Exhibit X is a project description document prepared by Ryan Teves on May 29, 2026, for the UPRR Closure Structure project (City Work Order #41175) managed by the West Sacramento Area Flood Control Agency (WSAFCA) in California. The document contains two exhibits outlining the scope of engineering assessment work required. Exhibit 1 addresses the closure of existing cutoff walls, identifying a gap between Station 55+44 and Station 57+08, and requires evaluation of through seepage with a minimum of two design alternatives. Exhibit 2 requires a preliminary scour and erosion assessment of the UPRR Window, including analysis of the I-Street bridge cross-section at design flow conditions, with specific focus on bank toe and levee toe locations to assess potential levee embankment and foundation risks.

The document serves as a technical exhibit supporting WSAFCA's Request for Proposal for professional architectural and engineering services related to the UPRR Closure Structure. No specific pricing terms, contract duration, award dates, site visit requirements, or bidder conference information are contained within this exhibit. The work requires qualified engineering firms or individuals to submit proposals in accordance with WSAFCA's RFP terms and contracting procedures, with the selected contractor responsible for delivering the seepage evaluation, scour assessment, and erosion analysis as described in the project exhibits.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ryant Rectangle ryant Line ryant Line ryant Line ryant Line ryant Line ryant Line ryant Text Box

PROJECT DESCRIPTION:

Figure shows the extent of the existing cutoff walls with a gap between Station 55+44 and Station 57+08. Evaluation must be conducted for through seepage with a minimum of two alternatives.

ryant Text Box

EXHIBIT 1

ryant Text Box

SHEET NO. 1 OF 2

ryant Text Box

SCALE: NA

ryant Text Box

DATE PREPARED:

May 29, 2026 ryant Text Box

PREPARED BY:

RYAN TEVES

ryant Text Box

REVIEWED BY:

ryant Text Box

PROJECT TITLE:

UPRR Structure Closure ryant Line ryant Rectangle ryant Image ryant Text Box FILE NAME: Exhibit X ryant Text Box

CITY WO #

41175

Image

Rectangle ryant Line ryant Line ryant Line ryant Line ryant Line ryant Line ryant Text Box

PROJECT DESCRIPTION:

Scour and Erosion Assessment of the UPRR Window: A preliminary scour and erosion assessment for the project area. Figure shows the cross section at the existing I-Street bridge, and maximum velocity pattern at the design flow condition. Note the cross-section plot shows the bank toe and levee toe. Scour and erosion must be conducted with respect to both locations to assess levee embankment and foundation risk.

ryant Text Box

EXHIBIT 2

ryant Text Box

SHEET NO. 2 OF 2

ryant Text Box

SCALE: NA

ryant Text Box

DATE PREPARED:

May 29, 2026 ryant Text Box

PREPARED BY:

RYAN TEVES

ryant Text Box

REVIEWED BY:

ryant Text Box

PROJECT TITLE:

UPRR Closure Structure ryant Line ryant Rectangle ryant Image ryant Text Box FILE NAME: Exhibit X ryant Text Box

CITY WO #

41175

Image

File details come from the government source that posted it. Updated .