Exhibit F Plans and Equipment Layout~1.pdf

PDF 825 KB Posted

Attached to
Research Pile Driving and Testing State and local contract opportunity
Solicitation number
S-73000-00011382
Issued by
Jackson County, Oregon

About this file

This document is an equipment footprint and layout exhibit for the SPR879 Buck Creek Bridge project, involving drilling and pile driving field tests planned for Fiscal Year 2025. The exhibit details equipment staging, placement, and spatial requirements for pile installation, load testing, and subsurface exploration activities. The preferred setup involves using one lane of traffic closure and utilizing the road shoulder for equipment positioning, with specific color-coded layouts showing placement of items such as pile driving crane, rig, staging areas, support trucks, worker tent, and exploration zones.

The document provides detailed dimensional assumptions for various equipment, including length and width measurements for items like pile driving crane, CPT truck, mud rotary drill rig, and support vehicles. The layouts are based on previous construction experiences, specifically referencing Buck Creek construction from 2017, which demonstrated that the road shoulder is flat and can accommodate equipment staging. A reference layout from Bica et al. (2012) indicates that only one instrumented test pile and four reaction piles will be installed, with specific positioning and spacing guidelines for various pile types including closed-ended pipe piles, H piles, and extra piles.

View the file

Other files for this state and local contract opportunity

Other files attached to Research Pile Driving and Testing, newest first.
File Type Posted
Addendum.1~2.docx DOCX document
Bid.Cover.Sheet~2.docx DOCX document
Exibit G Site Photos~1.pdf PDF
00011382 Preliminary Results.xlsx XLSX spreadsheet
Sample.Contract~2.docx DOCX document
Bid.Pricing.Form~4.xlsx XLSX spreadsheet
Exhibit A Scope of Work Technical Specifications~1.docx DOCX document
Invitation.To.Bid.Services.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment footprint assumptions

Pile Installation and Load Testing: Buck Creek Bridge (preferred setup)

Pile Staging

Pile Frame

Pile Rig

Supp Truck

Supp Car

NOTE: Subsurface explorations (drilling, CPT) will be located within or immediately adjacent to the pile frame footprint.

Potential Exploration outline

Drilling and Cone Penetration Test Buck Creek (preferred setup)

Tent

Rods

Drill/CPT Rig

Supp Truck

Supp Car

NOTE: Subsurface explorations (drilling, CPT) will be located within or immediately adjacent to the pile frame footprint.

Potential Exploration outline

Mud pit

Equipment footprint assumptions

- Pile load testing at Buck Creek should be feasible with one lane of traffic closed

- Staging and construction will need to use the road shoulder

From Buck Creek construction

Pictures from Buck Creek construction in 2017 The road shoulder in the background is flat and should have allowable space for equipment and staging.

From Bica et al. 2012

Only One instrumented test pile and four reaction piles will be installed.

However, reference layout for pile test instrumentation and frame dimensions is below for reference:

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6