Submittal_List.pdf

PDF 18 KB Posted

Attached to
REPLACE FISH BARRIER Federal contract opportunity
Solicitation number
F16PS01022
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

Submittal List

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE FISH BARRIER, newest first.
File Type Posted
Sol_F16PS01022_Amd_000002.pdf PDF
Sol_F16PS01022_Amd_000001.pdf PDF
Past_Performance_Questionnaire.doc DOC document
Sol_F16PS01022.pdf PDF
Wage_Rates_MT160033_Building.pdf PDF
Specifications.pdf PDF
6F-MT-395-16-025_all.pdf PDF
Notice_to_Offerors.pdf PDF
Creston_Fish_Barrier_SOW_16-025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NO.: 1 OF: 1

Spec.

Section Number

Spec.

Paragraph No.

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

Contractor's Submittal Number

Date Submitted

Action Taken

Date Resubmitted

Action Taken

Statement of Work V.A

Manufacturers product data, motor data, and shop drawings for traveling fish screen

Statement of Work V.A

Manufacturers product data and shop drawings for sluice trough.

Statement of Work V.B

Manufacturers product data, pump curve, motor data, and shop drawings for pump.

Statement of Work V.B Product data for pipe, valves, and fittings.

Statement of Work

III.A.4 and

III.A.5

Product data for neoprene bearing strip, stainless steel angles, epoxy anchors, nuts, and washers.

Statement of Work III.C.2 Shop drawing of fabricated pump mounting platform.

Statement of Work III.D.3

Product information on the major components of the control panel.

Statement of Work III.D.3 Shop drawing of control panel.

'013200 1.3.A Project Schedule 017700 1.2.A As-built drawings '017700 1.2.B Operations and Maintenance Manuals

'017700 1.7.A Written warranties on all warranted equipment and material.

0260519 2.1 Product data on cables '0260519 2.2 Product data on cable splices

Replacement of Fish Barrier Creston National Fish Hatcher

PROJECT SUBMITTAL LIST

C - Approved, except as noted. Resubmission Required.

PROJECT NAME:

LOCATION: CONTRACT NO.:

ENGR. PROJECT NO.:

CONTRACTOR:

Comments

16-025

E - Disapproved. See comments. Resubmission Required.

D - No Action taken. See comments. Resubmission required.

B - Approved, except as noted. Resubmittal not requiredSubmittal Codes: A - Approved

Sheet1

File details come from the government source that posted it. Updated .