EXHIBIT_C_CDRLsA001andA002.pdf

PDF 408 KB Posted

Attached to
Inspection and Survey of the Automatic Fire Explosion/Suppression System Federal contract opportunity
Solicitation number
FA8534-20-Q-0010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Inspection and Survey of the Automatic Fire Explosion/Suppression System, newest first.
File Type Posted
Kidde_AFES_PWS_1_JUNE_2020.pdf PDF
RADBOACT_FireballTest_TestPlanFV20190624_008.pdf PDF
solicitation FA853420Q0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract| PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

C TDP TM OTHER

D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MRAP Cougar CAT I A1, CAT I A2 and CAT II A2 (1 Each)

Kidde Fire Protection Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A002

Technical Report-Study/Services

Agent Concentration and Sensor Stimulation Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B SOW paragraph 4 AFLCMC/WNZ SE&V

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT D ONCE 30 days after testing b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS Samantha.ramey.1 @us.af.mil

Block 4: The report shall document the agent concentration and fireball generation testing methodologies, the number of tests and the various testing scenarios employed during the testing and the results of each test.

Block 12 & 13: The initial submission is due no later than (NLT) 30 days after the end of the agent concentration and sensor stimulation testing. The Government has 10 work days to review and return comments. The Contractor has 5 work days to address/incorporate Government comments.

Block 14: All data being provided by the contractor shall be delivered in

Electronic format as defined in the data item description DI-MISC-80508B in MS Word format.

paul.fauth.ctr@us.a f.mil

15. Total 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Paul Fauth

1 June 2020 11 June 2020

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 1 of 1 Pages

2020-06-11T12:05:34-0400

SOWERS.MICHAEL.RAY.1118959643

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract| PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

c

TDP TM OTHER

D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MRAP Cougar CAT I A1, CAT I A2 and CAT II A2 (1 Each)

Kidde Fire Protection Systems

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A001

Technical Report-Study/Services

Inspection and Survey Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B PWS paragraph 4 AFLCMC/WNZ SE&V

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT

D

ONCE 10 days after testing b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS Samantha.ramey.1 @us.af.mil

Block 4: The Contractor shall document an inspection & survey of the RADBO / RWS vehicle’s interior design, assessing the configuration’s impact on the capabilities of the AFES system to ensure it can extinguish a fire event while ensuring crew safety. The report shall document the inspection and survey results, indicating whether the AFES sensor, nozzle, and fire bottle quantities and locations within the current RADBO / RWS vehicle configuration are sufficient to ensure the safety of the crew, restricts the proper functionality of the AFES system, and satisfies the National Fire Protection Act criteria identified in PWS paragraph 3.5.

The Report shall document any recommendations for changes to the configuration.

Block 12 & 13: The initial submission is due no later than (NLT) 10 days after the end of the inspection and survey. The Government has 5 work days to review and return comments. The Contractor has 5 work days to address and/or incorporate Government comments.

Block 14: All data being provided by the contractor shall be delivered in Electronic format as defined in the data item description DI-MISC-80508B in MS Word format.

paul.fauth.ctr@us.a f.mil

15. Total 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Paul Fauth

1 June 2020

11 June 2020 DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 1 of 1 Pages

2020-06-11T11:58:18-0400

SOWERS.MICHAEL.RAY.1118959643

File details come from the government source that posted it. Updated .