance Inventory. The contractor shall provide the COR with a complete and accurate inventory list of all machines installed within 10 business days of contract start. The inventory list shall contain, as a minimum, appliance type, size, serial number, assigned machine ID#, year of manufacture and building number where each machine is located. An updated and accurate inventory list shall be submitted to the CO and COR within the first five business days of the first month of each quarter (October, January, April and July), or upon request of the CO or COR.

1.3.3. Phase-Out and Phase-In. The phase-out of old washers and dryers shall be performed during the last month of this contract . Both contractors shall work together in order to maintain washer and dryer capacity in each facility during each day of the phase-in and phase-out period. The new contractor shall submit a phase-in schedule two (2) days after contract award. The government will provide a copy of the phase-in schedule to the incumbent contractor. The new contractor shall coordinate installation of new machines with the incumbent contractor removing the old machines. The incumbent contractor shall remove old washers and dryers in accordance with the phase-in schedule. The incumbent contractor will not be allowed to store any washers and dryers on base. The new contractor shall submit a daily list of all washer and dryers placed each day of the phase-in period to the Contracting Officer and the Contracting Officer Representative, No facility shall be left without washer and dryers during the transition period.

1.3.4. Additions and Deletions of CFE Washers/Dryers/Services. The government will provide the contractor with a written contract modification for any washer/dryer/duct cleaning additions or deletions. The government will provide a minimum of seven (7) calendar days advance notice, when possible, when machines/services are required or when they need to be removed/deleted. In certain circumstances, it may be necessary for the contractor to store the ordered machines at their facility until building/facility is ready for equipment installation. The government has the right to order machines/services in excess of those originally estimated. The contractor shall be obligated to provide machines/services at the negotiated rate shown in the contract for the type of machines/services ordered. This is applicable regardless of the number of option years remaining on the contract.

1.3.5. Temporary Support Requirements. In the event of mass deployments, natural disasters, temporary facility occupation and other events of a similar nature, the contractor shall provide washers and dryers as requested by the government for a temporary period, with operational machines of the same type and age as other contractor furnished machines. The contractor shall be obligated to place machines in any building on the installations regardless if it is part of the original requirement or not. Equipment/service may be required for a number of days, weeks or months. Pricing shall be in accordance with the submitted/established pricing for the equipment requested.

1.3.6. Quality Assurance. Contracting Officer Representative is responsible for all inspection and acceptance of contractor performance to ensure services are received in accordance with the PWS. The COR will evaluate the contractor’s performance through intermittent on-site inspections of the contractor’s performance, 100% inspection of certain tasks and customer complaints.

1.3.6.1. Quality Control. The contractor shall develop and maintain a Quality Control Program (QCP) to ensure services are performed in accordance with the PWS. The contractor shall develop and implement procedures to track, identify, prevent, remedy and ensure non-recurrence of defective service. The contractor is responsible for the quality control program to include updates to ensure compliance with the PWS. Contractor’s QCP shall be summarized and provided to the Contracting Officer in the form of a Quality Control Plan within ten (10) calendar days after award of contract.

1.3.7. Washer and Dryer Usage. The contractor is advised that washers and dryers will receive very high usage, above normal wear and tear, due to the training missions on Lackland AFB. The contractor can also expect to continually replace control knobs, lint screens, timers, screws, agitators, transmissions, etc., due to high usage, overloading, etc.

1.3.7.1. Equipment Abuse. The contractor shall notify the COR in writing immediately after discovering abuse to the equipment. The COR will go to the site and, together with the contractor, verify whether or not the equipment has been abused. Abused equipment is not subject to the requirements of paragraph 1.2. The contractor shall submit in writing all equipment abuse items to the CO and COR no later than three (3) workdays of discovering the abuse. A cost breakdown for labor and material to repair equipment shall be submitted to the CO or COR no later than five (5) workdays from the date of the discovery.

1.3.8. Clean-up. Contractor shall be responsible for leaving appliances and work areas clean at the end of each repair/inspection/replacement. Contractor shall dispose of trash, rubbish, parts, etc., at an off-base approved disposal site.

1.3.9. Performance of Services During Crisis Declared by the National Command Authority or Overseas Combatant Commander. Services under this contract have been determined not to be essential for performance during crisis.

1.3.10. Criminal Background Checks: Contractor shall ensure a criminal background check has been performed on all employees working on the installation. Only minimum level National Crime Information Center (NCIC) background checks are required for the performance of this contract. This requirement is mandatory as called for in AFI 10-245, Air Force Antiterrorism Standards, paragraph 2.18.3 at http://www.e-publishing.af.mil/These checks shall be accomplished prior to the first day of performance. Background checks shall be accomplished at no additional cost to the government.

1.3.11. Air Force implementation of Section 8108 of Public Law 112-10 of the Department of Defense (DOD) and Full-Year Continuing Appropriations Act, 2011.

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the United States Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.”

*Reporting Period: Contractors are required to input data by 31 October of each year. However, due to the delayed implementation, input of FY 12 data is required by 31 Mar 13.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

1.4. Security Requirements for Unclassified Services

1.4.1. Base Entry and Vehicle Control Requirements: Contractor shall comply with AFFARS Clause 5352.242-9000, “Contractor access to Air Force Installations” which is hereby incorporated by reference if not otherwise included. Contractor personnel shall comply with all on-base traffic laws.

1.4.2. List of Employees: The contractor shall provide the Contracting Officer a current list of employees within 5 calendar days after receiving award or Notice of Award. The list shall include employee’s name, social security number, and date of investigation if applicable. Updated lists shall be provided when an employee’s status or information changes.

1.4.3. Reporting Requirements: The contractor shall comply with AFI 71-101, Volume I, Criminal Investigations. Contractor shall report to the 802 Security Forces any information or circumstances which may pose a threat to DOD or contractor personnel, resources, or DOD information.

1.4.4. Physical Security: The contractor shall comply with Force Protection Condition FPCON procedures, Random Antiterrorism Measures (RAMS) and local search/identification requirements.

1.4.5 Personnel: Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, bearing the company name or logo. The coloring or design of the items selected should be such that it identifies personnel easily and quickly for safety and personnel protection.

The government is authorized to restrict the employment under the contract of any Company employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general well being, or operational mission of the installation and its population.

1.4.6 Vehicles: All contractor furnished vehicles shall display the contractor’s company logo and vehicle number. Company logo shall be a magnetic sign or painted/stenciled on both sides of the vehicle and shall be easily visible/legible to base personnel.

2. SERVICE SUMMARY.

Item #
Performance Objective
PWS Para.
Monthly Performance Threshold
Washers and dryers are operating as designed
1.2.
2 defects
Dryer exhaust ducts are cleaned IAW monthly schedule
1.2.10 & 1.2.12
3 defects
Additions or deletions of equipment/service completed as requested
1.3.4
1 defect
Service tickets are picked up and completed within 48 hours.
1.2.1

1.2.4.4, 1.2.7, 1.2.10 1 defect

5
Provide monthly maintenance/cleaning schedule and current inventory listing IAW PWS.
1.2.4.4

1.3.2 1 defect

6
Preventative maintenance is performed in accordance with schedule.
1.2.4.4 & 1.2.7
3 defects
7
Quality Control inspection procedures are followed and documented in accordance with Contractor’s Quality Control Program (QCP)
1.3.6.1 and Contractor’s QCP
1 defect

Defect - A service that does not meet the requirements of the PWS; multiple defects may be found during one inspection/reported on one customer complaint (ex. inspection may identify defects for SS items 1 & 5).

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Facilities. The government will not provide a building, room or trailer space on the installation for contractor use during the performance of the contract.

3.2. Utilities. The government will provide water, electricity and gas as needed in performance of work. The contractor shall provide all tools, equipment, and other items as necessary to perform tasks in accordance with the PWS.

3.3. Equipment. The Government will provide 144 commercial, electric, energy star compliant washing machines and 96 commercial electric stack dryers (18 lb dual drum) in the Airman’s Training Complex #1, bldg 6578, and Airman’s Training Complex #2, bldg 6586. 42 washer / dryer combination machines will also be provided by the Government in three Airman dormitories (bldgs 10802, 10804 and 10806). Washers/Dryers shall be maintained in accordance with paragraphs 1.2.4.4. and 1.2.4.4.1.

The following information is as complete and accurate as possible regarding future requirements. All information provided represents the government’s best estimate at this time. Information regarding future requirements is based on various factors including contract construction/renovation completion dates. Facilities requiring washers and dryers in the future may not be available at the estimated time frame specified.

APPENDIX 1

WORKLOAD HISTORY

ESTIMATED QUANTITIES AND LOCATION OF

WASHERS AND DRYERS

Bldg No.

Floor
No. of Washers
No. of Dryers
Dryer Type

E = Electric

JBSA - LACKLAND TNG ANNEX

G = Gas

126
1

E 18 LB STACKABLE

E 18 LB STACKABLE

E 18 LB STACKABLE

127
1

E 18 LB STACKABLE

E 18 LB STACKABLE

E 18 LB STACKABLE

150
1
2
2
E
181
1
2
2
E
199
1
1
1
E
1111
1
4
4
E (BEAST 1)
1115
1
4
4
E (BEAST 2)
1118
1
4
4
E (BEAST 3)
1125
1
4
4
E (BEAST 4)

JBSA - LACKLAND

1209
1

E Bldg currently vacant, awaiting decision to

E renovate or demolish.

1212
1
8
8
G
1215
1
7
9
E
1217
1
7
9
E
1219
1
7
9
E
1249
1
1
1
E
1400
1

E

E

E

1405
1

E

E

E

1410
1

E

E

E

2418
1
1
1
G
2437
1
2
2
G
2441
1

G

G

G

2445
1

G

G

G

2447
1

G

G

G

3610
1

G

G

3620
1
8
8
G
4985
1
3
3
E
5214
1
1
1
E

EAST

WEST

G 30 LB STACKABLE

G 30 LB STACKABLE

6578
2

E 18LB STACKABLE

E 18LB STACKABLE

E 18LB STACKABLE

Government Furnished Equipment (GFE)

6586
2

E 18LB STACKABLE

E 18LB STACKABLE

E 18LB STACKABLE

Government Furnished Equipment (GFE)

ATC #3
2

E 18LB STACKABLE (24 w/16 sets dryers)

E 18LB STACKABLE (24 w/16 sets dryers)

E 18LB STACKABLE(24 w/16 sets dryers)

* Anticipated move in June 2014

ATC #4
2

E 18LB STACKABLE(24 w/16 sets dryers)

E 18LB STACKABLE(24 w/16 sets dryers)

E 18LB STACKABLE(24 w/16 sets dryers)

* Anticipated move in April 2015

EAST

WEST

G 30 LB STACKABLE

G 30 LB STACKABLE

7346
1
1
2
E, G
7358
B
4
4
E
7425
1

G

G

7426
1

G

G

7435
2
10
10
G
7436
2
10
10
G
7460
3
16
16
G

EAST

WEST

G 30 LB STACKABLE

G 30 LB STACKABLE

EAST

WEST

G 30 LB STACKABLE

G 30 LB STACKABLE

EAST

WEST

G 30 LB STACKABLE

G 30 LB STACKABLE

EAST

WEST

G 30 LB STACKABLE

G 30 LB STACKABLE

EAST

WEST

G 30 LB STACKABLE

Floor
No. of Washers
No. of Dryers
Dryer Type
10060
1
32
29
G
10207
1
50
46
G
10263
1
48
86
G 18 LB STACKABLE
10330
1
1
1
E
10390
1
32
29
G

10416

EAST

WEST

G 30 LB STACKABLE

10504

E 18 LB STACKABLE

E 18 LB STACKABLE

E 18 LB STACKABLE

E 18 LB STACKABLE

10541
1
25
23
G
10650
2

E

E

10652
2

E

E

10656
2

E

E

10802
2

E Combination stacked washer/dryer

E Combination stacked washer/dryer

GOVERNMENT FURNISHED EQUIPMENT

10804
2

E Combination stacked washer/dryer

E Combination stacked washer/dryer

GOVERNMENT FURNISHED EQUIPMENT

10806
2

E Combination stacked washer/dryer

E Combination stacked washer/dryer

GOVERNMENT FURNISHED EQUIPMENT

WILFORD HALL AMBULATORY SURGICAL CENTER

4550
B

E

Floor
No. of Washers
No. of Dryers
Dryer Type

JBSA-LACKLAND KELLY ANNEX

868
1
1
1
E
2009
2

E

E

2015
2

E

E

2018
2

E

E

2020
2

E

E

2086
1
1
1

G

Estimated

Totals

690 CFE*

186 GFE**

831CFE*

234 GFE**

151 Electric

232 Gas

98 Electric 18 lb stackable dryers (each machine has two drums = 196 drums)

43 Gas 18 lb stackable dryers (each machine has two drums = 86 drums)

83 Gas 30 lb stackable dryers (each machine has two drums = 166 drums)

GOVERNMENT FURNISHED EQUIPMENT

42 Electric Combination Washer/Dryer Stackable (each machine has two drums = 84 drums)

96 Electric 18lb stackable dryers (each machine has two drums = 192 drums)

144 Commercial electric washing machines

B = BASEMENT, E = ELECTRIC, G = GAS, LBS = POUNDS

*Contractor Furnished Equipment (CFE)

**Government Furnished Equipment (GFE)

Stackable dryers are reflected above as individual drums, rather than sets

The following information is as complete and accurate as possible regarding future requirements. All information provided represents the government’s best estimate at this time. Information regarding future requirements is based on various factors including contract construction/renovation completion dates. Facilities requiring washers and dryers in the future may not be available at the estimated time frame specified

Historical data is provided for informational purposes only. This data represents the total number of service calls for the approximately 1,800 machines provided to the government on the previous washer/dryer service contract. All types of repairs are included from FY08 through FY12.

APPENDIX 2

HISTORICAL DATA

WASHER/DRYER SERVICE CALLS

FY 08
FY 09
FY 10
FY 11 FY12
OCTOBER
00
49
44
70 105
NOVEMBER
14
50
53
85 131
DECEMBER
21
78
74
65 66
JANUARY
20
62
59
118 117
FEBRUARY
31
44
65
59 68
MARCH
32
56
71
91 54
APRIL
39
64
106
109 115
MAY
23
103
42
135 101
JUNE
23
79
88
125 136
JULY
39
84
70
124 128
AUGUST
20
90
72
106 184
SEPTEMBER
33
108
164
79
295
867
908
1166 1205

The following information is as complete and accurate as possible regarding future requirements. All information provided represents the government’s best estimate at this time. Information regarding future requirements is based on various factors including contract construction/renovation completion dates. Facilities requiring washers and dryers in the future may not be available at the estimated time frame specified

APPENDIX 3A

DRYER DUCT WORKLOAD HISTORY

Recommended Bi-Monthly Cleaning Schedule (Every Other Month)

BLDG NO.
BLDG
FLOOR LOCATION
# DUCTS
DUCT SIZE
REMARKS
181
Dorm
1st
2
4” diameter x 10’ long

4” diameter x 30’ long

1215
Dorm
1ST
1
12” x 16” x 21’ long
9 dryers connected to central duct
1217
Dorm
1st
1
12” x 16” x 21’ long
9 dryers connected to central duct
1219
Dorm
1st
1
12” x 16” x 21’ long
9 dryers connected to central duct
3620
TLF
1st
1
8” long x 12” x 12” long
8 dryers connected to central duct
5570
DLI
1st Room

2nd Room

12” x 24” x 15’ long

12” x 24” x 15’ long 12 dryers connected to central duct

8 dryers connected to central duct

6578
ATC
1st

2nd 3rd 4th

10”diameter X 15’ long

10” diameter X 15” long

10” diameter X 15’ long

10” diameter X 15’ long

10” X 15’ long

14” X 15’ long

18” X 15’ long

22” X 15’ long

22” X 105’ long

From flex duct to vertical duct

Same as above

Same as above

Same as above

(1st Floor) Vertical duct 1st to 2nd floor duct expansion with duct clean out on 1st floor at bottom of vertical duct

(2nd Floor) Vertical duct 2nd to 3rd floor duct expansion

(3rd Floor) Vertical duct 3rd to 4th floor expansion

(4th Floor) Vertical duct 4th floor to duct clean out in mechanical room at exhaust fan motor

(Mechanical Room) Exhaust duct from exhaust fan to exit from building

6586
ATC
1st

2nd 3rd 4th

10”diameter X 15’ long

10” diameter X 15’ long

10” diameter X 15’ long

10” X 15’ long

14” X 15’ long

18” X 15’ long

From flex duct to vertical duct

Same as above

Same as above

(1st Floor) Vertical duct 1st to 2nd floor duct expansion with duct clean out on 1st floor at bottom of vertical duct

(2nd Floor) Vertical duct2nd to 3rd floor duct expansion

(3rd Floor) Vertical duct 3rd to 4th floor expansion

(4th Floor) Vertical duct 4th floor to duct clean out in mechanical room at exhaust fan motor

(Mechanical Room) Exhaust duct from exhaust fan to exit from building

ATC 3
ATC
1st

2nd 3rd 4th

10”diameter X 15’ long

10” diameter X 15’ long

10” diameter X 15’ long

10” X 15’ long

14” X 15’ long

18” X 15’ long

From flex duct to vertical duct

Same as above

Same as above

(1st Floor) Vertical duct 1st to 2nd floor duct expansion with duct clean out on 1st floor at bottom of vertical duct

(2nd Floor) Vertical duct2nd to 3rd floor duct expansion

(3rd Floor) Vertical duct 3rd to 4th floor expansion

(4th Floor) Vertical duct 4th floor to duct clean out in mechanical room at exhaust fan motor

(Mechanical Room) Exhaust duct from exhaust fan to exit from building

ATC 4
ATC
1st

2nd 3rd 4th

10”diameter X 15’ long

10” diameter X 15’ long

10” diameter X 15’ long

10” X 15’ long

14” X 15’ long

18” X 15’ long

From flex duct to vertical duct

Same as above

Same as above

(1st Floor) Vertical duct 1st to 2nd floor duct expansion with duct clean out on 1st floor at bottom of vertical duct

(2nd Floor) Vertical duct2nd to 3rd floor duct expansion

(3rd Floor) Vertical duct 3rd to 4th floor expansion

(4th Floor) Vertical duct 4th floor to duct clean out in mechanical room at exhaust fan motor

(Mechanical Room) Exhaust duct from exhaust fan to exit from building

7065
DLI
1st Room

2nd Room

12” x 24” x 15’ long same as above

7460
DLI Billeting
3
1

3” diameter x 22’ long

3” diameter x 12’ long

9085
RH&T
1st
2

18” x 24” x 15’ long

8” diameter x 6’ long 12 dryers connected to each duct

9110
RH&T
1st
2

18” x 24” x 15’ long

14 dryers connected to each duct

9210
RH&T
1st
2

18” x 24” x 15’ long

14 dryers connected to each duct

9310
RH&T
1st
2

18” x 24” x 15’ long

14 dryers connected to each duct

10060
Billeting
1st
3
18” x 18” x 30’ long
29 dryers connected to central ducts
10207
Billeting
1st
3
18” x 18” x 30’ long
46 dryers connected to central ducts
10263
Billeting
1st
3
18” x 18” x 30’ long
86 dryers connected to central ducts
10390
7 Level Dorm
1st
2
10” x 14” x 40’ long
29 dryers connected to central duct
10416
RH&T
1st
2
30” x 36” x 17’ long

8” diameter x 32” long 12 dryers connected to each duct

10541
Billeting
1st
3
18” diameter x 30 ‘ long
23 dryers connected to central ducts

The following information is as complete and accurate as possible regarding future requirements. All information provided represents the government’s best estimate at this time. Information regarding future requirements is based on various factors including contract construction/renovation completion dates. Facilities requiring washers and dryers in the future may not be available at the estimated time frame specified

APPENDIX 3B

DRYER DUCT WORKLOAD HISTORY

Recommended Quarterly Cleaning Schedule

BLDG NO.
BLDG
FLOOR LOCATION
# DUCTS
DUCT SIZE
REMARKS
126
LTA Dorm
1st

2nd

3rd

24” x 24” x 22’ long same as above same as above 12 dryers each floor w/6” x 12” adapter, all connected to central duct

127
LTA Dorm
1st

2nd 3rd

24” x 24” x 22’ long same as above same as above 18 dryers each floor w/6” x 12” adapter, all connected to central duct

1400
Dorm
1st

2nd

3rd

3” diameter x 8’ long same as above same as above Connected together in wall

1405
Dorm
1st

2nd

3rd

3” diameter x 8’ long same as above same as above Connected together in wall

1410
Dorm
1st

2nd

3rd

3” diameter x 8’ long same as above

Connected together in wall

2009
Dorm
2nd

3rd

6” diameter x 8’ long same as above 4 dryers each floor

2015
Dorm
2nd

3rd

6” x 10” x 10’ long same as above 4 dryers each floor

2018
Dorm
2nd

3rd

10” diameter x 14’ long same as above 4 dryers each floor

2020
Dorm
2nd

3rd

10” diameter x 14’ long same as above 4 dryers each floor

2086
KFA Gym
1st
1
8” x 5’ x 12’ long
2437
Billeting
1st
1
6” x 6” x 4’ long
2 dryers connected to central duct
2441
Billeting
1st

2nd

6” x 6” x 8’ long

2445
Billeting
1st

2nd

6” x 6” x 8’ long

2447
Billeting
1st

2nd

6” x 6” x 8’ long

3610
TLF
1st

2nd

6” x 10” x 8’ long

7346
Gym
1st
1

6’ x 9” x 12’ long

4’ x 10’ long

7358
Dorm
Basement
4
4” x 12’ long
7425
DLI
2nd
1
6” x 30” x 18’ long
6 dryers connected to central duct
7426
DLI
2nd
1
6” x 30” x 18’ long
6 dryers connected to central duct
7435
DLI
2nd
1
6” x 30” x 18’ long
10 dryers connected to central duct
7436
DLI
2nd
1
6” x 30” x 18’ long
10 dryers connected to central duct
10330
Gateway Gym
1st
1
3” diameter x 12’ long
10504
Dorm
1st

2nd 3rd 4th

10” into 12” X 15’ long same as above

10650
Dorm
2nd
2
3” diameter x 8’ long
7 dryers connected to duct in wall
10652
Dorm
2nd
2
3” diameter x 8’ long
7 dryers connected to duct in wall
10656
Dorm
2nd
2
3” diameter x 8’ long
7 dryers connected to duct in wall
10802
Dorm
1st

2nd

3” diameter x 8’ long same as above 7 dryers connected to duct in wall same as above

10804
Dorm
1st

2nd

3” diameter x 8’ long same as above 7 dryers connected to duct in wall same as above

10806
Dorm
1st

2nd

3” diameter x 8’ long same as above 7 dryers connected to duct in wall

The following information is as complete and accurate as possible regarding future requirements. All information provided represents the government’s best estimate at this time. Information regarding future requirements is based on various factors including contract construction/renovation completion dates. Facilities requiring washers and dryers in the future may not be available at the estimated time frame specified

APPENDIX 3C

DRYER DUCT WORKLOAD HISTORY

Recommended Annual Cleaning Schedule

BLDG NO.
BLDG
FLOOR LOCATION
# DUCTS
DUCT SIZE
REMARKS
199
Gym
1st
1
3” Diameter x 12” long
2418
Gym
1st
1
3” diameter x 12” long
4985
Dorm
1st
3
3” diameter x 12” long

APPENDIX 4

GOVERNMENT FURNISHED EQUIPMENT

WASHERS/DRYERS/COMBINATION WASHER/DRYER

GFE COMBINATION WASHER/DRYER

MANUFACTURER
MODEL
SERIAL NUMBER
BUILDING NUMBER
1
SPEED QUEEN
LTSA7AWM1500
1207029525
10802
2
SPEED QUEEN
LTSA7AWM1500
1208011612
10802
3
SPEED QUEEN
LTSA7AWM1500
1208036916
10802
4
SPEED QUEEN
LTSA7AWM1500
1209009351
10802
5
SPEED QUEEN
LTSA7AWM1500
1209009354
10802
6
SPEED QUEEN
LTSA7AWM1500
1209009357
10802
13
SPEED QUEEN
LTSA7AWM1500
1209009380
10802
14
SPEED QUEEN
LTSA7AWM1500
1209009382
10802
7
SPEED QUEEN
LTSA7AWM1500
1209009385
10802
8
SPEED QUEEN
LTSA7AWM1500
1209010615
10802
9
SPEED QUEEN
LTSA7AWM1500
1209010616
10802
10
SPEED QUEEN
LTSA7AWM1500
1209010618
10802
11
SPEED QUEEN
LTSA7AWM1500
1209010619
10802
12
SPEED QUEEN
LTSA7AWM1500
1209010620
10802
15
SPEED QUEEN
LTSA7AWM1500
1207029524
10804
16
SPEED QUEEN
LTSA7AWM1500
1208015410
10804
17
SPEED QUEEN
LTSA7AWM1500
1209009353
10804
27
SPEED QUEEN
LTSA7AWM1500
1209009358
10804
28
SPEED QUEEN
LTSA7AWM1500
1209009360
10804
18
SPEED QUEEN
LTSA7AWM1500
1209009362
10804
26
SPEED QUEEN
LTSA7AWM1500
1209009366
10804
19
SPEED QUEEN
LTSA7AWM1500
1209009370
10804
20
SPEED QUEEN
LTSA7AWM1500
1209009373
10804
21
SPEED QUEEN
LTSA7AWM1500
1209009374
10804
22
SPEED QUEEN
LTSA7AWM1500

1209009376 10804

23
SPEED QUEEN
LTSA7AWM1500
1209009378
10804
24
SPEED QUEEN
LTSA7AWM1500
1209010617
10804
25
SPEED QUEEN
LTSA7AWM1500
1209010621
10804
29
SPEED QUEEN
LTSA7AWM1500
1209009352
10806
30
SPEED QUEEN
LTSA7AWM1500
1209009356
10806
31
SPEED QUEEN
LTSA7AWM1500
1209009359
10806
32
SPEED QUEEN
LTSA7AWM1500
1209009361
10806
33
SPEED QUEEN
LTSA7AWM1500
1209009365
10806
34
SPEED QUEEN
LTSA7AWM1500
1209009368
10806
35
SPEED QUEEN
LTSA7AWM1500
1209009369
10806
36
SPEED QUEEN
LTSA7AWM1500
1209009372
10806
37
SPEED QUEEN
LTSA7AWM1500
1209009375
10806
38
SPEED QUEEN
LTSA7AWM1500
1209009377
10806
39
SPEED QUEEN
LTSA7AWM1500
1209009381
10806
40
SPEED QUEEN
LTSA7AWM1500
1209009383
10806
41
SPEED QUEEN
LTSA7AWM1500
1209010622
10806
42
SPEED QUEEN
LTSA7AWM1500
1209010623
10806

GFE WASHERS

MANUFACTURER
MODEL
SERIAL NUMBER
BUILDING NUMBER
1
SPEED QUEEN
LWNA11SP111TW01
1209000576
6578
2
SPEED QUEEN
LWNA11SP111TW01
1209000579
6578
3
SPEED QUEEN
LWNA11SP111TW01
1209002243
6578
4
SPEED QUEEN
LWNA11SP111TW01
1209002303
6578
5
SPEED QUEEN
LWNA11SP111TW01
1209021362
6578
6
SPEED QUEEN
LWNA11SP111TW01
1209021367
6578
7
SPEED QUEEN
LWNA11SP111TW01
1209021368
6578
8
SPEED QUEEN
LWNA11SP111TW01
1209021373
6578
9
SPEED QUEEN
LWNA11SP111TW01
1209021388
6578
10
SPEED QUEEN
LWNA11SP111TW01
1209021389
6578
11
SPEED QUEEN
LWNA11SP111TW01
1209021390
6578
12
SPEED QUEEN
LWNA11SP111TW01
1209021391
6578
13
SPEED QUEEN
LWNA11SP111TW01
1209021392
6578
14
SPEED QUEEN
LWNA11SP111TW01
1209021393
6578
15
SPEED QUEEN
LWNA11SP111TW01
1209021394
6578
16
SPEED QUEEN
LWNA11SP111TW01
1209021395
6578
17
SPEED QUEEN
LWNA11SP111TW01
1209021396
6578
18
SPEED QUEEN
LWNA11SP111TW01
1209021397
6578
19
SPEED QUEEN
LWNA11SP111TW01
1209021398
6578
20
SPEED QUEEN
LWNA11SP111TW01
1209021399
6578
21
SPEED QUEEN
LWNA11SP111TW01
209021400
6578
22
SPEED QUEEN
LWNA11SP111TW01
1209021401
6578
23
SPEED QUEEN
LWNA11SP111TW01
1209021402
6578
24
SPEED QUEEN
LWNA11SP111TW01
1209021403
6578
25
SPEED QUEEN
LWNA11SP111TW01
1209021404
6578
26
SPEED QUEEN
LWNA11SP111TW01
1209021405
6578
27
SPEED QUEEN
LWNA11SP111TW01
1209021406
6578
28
SPEED QUEEN
LWNA11SP111TW01
1209021408
6578
29
SPEED QUEEN
LWNA11SP111TW01
1209021409
6578
30
SPEED QUEEN
LWNA11SP111TW01
1209021410
6578
31
SPEED QUEEN
LWNA11SP111TW01
1209021412
6578
32
SPEED QUEEN
LWNA11SP111TW01
1209021413
6578
33
SPEED QUEEN
LWNA11SP111TW01
1209021414
6578
34
SPEED QUEEN
LWNA11SP111TW01
1209021415
6578
35
SPEED QUEEN
LWNA11SP111TW01
1209021416
6578
36
SPEED QUEEN
LWNA11SP111TW01
1209021417
6578
37
SPEED QUEEN
LWNA11SP111TW01
1209021418
6578
38
SPEED QUEEN
LWNA11SP111TW01
1209021419
6578
39
SPEED QUEEN
LWNA11SP111TW01
1209021420
6578
40
SPEED QUEEN
LWNA11SP111TW01
1209021421
6578
41
SPEED QUEEN
LWNA11SP111TW01
1209021422
6578
42
SPEED QUEEN
LWNA11SP111TW01
1209021423
6578
43
SPEED QUEEN
LWNA11SP111TW01
1209021424
6578
44
SPEED QUEEN
LWNA11SP111TW01
1209021427
6578
45
SPEED QUEEN
LWNA11SP111TW01
1209021428
6578
46
SPEED QUEEN
LWNA11SP111TW01
1209021429
6578
47
SPEED QUEEN
LWNA11SP111TW01
1209021430
6578
48
SPEED QUEEN
LWNA11SP111TW01
1209021431
6578
49
SPEED QUEEN
LWNA11SP111TW01
1209021432
6578
50
SPEED QUEEN
LWNA11SP111TW01
1209021433
6578
51
SPEED QUEEN
LWNA11SP111TW01
1209021434
6578
52
SPEED QUEEN
LWNA11SP111TW01
1209021435
6578
53
SPEED QUEEN
LWNA11SP111TW01
1209021436
6578
54
SPEED QUEEN
LWNA11SP111TW01
1209021437
6578
55
SPEED QUEEN
LWNA11SP111TW01
1209021438
6578
56
SPEED QUEEN
LWNA11SP111TW01
1209021439
6578
57
SPEED QUEEN
LWNA11SP111TW01
1209021440
6578
58
SPEED QUEEN
LWNA11SP111TW01
1209021441
6578
59
SPEED QUEEN
LWNA11SP111TW01
1209021442
6578
60
SPEED QUEEN
LWNA11SP111TW01
1209021443
6578
61
SPEED QUEEN
LWNA11SP111TW01
1209021444
6578
62
SPEED QUEEN
LWNA11SP111TW01
1209021445
6578
63
SPEED QUEEN
LWNA11SP111TW01
1209021446
6578
64
SPEED QUEEN
LWNA11SP111TW01
1209021447
6578
65
SPEED QUEEN
LWNA11SP111TW01
1209021448
6578
66
SPEED QUEEN
LWNA11SP111TW01
1209021449
6578
67
SPEED QUEEN
LWNA11SP111TW01
1209021450
6578
68
SPEED QUEEN
LWNA11SP111TW01
1209021451
6578
69
SPEED QUEEN
LWNA11SP111TW01
1209021452
6578
70
SPEED QUEEN
LWNA11SP111TW01
209021453
6578
71
SPEED QUEEN
LWNA11SP111TW01
209021454
6578
72
SPEED QUEEN
LWNA11SP111TW01
1209021455
6578
73
SPEED QUEEN
LWNA11SP111TW01
1304000723
6586
74
SPEED QUEEN
LWNA11SP111TW01
1304000724
6586
75
SPEED QUEEN
LWNA11SP111TW01
1304000725
6586
76
SPEED QUEEN
LWNA11SP111TW01
1304000726
6586
77
SPEED QUEEN
LWNA11SP111TW01
1304000727
6586
78
SPEED QUEEN
LWNA11SP111TW01
1304000728
6586
79
SPEED QUEEN
LWNA11SP111TW01
1304000729
6586
80
SPEED QUEEN
LWNA11SP111TW01
1304000730
6586
81
SPEED QUEEN
LWNA11SP111TW01
1304000731
6586
82
SPEED QUEEN
LWNA11SP111TW01
1304000732
6586
83
SPEED QUEEN
LWNA11SP111TW01
1304000733
6586
84
SPEED QUEEN
LWNA11SP111TW01
1304000734
6586
85
SPEED QUEEN
LWNA11SP111TW01
1304000735
6586
86
SPEED QUEEN
LWNA11SP111TW01
1304000736
6586
87
SPEED QUEEN
LWNA11SP111TW01
1304000737
6586
88
SPEED QUEEN
LWNA11SP111TW01
1304000738
6586
89
SPEED QUEEN
LWNA11SP111TW01
1304000739
6586
90
SPEED QUEEN
LWNA11SP111TW01
1304000740
6586
91
SPEED QUEEN
LWNA11SP111TW01
1304000741
6586
92
SPEED QUEEN
LWNA11SP111TW01
1304000742
6586
93
SPEED QUEEN
LWNA11SP111TW01
1304000743
6586
94
SPEED QUEEN
LWNA11SP111TW01
1304000744
6586
95
SPEED QUEEN
LWNA11SP111TW01
1304000745
6586
96
SPEED QUEEN
LWNA11SP111TW01
1304000746
6586
97
SPEED QUEEN
LWNA11SP111TW01
1304000747
6586
98
SPEED QUEEN
LWNA11SP111TW01
1304000748
6586
99
SPEED QUEEN
LWNA11SP111TW01
1304000749
6586
100
SPEED QUEEN
LWNA11SP111TW01
1304000750
6586
101
SPEED QUEEN
LWNA11SP111TW01
1304000751
6586
102
SPEED QUEEN
LWNA11SP111TW01
1304000752
6586
103
SPEED QUEEN
LWNA11SP111TW01
1304000753
6586
104
SPEED QUEEN
LWNA11SP111TW01
1304000754
6586
105
SPEED QUEEN
LWNA11SP111TW01
1304000755
6586
106
SPEED QUEEN
LWNA11SP111TW01
1304000756
6586
107
SPEED QUEEN
LWNA11SP111TW01
1304000757
6586
108
SPEED QUEEN
LWNA11SP111TW01
1304000758
6586
109
SPEED QUEEN
LWNA11SP111TW01
1304000759
6586
110
SPEED QUEEN
LWNA11SP111TW01
1304000760
6586
111
SPEED QUEEN
LWNA11SP111TW01
1304000761
6586
112
SPEED QUEEN
LWNA11SP111TW01
1304000762
6586
113
SPEED QUEEN
LWNA11SP111TW01
1304000763
6586
114
SPEED QUEEN
LWNA11SP111TW01
1304000764
6586
115
SPEED QUEEN
LWNA11SP111TW01
1304000765
6586
116
SPEED QUEEN
LWNA11SP111TW01
1304000766
6586
117
SPEED QUEEN
LWNA11SP111TW01
1304000767
6586
118
SPEED QUEEN
LWNA11SP111TW01
1304000768
6586
119
SPEED QUEEN
LWNA11SP111TW01
1304000769
6586
120
SPEED QUEEN
LWNA11SP111TW01
1304000770
6586
121
SPEED QUEEN
LWNA11SP111TW01
1304000771
6586
122
SPEED QUEEN
LWNA11SP111TW01
1304000772
6586
123
SPEED QUEEN
LWNA11SP111TW01
1304000773
6586
124
SPEED QUEEN
LWNA11SP111TW01
1304000774
6586
125
SPEED QUEEN
LWNA11SP111TW01
1304000775
6586
126
SPEED QUEEN
LWNA11SP111TW01
1304000776
6586
127
SPEED QUEEN
LWNA11SP111TW01
1304000777
6586
128
SPEED QUEEN
LWNA11SP111TW01
1304000778
6586
129
SPEED QUEEN
LWNA11SP111TW01
1304000779
6586
130
SPEED QUEEN
LWNA11SP111TW01
1304000780
6586
131
SPEED QUEEN
LWNA11SP111TW01
1304000781
6586
132
SPEED QUEEN
LWNA11SP111TW01
1304000782
6586
133
SPEED QUEEN
LWNA11SP111TW01
1304000783
6586
134
SPEED QUEEN
LWNA11SP111TW01
1304000784
6586
135
SPEED QUEEN
LWNA11SP111TW01
1304000785
6586
136
SPEED QUEEN
LWNA11SP111TW01
1304000786
6586
137
SPEED QUEEN
LWNA11SP111TW01
1304000787
6586
138
SPEED QUEEN
LWNA11SP111TW01
1304000788
6586
139
SPEED QUEEN
LWNA11SP111TW01
1304000789
6586
140
SPEED QUEEN
LWNA11SP111TW01
1304000790
6586
141
SPEED QUEEN
LWNA11SP111TW01
1304000791
6586
142
SPEED QUEEN
LWNA11SP111TW01
1304000792
6586
143
SPEED QUEEN
LWNA11SP111TW01
1304000793
6586
144
SPEED QUEEN
LWNA11SP111TW01
1304000794
6586

GFE DRYERS

MANUFACTURER
MODEL
SERIAL NUMBER
BUILDING NUMBER
1
SPEED QUEEN
KES17AWF1500
1209015137
6578
2
SPEED QUEEN
KES17AWF1500
1209015138
6578
3
SPEED QUEEN
KES17AWF1500
1209015139
6578
4
SPEED QUEEN
KES17AWF1500
1209015140
6578
5
SPEED QUEEN
KES17AWF1500
1209015141
6578
6
SPEED QUEEN
KES17AWF1500
1209015142
6578
7
SPEED QUEEN
KES17AWF1500
1209015143
6578
8
SPEED QUEEN
KES17AWF1500
1209015144
6578
9
SPEED QUEEN
KES17AWF1500
1209015145
6578
10
SPEED QUEEN
KES17AWF1500
1209015146
6578
11
SPEED QUEEN
KES17AWF1500
1209015147
6578
12
SPEED QUEEN
KES17AWF1500
1209015148
6578
13
SPEED QUEEN
KES17AWF1500
1209015149
6578
14
SPEED QUEEN
KES17AWF1500
1209015150
6578
15
SPEED QUEEN
KES17AWF1500
1209015151
6578
16
SPEED QUEEN
KES17AWF1500
1209015152
6578
17
SPEED QUEEN
KES17AWF1500
1209015153
6578
18
SPEED QUEEN
KES17AWF1500
1209015154
6578
19
SPEED QUEEN
KES17AWF1500
1209015155
6578
20
SPEED QUEEN
KES17AWF1500
1209015156
6578
21
SPEED QUEEN
KES17AWF1500
1209015157
6578
22
SPEED QUEEN
KES17AWF1500
1209024540
6578
23
SPEED QUEEN
KES17AWF1500
1209024541
6578
24
SPEED QUEEN
KES17AWF1500
1209024542
6578
25
SPEED QUEEN
KES17AWF1500
1209024543
6578
26
SPEED QUEEN
KES17AWF1500
1209024544
6578
27
SPEED QUEEN
KES17AWF1500
1209024545
6578
28
SPEED QUEEN
KES17AWF1500
1209024546
6578
29
SPEED QUEEN
KES17AWF1500
1209024547
6578
30
SPEED QUEEN
KES17AWF1500
1209024548
6578
31
SPEED QUEEN
KES17AWF1500
1209024549
6578
32
SPEED QUEEN
KES17AWF1500
1209024550
6578
33
SPEED QUEEN
KES17AWF1500
1209024551
6578
34
SPEED QUEEN
KES17AWF1500
1209024552
6578
35
SPEED QUEEN
KES17AWF1500
1209024553
6578
36
SPEED QUEEN
KES17AWF1500
1209024554
6578
37
SPEED QUEEN
KES17AWF1500
1209024555
6578
38
SPEED QUEEN
KES17AWF1500
1209024556
6578
39
SPEED QUEEN
KES17AWF1500
1209024557
6578
40
SPEED QUEEN
KES17AWF1500
1209024558
6578
41
SPEED QUEEN
KES17AWF1500
1209024559
6578
42
SPEED QUEEN
KES17AWF1500
1209024560
6578
43
SPEED QUEEN
KES17AWF1500
1210005565
6578
44
SPEED QUEEN
KES17AWF1500
1210005566
6578
45
SPEED QUEEN
KES17AWF1500
1210005567
6578
46
SPEED QUEEN
KES17AWF1500
1210005568
6578
47
SPEED QUEEN
KES17AWF1500
1210005569
6578
48
SPEED QUEEN
KES17AWF1500
1210005570
6578
49
SPEED QUEEN
KES17AWF1500
1304001844
6586
50
SPEED QUEEN
KES17AWF1500
1304001845
6586
51
SPEED QUEEN
KES17AWF1500
1304001846
6586
52
SPEED QUEEN
KES17AWF1500
1304001847
6586
53
SPEED QUEEN
KES17AWF1500
1304001848
6586
54
SPEED QUEEN
KES17AWF1500
1304001849
6586
55
SPEED QUEEN
KES17AWF1500
1304001850
6586
56
SPEED QUEEN
KES17AWF1500
1304001851
6586
57
SPEED QUEEN
KES17AWF1500
1304001852
6586
58
SPEED QUEEN
KES17AWF1500
1304001853
6586
59
SPEED QUEEN
KES17AWF1500
1304001854
6586
60
SPEED QUEEN
KES17AWF1500
1304001855
6586
61
SPEED QUEEN
KES17AWF1500
1304001856
6586
62
SPEED QUEEN
KES17AWF1500
1304001857
6586
63
SPEED QUEEN
KES17AWF1500
1304001858
6586
64
SPEED QUEEN
KES17AWF1500
1304001859
6586
65
SPEED QUEEN
KES17AWF1500
1304001860
6586
66
SPEED QUEEN
KES17AWF1500
1304001861
6586
67
SPEED QUEEN
KES17AWF1500
1304001862
6586
68
SPEED QUEEN
KES17AWF1500
1304001863
6586
69
SPEED QUEEN
KES17AWF1500
1304001864
6586
70
SPEED QUEEN
KES17AWF1500
1304001865
6586
71
SPEED QUEEN
KES17AWF1500
1304001866
6586
72
SPEED QUEEN
KES17AWF1500
1304001867
6586
73
SPEED QUEEN
KES17AWF1500
1304001868
6586
74
SPEED QUEEN
KES17AWF1500
1304001869
6586
75
SPEED QUEEN
KES17AWF1500
1304001870
6586
76
SPEED QUEEN
KES17AWF1500
1304001871
6586
77
SPEED QUEEN
KES17AWF1500
1304001872
6586
78
SPEED QUEEN

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .