Exhibit A Technical Requirements Document.pdf

PDF 278 KB Posted

Attached to
REFLECTOR, ANTENNA, NSN: 5985-01-691-8795
Solicitation number
SPRBL1-22-Q-0035
Issued by

View the file

Other files

File Type Posted
SPRBL1-22-Q-0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A SPRBL1-Q-0035 Page 1 of 7 Issue: 8 August 2022

Version: 17 Dec 2021

TECHNICAL REQUIREMENTS

Hardware Spares

Warfighter Information Network – Tactical Increment 2

Exhibit A SPRBL1-Q-0035 Page 2 of 7

TABLE OF CONTENTS

APPLICABLE DOCUMENTS

CONFIGURATION BASELINE

Part Revisions

PACKAGING

Wood Packing Material

Military Packaging

CONTRACT SECURITY REQUIREMENTS

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL List

Individual CDRLs

Exhibit A SPRBL1-Q-0035 Page 3 of 7

APPLICABLE DOCUMENTS

Military and Federal Standards MIL-STD-2073-1E Standard Practice for Military Packaging MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-130N Identification Marking of U.S. Military Property

Military and Federal Specifications

DFARS 252.211-7003 Item Identification and Valuation DFARS 252.211-7006 Passive Radio Frequency Identification FAR 42.503 Post Award Conferences

Other Documents None

Commercial Documents

ANSI/ASQ 9001:2015

Security Documents None

CONFIGURATION BASELINE

The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.

NSN Nomenclature Part Numbers/Drawings

5985-01-691-8795 REFLECTOR, ANTENNA 7586626

Exhibit A SPRBL1-Q-0035 Page 4 of 7

Part Revisions Each CI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). Configuration changes not directly affecting the configuration baseline do not require Government approval prior to incorporation, but must be documented by the contractor and shall be made available to the Government upon request.

PACKAGING

Wood Packing Material Wood packing material includes pallets. See DLAD T/Q Requirement RP001 DLA Packaging Requirements for Procurement, which includes requirements for treatment of wood packaging material.

Military Packaging DS7029 and/or DS7033 Preservation, Packing and Marking Instructions

DS7029 - DS7033 LEGEND

Qty Quantity Prot Req Protection Required PKG-REF Packaging Reference (Military/Federal Specification or Standard) SPI Special Packaging Instruction LPK Level of Packing QUP Quantity per Unit Pack ICQ Intermediate Container Quantity Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073 The below codes are for special markings:

PC Project Code WG Warranty/Guarantee SL Shelf Life BC Bar Code FMS Foreign Military Sales

Exhibit A SPRBL1-Q-0035 Page 5 of 7

DS7029 - DS7033

NSN Prot Req PKG-REF or SPI LPK QUP ICQ Special Markings

Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM) 5985-01-691-8795 Military

MIL-STD-2073-1E

MIL-STD-129R 001 - n/a n/a n/a n/a

Exhibit A SPRBL1-Q-0035 Page 6 of 7

CONTRACT SECURITY REQUIREMENTS

The contract has been deemed Controlled Unclassified Information (CUI)/UNCLASSIFIED. The Contractor shall be required to have CUI/UNCLASSIFIED facility clearance with appropriate CUI/UNCLASSIFIED safeguarding capability.

In the event of a discrepancy between the signed DD 254 Contract Security Classification Specification, included as an attachment to the solicitaition/contract, and the language in this section, the signed DD 254 information shall take precedence.

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

CDRL List

CDRL

Data Line No. DID Identification Title A001 DI-MISC- 80711A Scientific and Technical Reports – Configuration Control

Exhibit A SPRBL1-Q-0035 Page 7 of 7

Individual CDRLs

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.9000 B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER

MISC

D. SYSTEM/ITEM

WIN-T Inc 2

E. CONTRACT/PR NO. TBD F. CONTRACTOR TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Scientific and Technical Reports

3. SUBTITLE

Configuration

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A

5. CONTRACT REFERENCE

Tech Requirements

6. REQUIRING OFFICE

AMEL-LCC-NB

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLOCK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

BLOCK 16

Draft Final

Reg Repro

16. REMARKS

BLK 4: Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in this Technical Requirements. WIN-T Increment 2 Hardware Spares.

The Contractor shall prepare and submit a Request for Variance (RFV) for Government review in accordance with this Technical Requirements section for Configuration Management when there is a change or departure from a contractual baseline.

All RFVs for changes shall be submitted for Government review or notification within 5 business days of Contractor approval and prior to presentation of the product for acceptance, but not later than 30 calendar days, of any such product. The Government shall review, accept, and/or comment on the draft submission in 30 calendar days. The Contractor shall incorporate changes and re-submit within 30 calendar days. The Government will have 30 calendar days to review, accept, or comment on the final submission.

Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

PCO 0 1 0

AMEL-LCC-NB 0 1 0

15. TOTAL 0 2 0

G. PREPARED BY

BURLEY.NICHOLAS.A.155

7804508

Digitally signed by

BURLEY.NICHOLAS.A.1557804508

Date: 2022.06.02 08:14:27 -04'00'

H. DATE

6/2/22

I. APPROVED BY

SULLIVAN.RICHARD.ALFONSO Digitally signed by

SULLIVAN.RICHARD.ALFONSO.JR.1229242470

.JR.1229242470 Date: 2022.06.14 14:50:39 -04'00'

J. DATE

14 June 22

APPLICABLE DOCUMENTS
CONFIGURATION BASELINE
Part Revisions
PACKAGING
Wood Packing Material
Military Packaging
CONTRACT SECURITY REQUIREMENTS
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List
Individual CDRLs

File details come from the government source that posted it. Updated .