Q A__2.pdf

PDF 175 KB Posted

Attached to
7 Garage Doors Removal and Installation Federal contract opportunity
Solicitation number
F1Y3CA5099AW03
Issued by
Department of the Air Force Global Strike Command

About this file

Question and Answer Session 2

View the file

Other files for this federal contract opportunity

Other files attached to 7 Garage Doors Removal and Installation, newest first.
File Type Posted
Clarification_for_Q A.pdf PDF
Attachment_4-_SOW__19_Aug_2015.docx DOCX document
Attachment_3_-_F1Y3CA5099AW03_-_QA__1.docx DOCX document
Attachment_6_-_Site_Visit_Photos.pptx PPTX presentation
Attachment_5_-_SOW_Attch_1_Building_1270_Map.pdf PDF
SITE_VISIT_INFORMATION.pdf PDF
Attachment_2-_SOW__06_Aug_2015.pdf PDF
Attachment_1-_RFQ-_Price_Quote.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1. Attached is Bldg. 1270 floor plan, he has inserted RED LETTER note on the floor plan: 6 of the 7 existing overhead door operators may be 480 volt.

Are they?

Answer 1. All doors should be installed using 110v single phase.

Question 2 (previous question): Should the quote include new control buttons, new wiring, and new conduit? Note: new control buttons can be provided and installed using existing conduit and wiring.

Answer 2. Yes, the quote includes new control buttons, new wiring, and new conduit.

Question 3 (previous question). Should each new overhead door operator re-use existing supply wiring/conduit/circuit breaker? If "No", should the quote include new circuit breaker, conduit, and wiring

Answer 3. Yes, the quote includes new wiring, conduit, and circuit breakers.