Exhibit_B_Project_list_Eng_&_Ops.pdf
PDF 104 KB Posted
- Attached to
- On-Call Professional Engineering Services State and local contract opportunity
- Solicitation number
- RFP-TH-0128
- Issued by
- Los Angeles County, California
About this file
Exhibit B is a project list document for West Basin Municipal Water District's On-Call Professional Engineering Services contract in California, detailing potential infrastructure projects spanning three years across multiple water recycling and treatment facilities. The projects are organized by location and include work at the Chevron Nitrification Treatment Plant, Edward C. Little Water Recycling Facility, Hyperion Secondary Effluent Pumping Station, Juanita Millender-McDonald Carson Regional Water Recycling Plant, and Torrance Regional Water Recycling Plant, as well as multi-plant and pipeline initiatives. Specific projects encompass distributed control system replacements, bulk chemical storage improvements, membrane filtration systems, reverse osmosis treatment upgrades, pump station rehabilitation, disinfection system improvements, SCADA implementation, and operational support services including pre-qualification testing and performance monitoring across the district's water recycling infrastructure.
The project list serves as a non-exhaustive reference for potential work that may be requested under the on-call services contract, indicating that West Basin anticipates diverse engineering consulting needs across design, rehabilitation, planning, and operational support functions. The scope encompasses civil, mechanical, structural, and process engineering disciplines, with projects addressing water quality improvements, asset management, treatment optimization, and distribution system enhancements. Site addresses for each facility are available directly from West Basin, and the organization positions itself as an internationally recognized expert in water recycling and resource management serving 17 cities and approximately one million residents in the coastal Los Angeles area.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| On-Call_Professional_Engineering_Services.pdf | ||
| Attachment_A_-_Scope_of_Work_and_Services.pdf | ||
| Exhibit_C_Skills.pdf | ||
| Vendor_Information_Request_Form.pdf | ||
| Form_3_-_Pro-Svc_Non-Tech_-_102618.docx | DOCX document | |
| Sample_Agreement_-_Form_5_-_On-Call_Engineering_Service.docx | DOCX document | |
| Sample_Agreement_-_Form_7_-_General_Services.docx | DOCX document | |
| Sample_Agreement_-_Form_9_-_Supply.docx | DOCX document | |
| Form_1_-_Engineering_Service_-_102618.docx | DOCX document | |
| Sample_Agreement_-_Form_4_-_Non-Pro_Consultant.docx | DOCX document | |
| Sample_Agreement_-_Form_8_-_Transportation_Services.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B: POTENTIAL PROJECT LIST
This exhibit contains a non-exhaustive list of potential projects that may fall under this contract over the next 3 years. These projects have been categorized according to the location of work.
Addresses for each site listed below can be obtained from West Basin Municipal Water District.
CHEVRON NITRIFICATION TREATMENT PLANT (CNTP)
- CNTP DCS Replacement Project
- CNTP Bulk Chemical Storage
EDWARD C. LITTLE WATER RECYCLING FACILITY (ECLWRF)
- ECLWRF Title 22 Filters R&R Project
- DCS Replacement Project
- ECLWRF Barrier Basin & Pump Station R&R
- ECLWRF Reverse Osmosis Pre-Treatment System R&R
- ECLWRF Reverse Osmosis Post Treatment and Distribution
- ECLWRF Reverse Osmosis Treatment
- ECLWRF Bulk Chemical Storage Improvements
- ECLWRF Title 22 Isolation Valve Replacement
- ECLWRF Title 22 Ozone System Improvement
- ECLWRF Disinfected Tertiary Product Pumps & VFDs Rehabilitation
HYPERION SECONDARY EFFLUENT PUMPING STATION
- Hyperion Force Main
- Hyperion Pump Station R&R Project
JUANITA MILLENDER-MCDONALD CARSON REGIONAL WATER RECYCLING PLANT
(JMMCRWRP)
- JMMCRWRP Bulk Chemical Storage Improvements
- JMMCRWRP Site Improvements Project
TORRANCE REGIONAL WATER RECYCLING PLANT (TRWRP)
- TRWRP Boiler feed Potable Water Backup
- TRWRP PLCs - DCS Replacement Project
- TRWRP Bulk Chemical Storage Improvements
- TRWRF MF Replacement Project
- TRWRF Waste Discharge Improvements
- TRWRF Fiberglass Pipe Replacement
- TRWRF 93MCC 2 Replacement
- TRWRF Sulfuric Acid Day Tank Chemical Containment
MULTI-PLANT AND PIPELINE PROJECTS
- Chemical Containment R&R Project (All Satellite Sites)
- Customer Service Pipelines & Laterals
- Distribution Facilities
- Distribution System SCADA Project
OPERATION SUPPORT SERVICES
- RO Pre-qualification Testing
- MF pre-qualification Testing
- Ozone Performance Assessment
- Membrane Performance Monitoring
- Clean-in-place Optimization