05_Project_Submittal_List_Baca_FP_Proj.pdf
PDF 19 KB Posted
- Attached to
- BACA FISH PASSAGE WATER CONTROL STRUCTURES Federal contract opportunity
- Solicitation number
- F17PS00757
About this file
Project submittal list
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| wage_rates.pdf | ||
| 08_COMBINED_SPECS.pdf | ||
| Sol_F17PS00757.pdf | ||
| 06_Bid_Schedule_-_Baca_FP_Proj.pdf | ||
| sf_1442_.pdf | ||
| Instruction_to_Offerors.doc | DOC document | |
| 09_Combined_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME: Crestone Creek Ditch 9 Fish Passage Projects ENGR. PROJECT 17-014 LOCATION: Ditch 9 Culvert 9.5 & In-Channel Structures CONTRACT NO.:
CONTRACTOR: SHEET NO.: 1 OF: 1
Spec.
Section Number
Spec.
Paragraph
No.
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
Contractor's Submittal Number
Date Submitted
Action Taken
Date Resubmitted
Action Taken Comments
012900 1.2 Schedule of Values 001 013200 1.2 Construction Schedule 002 013300 1.3 Submital Schedule 003 015000 1.3 Erosion & Sedimentation Control Plan 004 055000 1.03 Shop Drawings for Metal Fabrications 005 055000 1.03 Product Data for Metal Fabrications 006 312000 2.1 Product Data and Gradation: Engineered Fill 007 312000 3.7 Moisture-Density and Gradation Soil Tests 008 312000 3.8 Compaction Tests 009 312319 1.3 Water Control (Dewatering) Plan 010 313700 1.0 Product Data and Gradation: Riprap 011 313700 1.0 Product Data and Gradation: Stream Material 012 334213 1.02 Product Data Pipe Arch Culvert 013
Submittal Codes: A - Approved B - Approved, except as noted. Resubmittal not required C - Approved, except as noted. Resubmission Required. D - No Action taken. See comments. Resubmission required.
E - Disapproved. See comments. Resubmission Required.
PROJECT SUBMITTAL LIST
Ditch-9 CR 9.5