Quote_Schedule_-_Boiler_Inspections_(REQUIRED)_2.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Hanscom AFB Boiler Inspection Service Contract Federal contract opportunity
Solicitation number
F2B3AQ6182A017
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

QUOTE SCHEDULE - AMENDED 2

View the file

Other files for this federal contract opportunity

Other files attached to Hanscom AFB Boiler Inspection Service Contract, newest first.
File Type Posted
Boilers_Q A_FINAL.pdf PDF
Combined_Synopsis_Solicitation_-_Boiler_Inspections_AMENDED_2.pdf PDF
PWS_Boiler_Inspections_2016_-_AMENDED_2.pdf PDF
BOILERS_REFERENCE_AMENDED_2.pdf PDF
Combined_Synopsis_Solicitation_-_Boiler_Inspections_AMENDED.pdf PDF
Combined_Synopsis_Solicitation_-_Boiler_Inspections.pdf PDF
PWS_Boiler_Inspections_2016.pdf PDF
WDOL_BOILERS.pdf PDF
Bid_Schedule_-_Boiler_Inspections_(REQUIRED).xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QUOTE SCHEDULE FOR BOILER INSPECTIONS
*****COMPLETION OF THIS DOCUMENT IS REQUIRED*****
CLINBASE YEAR POP: 18 SEP 2016 TO 17 SEP 2017QTYUNITPRICETOTAL
0001Inspection of Boilers #1 and #2 and all associated elements.1EA$0.00$0.00
0002Inspection of Boilers #3 and #4 and all associated elements.1EA$0.00$0.00
0003Test/Calibrate Safety Valves29EA$0.00$0.00
BASE YEAR TOTAL$0.00
CLINOPTION YEAR 1 POP: 18 SEP 2017 TO 17 SEP 2018QTYUNITPRICETOTAL
1001Inspection of Boilers #1 and #2 and all associated elements.1EA$0.00$0.00
1002Inspection of Boilers #3 and #4 and all associated elements.1EA$0.00$0.00
1003Test/Calibrate Safety Valves29EA$0.00$0.00
OPTION YEAR 1 TOTAL$0.00
CLINOPTION YEAR 2 POP: 18 SEP 2018 TO 17 SEP 2019QTYUNITPRICETOTAL
2001Inspection of Boilers #1 and #2 and all associated elements.1EA$0.00$0.00
2002Inspection of Boilers #3 and #4 and all associated elements.1EA$0.00$0.00
2003Test/Calibrate Safety Valves29EA$0.00$0.00
OPTION YEAR 2 TOTAL$0.00
CLINOPTION YEAR 3 POP: 18 SEP 2019 TO 17 SEP 2020QTYUNITPRICETOTAL
3001Inspection of Boilers #1 and #2 and all associated elements.1EA$0.00$0.00
3002Inspection of Boilers #3 and #4 and all associated elements.1EA$0.00$0.00
3003Test/Calibrate Safety Valves29EA$0.00$0.00
OPTION YEAR 3 TOTAL$0.00
CLINOPTION YEAR 4 POP: 18 SEP 2020 TO 17 SEP 2021QTYUNITPRICETOTAL
4001Inspection of Boilers #1 and #2 and all associated elements.1EA$0.00$0.00
4002Inspection of Boilers #3 and #4 and all associated elements.1EA$0.00$0.00
4003Test/Calibrate Safety Valves29EA$0.00$0.00
OPTION YEAR 4 TOTAL$0.00

CONTRACT TOTAL VALUE $0.00

NOTE: To be considered for award, a quote shall comply fully and completely with the following:

This Quote Schedule shall be completed and submitted by the Vendor with a Cover Letter.

This document is the only place where any and all Vendor pricing data shall appear.

All Vendor costs associated with a particular CLIN shall be included in the Unit Price of that CLIN.

No variable, contingent, shipping or extraneous costs or fees shall be considered as part of any Final Bid.

No additional CLINs shall be added by a Vendor to this document.

No modifications of any kind shall be made by a Vendor to this document.

File details come from the government source that posted it. Updated .