EXHIBIT B - CDRLS.pdf
PDF 770 KB Posted
- Attached to
- HULL PRESERVATION Federal contract opportunity
- Solicitation number
- N4523A22Q0550
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 3 Pages
Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
KEY PERSONNEL AND OTHER PERSONNEL RESUMES
3. SUBTITLE
PERSONNEL RESUMES
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
PWS PARA 3.1.1
6. REQUIRING OFFICE
NWRMC C440
7. DD 250 REQ
N/A
9. DIST STATEMENT
REQUIRED
NA
10. FREQUENCY
R/ASR
12. DATE OF FIRST SUBMISSION
SEE 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
SEE 16
Draft
Final
Reg Repro
16. REMARKS
BLK 12: Resumes of potential OEM Coating Representatives shall be submitted with the bid offer.
BLK 13: Resume(s) of individual(s) selected as the OEM Coating Representative(s) shall be submitted NLT Availability Start Date minus 15 days (A-15).
BLK 14: Media Requirement: Submission shall be in Adobe Acrobat (PDF) submitted via email.
NWRMC C101.3 1
NWRMC C440 ACO 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE
05/21/2021
I. APPROVED BY J. DATE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page 2 of 3 Pages Reset
DD FORM 1423-1 (BACK), FEB 2001
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER ADMIN
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B002
REPORT, RECORD OF MEETINGS
3. SUBTITLE
MEETING MINUTES
PWS PARA 4.0 and 5.1.1
6. REQUIRING OFFICE
NWRMC C440
7. DD 250 REQ
N/A
A
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 5
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
SEE BLK 16
BLK 8: Government will review the meeting minutes and provide comments within fifteen
(15) days after receipt.
BLK 12, 13: Meeting minutes shall be provided no later than five (5) working days after each meeting (see block 5). Revisions, as required, ten (10) days after receipt of comments.
BLK 14: Media Requirement: Submission shall be in Adobe Acrobat (PDF) submitted via email.
NWRMC C103.1 PM 1
NWRMC C103.1 PM 1 1
15. TOTAL 1 2 1
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: ADMIN
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B003
PAINT PRESERVATION APPENDICES REPORT
3. SUBTITLE
HULL CONDITION REPORT
PWS PARA 5.2.3.3, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 440
7. DD 250 REQ
N/A
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
Data and format requirements are in ASTM F 1130-99. Utilize Figure 6 and Figure 17 of ASTM F1130-99 to assess the condition of existing underwater hull coating.
BLK 12, 13: Initial submittal is due at Availability Start Date minus 15 days (A-15) for format approval. The Field Service Technical Representative (FSTR) shall submit these reports to the RMC Representative after the "prior to cleaning" inspection within (12-18) hours of the vessel coming out of the water and after the "after cleaning" inspection, which is within (12-18) hours of the cleaning. Report shall be included in conjunction with CDRL B012 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The Hull Condition Report shall be in Adobe Acrobat (PDF) format and submitted via email or CD.
NWRMC C101.3 PM 1
NWRMC C101.3 PM 1 1
15. TOTAL 1 1 2
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MISC
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B004
PAINT PRESERVATION APPENDICES REPORT
3. SUBTITLE
SURFACE PREPARATION REPORT
PWS PARA 5.2.3.9, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 440
7. DD 250 REQ
N/A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
BLK 8: The Government will review and approve the initial submittal for format and provide comments ten (10) calendar days after receipt.
format approval. Report shall be submitted within twenty-four (24) hours of the completion of surface preparation and before the start of painting. Report shall be included in conjunction with CDRL B012 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The Surface Preparation Report shall be in Adobe Acrobat (PDF) format and submitted via email or CD.
NWRMC C101.3 PM 1
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MISC
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B005
CONTRACTOR'S PROGRESS, STATUS MANAGEMENT
REPORT
3. SUBTITLE
DAILY PAINT PROGRESS REPORT
6. REQUIRING OFFICE
NWRMC C101.3
7. DD 250 REQ
N/A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS NWRMC C101.3 PM 1
NWRMC C440 ACO 1
BLK 4: The Daily Paint Progress Report shall include daily observations and recordings of NWRMC C101.3 PM 1 1 surface preparations (profiles, chloride readings, and temperatures), ambient temperature and dew point, and paint application and consumption (quantities, batch numbers, color, wet and dry film thickness, etc). These reports shall include time of day for significant events (e.g. start and finish times, discussions with shipyard personnel regarding problems, etc.). Summary of work completed during the availability including photographs and enclosed in a binder.
The Daily Paint Progress Report shall be located in the last section of the Final Availability
Report (CDRL, B012).
BLK 5: CONTRACT REFERNCE PWS PARA 5.2.2, 5.2.3.2, 5.2.3.4, 5.2.3.5, 5.2.3.6,
5.2.3.8, 5.2.3.10, 5.2.3.11, 5.2.3.12, 5.2.3.13, 5.2.3.17
BLK 8: RMC Representative shall sign Daily Paint Progress Reports. The Government will review and approve the initial submittal for format and provide comments ten (10) calendar days after receipt.
format approval. Report shall be submitted daily during the preservation process. All daily reports shall be included in conjunction with CDRL B0012 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The Daily Paint Progress Reports shall be in Adobe Acrobat
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B006
CONTRACTOR'S PROGRESS, STATUS MANAGEMENT
REPORT
3. SUBTITLE
WEEKLY OUTSTANDING DELIVERY ORDER
REPORT
PWS PARA 4.4
6. REQUIRING OFFICE
NWRMC CODE 101.3
7. DD 250 REQ
N/A
WKLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
NA
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
BLK 4: Submission shall be in accordance with BLK 5.
The report shall include the following information:
BLK 12, 13: Draft report format due at Availability Start Date minus 15 days (A-15). First weekly report shall begin seven (7) days after issuance of first order.
BLK 14: Media Requirements: The report shall be submitted in Adobe Acrobat (PDF) format and submitted via email or CD.
NWRMC C101.3 PM 1
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B007
DIGITAL IMAGING
3. SUBTITLE
PHOTOGRAPHS
PWS PARA 5.2.3.14, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 101.3
7. DD 250 REQ
N/A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
BLK 12, 13: Submission shall be in accordance with the Daily Paint Progress Report (CDRL, B005) for milestones identified in BLK 5. Photographs shall be included in conjunction with CDRL B012 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The photographs shall be submitted via email or CD.
NWRMC C101.3 PM 1
15. TOTAL 0 1 2
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MISC
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B008
PAINT PRESERVATION APPENDICES REPORT
3. SUBTITLE
APPLICATION DATA SUMMARY REPORT
PWS PARA 5.2.3.9, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 101.3
7. DD 250 REQ
N/A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
Report shall provide a summary of products and color, batch number, wet film thickness, dry film thickness, overcoat time in hours, average relative humidity, temperature, dates of application, and quantity of paint applied for all areas painted.
format approval.
Report shall be submitted NLT five (5) business days after hull preservation completion date. Report shall be included in conjunction with CDRL B012 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The Application Data Summary Report shall be in Adobe Acrobat (PDF) format and submitted via email or CD.
NWRMC C101.3 PM 1
NWRMC C101.3PM 1 1
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MISC
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B009
CONTRACTOR'S PROGRESS, STATUS MANAGEMENT
REPORT
3. SUBTITLE
COATING INSPECTION REPORT
PWS PARA 5.2.3.15, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 101.3
7. DD 250 REQ
N/A
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Data and format requirements are in ASTM F 1130-99. Utilize Figure 6 and Figure 17 of ASTM F1130-99 to assess the condition of existing underwater hull coating.
Report shall be submitted within one (1) day of completion of underwater hull. Report shall be included in conjunction with CDRL B012 NLT ten (10) calendar days after completion of the availability.
BLK 14: Media Requirements: The Coating Inspection Report shall be submitted in Adobe PDF format via email or CD.
NWRMC C101.3 PM 1
15. TOTAL 0 1 2
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B010
CONTRACTOR'S PROGRESS, STATUS MANAGEMENT
REPORT
3. SUBTITLE
SUMMARY EXCEPTION REPORT
PWS PARA 5.2.3.4, 5.2.3.13, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 101.3
7. DD 250 REQ
N/A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
Report shall document problems and decisions on painting problems that have occurred during the availability.
format approval.
At time of exception, submit within twenty-four (24) hours of occurrence to RMC PM.
Report shall be included in conjunction with CDRL B012 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The Summary Exception Report shall be in Adobe Acrobat
NWRMC C101.3 PM 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B011
CONTRACTOR'S PROGRESS, STATUS MANAGEMENT
REPORT
3. SUBTITLE
FINAL JOB INVENTORY REPORT
PWS PARA 5.2.3.16, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 101.3
7. DD 250 REQ
N/A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
format approval. Final Job Inventory Report in the Final Availability Report shall be submitted NLT five (5) business days after the availability completion date. Report shall be in conjunction with CDRL B012 NLT ten (10) calendar days after completion of availability.
BLK 14: Media Requirement: The Final Job Inventory Report shall be submitted via email or CD.
NWRMC C101.3 PM 1
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
(See DoD 5010.12-M for detailed instructions.)
submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
B012
CONTRACTOR'S PROGRESS, STATUS MANAGEMENT
REPORT
3. SUBTITLE
FINAL REPORT
PWS PARA 4.0, 5.1.2, 5.2.3.17
6. REQUIRING OFFICE
NWRMC CODE 101.3
7. DD 250 REQ
N/A
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
NA
13. DATE OF SUBSEQUENT
BLK 8: The government will have seven (7) calendar days after receipt for review and comment. The Contractor shall have seven (7) calendar days to incorporate comments.
BLK 12, 13: Submitted NLT ten (10) days after the availability completion date. This report, including cover sheet, shall be submitted in conjunction with the following reports in order:
a. Final Job Inventory Report (B011)
b. Summary Exception Reports (B010)
c. Coating Inspection Report (B009)
d. Application Data Summary Report (B008)
e. Photographs (B007)
f. Surface Preparation Report (B004)
g. Hull Condition Report (B003)
h. Daily Paint Progress Report (B005)
BLK 14: Media Requirement: The Final Status Report shall be submitted via CD.
NWRMC 440 ACO 1
NWRMC 101.3 PM 1 1
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY: MGMT
TDP TM OTHER
D. SYSTEM/ITEM
PAINT SUPPLY AND SERVICES
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .