Q A__2.pdf
PDF 175 KB Posted
- Attached to
- 7 Garage Doors Removal and Installation Federal contract opportunity
- Solicitation number
- F1Y3CA5099AW03
About this file
Question and Answer Session 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Clarification_for_Q A.pdf | ||
| Attachment_4-_SOW__19_Aug_2015.docx | DOCX document | |
| Attachment_3_-_F1Y3CA5099AW03_-_QA__1.docx | DOCX document | |
| Attachment_6_-_Site_Visit_Photos.pptx | PPTX presentation | |
| Attachment_5_-_SOW_Attch_1_Building_1270_Map.pdf | ||
| SITE_VISIT_INFORMATION.pdf | ||
| Attachment_2-_SOW__06_Aug_2015.pdf | ||
| Attachment_1-_RFQ-_Price_Quote.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1. Attached is Bldg. 1270 floor plan, he has inserted RED LETTER note on the floor plan: 6 of the 7 existing overhead door operators may be 480 volt.
Are they?
Answer 1. All doors should be installed using 110v single phase.
Question 2 (previous question): Should the quote include new control buttons, new wiring, and new conduit? Note: new control buttons can be provided and installed using existing conduit and wiring.
Answer 2. Yes, the quote includes new control buttons, new wiring, and new conduit.
Question 3 (previous question). Should each new overhead door operator re-use existing supply wiring/conduit/circuit breaker? If "No", should the quote include new circuit breaker, conduit, and wiring
Answer 3. Yes, the quote includes new wiring, conduit, and circuit breakers.