Submittal_List.pdf
PDF 18 KB Posted
- Attached to
- REPLACE FISH BARRIER Federal contract opportunity
- Solicitation number
- F16PS01022
About this file
Submittal List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_F16PS01022_Amd_000002.pdf | ||
| Sol_F16PS01022_Amd_000001.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| Sol_F16PS01022.pdf | ||
| Wage_Rates_MT160033_Building.pdf | ||
| Specifications.pdf | ||
| 6F-MT-395-16-025_all.pdf | ||
| Notice_to_Offerors.pdf | ||
| Creston_Fish_Barrier_SOW_16-025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NO.: 1 OF: 1
Spec.
Section Number
Spec.
Paragraph No.
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
Contractor's Submittal Number
Date Submitted
Action Taken
Date Resubmitted
Action Taken
Statement of Work V.A
Manufacturers product data, motor data, and shop drawings for traveling fish screen
Statement of Work V.A
Manufacturers product data and shop drawings for sluice trough.
Statement of Work V.B
Manufacturers product data, pump curve, motor data, and shop drawings for pump.
Statement of Work V.B Product data for pipe, valves, and fittings.
Statement of Work
III.A.4 and
III.A.5
Product data for neoprene bearing strip, stainless steel angles, epoxy anchors, nuts, and washers.
Statement of Work III.C.2 Shop drawing of fabricated pump mounting platform.
Statement of Work III.D.3
Product information on the major components of the control panel.
Statement of Work III.D.3 Shop drawing of control panel.
'013200 1.3.A Project Schedule 017700 1.2.A As-built drawings '017700 1.2.B Operations and Maintenance Manuals
'017700 1.7.A Written warranties on all warranted equipment and material.
0260519 2.1 Product data on cables '0260519 2.2 Product data on cable splices
Replacement of Fish Barrier Creston National Fish Hatcher
PROJECT SUBMITTAL LIST
C - Approved, except as noted. Resubmission Required.
PROJECT NAME:
LOCATION: CONTRACT NO.:
ENGR. PROJECT NO.:
CONTRACTOR:
Comments
16-025
E - Disapproved. See comments. Resubmission Required.
D - No Action taken. See comments. Resubmission required.
B - Approved, except as noted. Resubmittal not requiredSubmittal Codes: A - Approved