EXHIBIT D - Proposal Form.docx

DOCX document 50 KB Posted

Attached to
Construction - Multiple Award Task Order Contract (MATOC) Arkansas National Guard Federal contract opportunity
Solicitation number
W912JF23R0001
Issued by
Department of the Army Arkansas Army National Guard

About this file

This document contains a federal contract opportunity exhibit and related prototypical task order for building renovations. The exhibit outlines requirements for renovating Building 55 at an Arkansas National Guard installation, including demolishing and replacing existing building components. The work is estimated to cost between $250,000 and $500,000 and have a 180-day period of performance. The related task order solicitation is for a Multiple Award Task Order Contract to provide maintenance, repair, and construction services at Arkansas National Guard facilities. The total program capacity is $40 million over a potential five-year ordering period. The solicitation will result in at least four awards to small businesses as a total set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to Construction - Multiple Award Task Order Contract (MATOC) Arkansas National Guard, newest first.
File Type Posted
W912JF23R0001-0002.pdf PDF
QandA_Doc_W912JF23R0001_30DEC2022.pdf PDF
EXHIBIT_D_Proposal_Form_30DEC2022.docx DOCX document
AMENDMENT W912JF23R0001 0001.pdf PDF
W912JF23R0001 MATOC SOLICITATION.pdf PDF
EXHIBIT A - Performance Relevancy Questionnaire.docx DOCX document
Attachment 01 PROTOTYPICAL PROJECT PLANS_ARKANSAS ANG MATOC_05MAY2022.pdf PDF
Attachment 01 - SPECIAL CONTRACT REQUIREMENTS.docx DOCX document
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
EXHIBIT C - Reference Questionnaire Package.docx DOCX document
Attachment 01 PROTOTYPICAL PROJECT SPECIFICATIONS_ARKANSAS ANG MATOC_05MAY2022.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: W912JF-23-R-0001

EXHIBIT D – PROTOTYPICAL PROJECT INFORMATION AND PRICING

W912JF-23-R-0001

29-NOV-2022

*No task order award will be made as a result of this Exhibit – this is for MATOC evaluation purposes only.*

PROJECT TITLE: AR ANG MATOC PROTOTYPICAL PROJECT – BLDG 55 RENOVATIONS

PROJECT DESCRIPTION: The intent of this project is to renovate Bldg 55 to improve the building envelope and address all current repair requirements. Significant work items include: demolition of existing built up roof, demolition of existing windows, demolition of existing doors and door frames, demolition of obsolete communications wiring and equipment, demolition of door canopies, demolition of concrete steps, replacement of existing windows, replacement of existing built-up roof, replacement of existing exterior hollow metal doors, installation of new door canopies, infill framing, replacement of any damaged framing lumber encountered during construction, stucco patching repair and repainting the entire stucco exterior. Additionally, the project includes bid options for installation of louvered aluminum sunshades over the first and second story windows. All work shall be accomplished in accordance with all applicable installation, state and federal policy and regulations. All work to be warrantied for one year after the government takes beneficial occupancy.

NAICS CODE: 236220

MAGNITUDE OF PROJECT:

☐$25,000 - $100,000 ☐$100,000 - $250,000 ☐$250,000 - $500,000 ☒$500,000 - $1,000,000 ☐$1,000,000 - $5,000,000

☒ FAR 52.232-18 Availability of Funds. Funds are not presently available for this procurement. This is a prototypical project and will not result in a task order award.

PERFORMANCE PERIOD: 180 Days, after receipt of Notice to Proceed

All terms and conditions of the Basic Contract are incorporated in the resulting task order by reference unless otherwise stated.

PART I - PROVISIONS

A Bid Bond is required for all solicitations estimated over $150,000.

☐ Bid Guarantee (Sep 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3M, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

The Following Provisions if marked [X] are applicable to this task order solicitation

☐ DFARS 252.236-7006 Cost Limitation (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

PART II - CLAUSES

All work shall be in strict accordance with the:

☒Plans/Drawings and Specifications dated 12-June-2012

☐Statement of Work (SOW), Technical Provisions & Drawings [INSERT TITLE] dated [INSERT DATE] and Basic Contract Section 00800 Special Contract Provisions and Master General Requirements and Contract Master Specifications

☐Statement of Work (SOW) [INSERT TITLE] dated [INSERT DATE] and Basic Contract Section 00800 Special Contract Provisions and Master General Requirements and Master Specifications

☐Statement of Work (SOW)/Plans and Specifications will be provided under separate cover at or before the Site Visit

PERFORMANCE & PAYMENT BONDS: In accordance with FAR Clause 52.228-15 Performance and Payment Bonds-Construction, Offerors are reminded that any amount awarded over $35,000 shall require Payment Bonds and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

WAGE DETERMINATION: Currently, General Decision Number AR20220034 Modification No. 01 dated 25FEB2022 for Sebastian is applicable to this task order. Rates can be found at https://beta.sam.gov/search?index=wd. However, the current prevailing Wage Determination will be incorporated at the time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all Offerors that have not been eliminated from the competition. If applicable, these Offerors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not constitute as discussions if award without discussions is contemplated.

For the purposes of this offering, it is implied that, that any and all parties agree to a Criminal History Background Check once entered into any contract/task order. Any documents that are provided and found fraudulent to include, but not limited to driver’s licenses, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 To access the manual use the link below http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx

The Following Provisions/Clauses if marked [X] are applicable to this task order solicitation and resulting task order

☐ FAR 52.246-21 Warranty of Construction is applicable.

☐ FAR 52.211-12 Liquidated Damages. The following liquidated damages daily rate is applicable to this project:

☒ FAR 52.236-14 Availability and Use of Utility Services The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense IAW the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14). The following utilities will be available: Water and Electricity.

☐ DFARS 252.236-7006 Cost Limitation (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

☒ AT/OPSEC Information from the Contract Requirements Package

1. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1a. For Contractors Requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Air Force Directive 31-101. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

1b. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

2. Advanced Distributed Learning Service (ADLS). All contractor employees and associated sub-contractor employees assigned to work on a government site and/or requiring access to a DoD network will be required to register with ADLS at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD Information Assurance, OPSEC, Security Administration). ADLS website: https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp

3. For Contracts that require Handling or Access to Classified Information. For contracts that require handling or access to classified information, the contractor shall comply with FAR Clause 52.204-2, Security Requirements, including the National Industrial Security Program Operating Manual (DoD 5220.22-M) and applicable updates/changes. This clause involves access to information classified “Confidential/Secret/Top Secret” and requires contractors to comply with a Visitor Group Security Agreement (VGSA) with all contractor operations located on Air Force/Air National Guard installations in accordance with this PWS. Contract personnel must be entered in the Joint Personnel Adjudication System (JPAS) and vendor will comply with paragraph 1.6h above. A DD 254, DoD Contract Security Classification Specification, is required for all classified contracts. Completion of the Security Administration CBT on ADLS is required.

4. AT Level I Training. This standard language is for contractor employees with an area of performance within an Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil

5. AT Awareness Training for Contractor Personnel Traveling Overseas. US based contractor employees and associated sub-contractor employees will be made available and receive government provided area of responsibility (AOR) specific AT awareness training as directed by AFI 10-245. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact. (Item 9 below will apply)

6. For contracts that require an OPSEC Plan. The contractor shall develop an OPSEC Plan and provide it to the COR or KO within XX calendar days of contract award to be reviewed and approved by the responsible Government OPSEC officer, per AFI 10-701, Operations Security. This Plan shall include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. For the contractor to effectively comply with OPSEC provisions of the contract, the organization will provide the following guidance: (1) Organization’s Critical Information; (2) Adversaries’ collection threat information as it applies to the organization’s mission and the contract; (3) Operations Security guidance; and (4) Specific OPSEC measures the organization requires (as appropriate).

6a. Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/SMO/SMNCOs/Coordinators will provide OPSEC training or training materials to contract employees within 90 days of employees’ initial assignment to the contract and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 – OPSEC Fundamentals) and refresher training (Security Administration) are both available on the ADLS website.

7. For Information Assurance (IA) / Information Technology (IT) Training. All contractor employees and associated sub-contractor employees shall complete the DoD Information Assurance Awareness CyberAwareness Challenge before issuance of network access and annually thereafter. All contractor employees performing services involving IA/IT functions shall comply with DoD and Air Force training requirements in DoDD 8570.01, DoD 8570.01-M and AFPD 33-2 within XX days of the start of contract performance.

8. For Information Assurance (IA) / Information Technology (IT) Certification. In accordance with DoD 8570.01-M , DFARS 252.239.7001 and AFM 33-282, contractor employees performing services supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M shall be completed upon contract award.

9. For Contract Requiring Performance or Delivery in a Foreign Country, DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives.

10. For Contractors Authorized to Accompany the Force. DFARS Clause 252.225-7040, Contractor Personnel Authorized to Accompany U.S. Armed Forces Deployed Outside the United States. The clause shall be used in solicitations and contracts that authorize contractor personnel to accompany US Armed Forces deployed outside the US in contingency operations; humanitarian or peacekeeping operations; or other military operations or exercises, when designated by the combatant commander. The clause discusses the following AT/OPSEC related topics: required compliance with laws and regulations, pre-deployment requirements, required training (per combatant command guidance), and personnel data required.

11. The use and possesion of controlled substances to include marijuana (medicinal or recreational use) on the installation is in violation of Title 10 US Code 912a.Art 112a. Contractors are notified this policy is strictly enforced and violators will be denied entry. Personnel caught on the installation can be prosecuted.

End of clauses/provisions

Point of Contact for this requirement is samuel.bond.1@us.af.mil,

//SIGNED//
Mark C. White
Attachment:Contracting Officer

Proposal Form, Notes and Provision(s)

MATOC PROTOTYPICAL TASK ORDER PROPOSAL FORM

PROJECT NO. NKAK222111

RENOVATE BLDG 55

PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to renovate building 55 in accordance with the task order requirements for Renovate BLDG 55. This project is for a Prototypical Firm Fixed Task Order against a resulting MATOC IDIQ Contract.

*No task order award will be made as a result of this Exhibit – this is for MATOC evaluation purposes only.*

Item Number Description Quantity Unit Amount

0001Project No. NKAK222111
RENOVATE BLDG 551JOB$____________

INSTRUCTION TO OFFERORS ON PROPOSAL PREPARATION AND EVALUATION OF OFFERS

Instructions: Provide a construction schedule in a Gantt chart that shows the complete project schedule for this task order project from notice to proceed, to include all construction activities as well as concurrent activities, and outline the critical path activities that will show successful execution of the construction project within the period of performance requirements outlined in this Exhibit. Also include a narrative discussing the scheduling processes and resource allocation that ensure completion and control of schedule progress from beginning to the end of the project.

Evaluation: The offeror’s proposal shall be evaluated as described in the MATOC Solicitation.

The Government will evaluate the offeror’s ability in scheduling methodology to determine if they have scheduling processes that ensure timely completion and control of the project from beginning to end. The schedule narrative should demonstrate an understanding of the limitations of a schedule as well as an understanding that an appropriate schedule will result in successful completion of projects.

A successful project schedule will provide the Government confidence that the project is structured to be executable for the resources indicated, is task oriented and indicates dates on which milestones will be achieved, and shows a total completion date within the time required by this Exhibit.

The Task Order Project Schedule will be evaluated as part of the Offeror’s Technical Proposal. Price will be evaluated to determine reasonableness of the proposed price. Unreasonable Offers cannot be selected for award. *No task order award will be made as a result of this Exhibit – this is for MATOC evaluation purposes only.*

DETAILED PRICE PROPOSAL

Divisions of the Detailed Offer Spreadsheet must coincide with the Divisions within the specifications dated 12 JUNE 2012 for BLDG 55 RENOVATIONS. Division prices must be split into material/equipment and labor. Include only the materials and labor listed in the Part 1 General and Part 2 Products portions of each Division in the specifications. Prices must include all applicable sales tax, overhead and profit for the requirements of that specification Division.

NOTE TO CONTRACTING: Tailor the below sample table(s) to your specific project, mirroring the IGE, to give you an “apples-to-apples” comparison of prices for the prototypical task order. Price evaluation will be much easier with this information.

CLIN 0001
Description
Materials/

Equipment

Labor
Total
Division 01
General Requirements
$
$
$
Division 03
Concrete
Division 05
Metals
Division 08
Openings
Division 09
Finishes
Division 21
Fire Suppression
Division 23
HVAC
Division 26
Electrical (Lighting & Power)
Division 28
Electronic Safety & Security
Divisions 31-33
Site & Infrastructure
Total Line Item 0001 Offer:
$