Exhibit A - CONTRACT DATA REQUIREMENTS LIST - BSU-33 FIN ASSEMBLY.pdf
PDF 2 MB Posted
- Attached to
- BSU-33 C/B Conical Fin Assembly Federal contract opportunity
- Solicitation number
- W52P1J-22-R-0010
About this file
This solicitation requests proposals for the BSU-33 C/B Conical Fin Assembly. The U.S. Army Materiel Command Joint Munitions Command seeks this assembly to fulfill government requirements. The solicitation will be competed as a 100% Total Small Business Set-Aside. Offerors must submit proposals no later than October 12, 2022. The document includes a Contract Data Requirements List that specifies data items required from the contractor, such as quality plans, test procedures, and progress reports. Delivery of the first article is required within 270 days of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 0004 - CDRL DISTRIBUTION - LIST OF ADDRESSES UPDATED.pdf | ||
| W52P1J22R0010-0001.pdf | ||
| ATTACHMENT 0010 - ASSIST INSTRUCTIONS.pdf | ||
| ATTACHMENT 0008 - GOVERNMENT FURNISHED MATERIAL LISTING.pdf | ||
| ATTACHMENT 0004 - CDRL DISTRIBUTION - LIST OF ADDRESSES.pdf | ||
| ATTACHMENT 0012 - PRODUCTION AND SHIPMENT PROGRESS REPORT.xlsx | XLSX spreadsheet | |
| ATTACHMENT 0003 - GUIDANCE ON DOCUMENTATION OF CDRLS.pdf | ||
| ATTACHMENT 0002 - INSTRUCTIONS FOR FORM DD1423.pdf | ||
| ATTACHMENT 0011 - EPA ADJUSTMENT WORKSHEET.xlsx | XLSX spreadsheet | |
| ATTACHMENT 0005 - QUALITY ASSURANCE PROVISIONS BSU-33 FIN ASSEMBLY REV. D.pdf | ||
| ATTACHMENT 0001 - PRICE EVALUATION SPREADSHEET.xlsx | XLSX spreadsheet | |
| ATTACHMENT 0009 - PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| ATTACHMENT 0007 - SECURITY STATEMENT OF WORK.pdf | ||
| ATTACHMENT 0006 - OPSEC PLAN SAMPLE.pdf | ||
| W52P1J22R0010.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER QCIC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A00l QUALITY PROGRAM PLAN (QPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81722 SECTION E (SEE BLK 16) AMJM-QAP
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ONE/R(SEE 16) 150 DAC (SEE 16) b.COPIES
B.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
BLK 5: THE QUALITY PROGRAM PLAN (QPP) SHALL DOCUMENT THE 0 1 0
CONTRACTOR'S IMPLEMENTATION OF A QUALITY SYSTEM IN 0 1 0
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED 0 1 0
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS 0 1 0
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
a. ADDRESSEE
AMJM-QAP
NA WCWD (D434200)
NSWC (MS-21)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB 0 1 0
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
(SEE BLK 16)
BLK 10, 12: THE QPP SHALL BE SUBMITTED NO LATER THAN 150
CALENDAR DAYS AFTER CONTRACT A WARD. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE QPP WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HA VE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF
RECEIPT. THE QPP SHALL BE APPROVED PRIOR TO FAT, IF FAT IS
REQUIRED, OR PRIOR TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION OF QPP.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CORL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 7 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of 18 Pages
04 AUG 22
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 STATISTICAL PROCESS CONTROL (SPC) PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81987A SECTION E AMJM-QAP
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ONE/R(SEE 16) 150 DAC (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED 0 1 0
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS 0 1 0
ONLY: EXPORT CONTROLLED 30 AUG 21. OTHER REQUESTS SHALL
0 1 0 BE REFERRED TO PMA-201, NAS PATUXENT RNER, MARYLAND.
0 1 0
BLK 10, 12: THE GENERAL PLAN SHALL BE SUBMITTED NO LATER 0 1 0
THAN 150 CALENDAR DAYS AFTER CONTRACT A WARD. THE FINAL
a. ADDRESSEE
AMJM-QAP
NA WCWD (D434200)
NSWC (MS-21)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB 0 1 0
DETAILED PLAN SHALL BE SUBMITTED 30 DAYS AFTER FAT
APPROVAL, IF FAT IS REQUIRED, OR 30 DAYS AFTER INITIATION OF (SEE BLK 16)
PRODUCTION. THE GOVERNMENT REQUIRES 30 DAYS FOR REVIEW.
DISPOSITION OF THE GENERAL AND DETAILED SECTIONS WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HA VE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF
RECEIPT.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION OF SPC.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 7 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _2_ of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER QCIC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 INSPECTION AND TEST PLAN {ITP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81110- NOTICE 2 SECTION E (SEE BLK 16) AMJM-QAP
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ONE/R(SEE 16) 150 DAC (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 5: THE INSPECTION AND TEST PLAN (ITP) SHALL BE IN 0 1 0
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED 0 1 0
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS 0 1 0
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
a. ADDRESSEE
AMJM-QAP
NA WCWD (D434200)
NSWC (MS-21)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB 0 1 0
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
(SEE BLK 16)
BLK 10, 12: THE ITP SHALL BE SUBMITTED NO LATER THAN 150
CALENDAR DAYS AFTER CONTRACT A WARD. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE ITP WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS. THE ITP
SHALL BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR
TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION OF ITP.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 7 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER QCIC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 MEASUREMENT SYSTEM EVALUATION (MSE) - ACCEPTANCE INSPECTION EQUIPMENT
MEASUREMENT AND INSPECTION EQUIPMENT (AIE)
SYSTEM DESIGN DOCUMENTATION FOR
ACCEPTANCE OF PRODUCT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81960- NOTICE 1 SECTION E (MSE CLAUSE) NSWC (MS-21)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ONE/R(SEE 16) 150 DAC (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED 0 1 0
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS 0 1 0
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
0 1 0 BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
0 1 0
BLK 10, 12: THE CONTRACTOR SHALL SUBMIT A COMPLETED 0 1 0
MEASUREMENT SYSTEM EVALUATION (MSE)/ACCEPTANCE
a. ADDRESSEE
NSWC (MS-21)
AMJM-QAP
NA WCWD (D434200)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB 0 1 0
INSPECTION EQUIPMENT (AIE) PACKAGE NO LATER THAN 150
CALENDAR DAYS AFTER CONTRACT A WARD. THE GOVERNMENT (SEE BLK 16)
WILL PROVIDE DISPOSITION WITHIN 45 DAYS AFTER FINAL MSE/ AIE
PACKAGE RECEIPT.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HA VE 30 DAYS TO GENERA TE REVISIONS AND THE
GOVERNMENT SHALL HA VE 30 DAYS TO REVIEW AND RESPOND.
THE APPROVED MSE/AIE SHALL BE AVAILABLE FOR FAT, IF FAT IS
REQUIRED; PRODUCTION, AND/OR ALL ACCEPTANCE OF PRODUCT
UNDER THE CONTRACT. IF CONTRACTOR REVISES A PREVIOUSLY
GOVERNMENT-ACCEPTED MSE/AIE FOR THIS CONTRACT, THE
REVISED MSE/AIE MUST BE SUBMITTED TO THE GOVERNMENT FOR
REVIEW AND APPROVAL. GOVERNMENT APPROVAL MUST BE
GRANTED BEFORE MSE/AIE IS USED FOR ACCEPTANCE OF PRODUCT.
THE GOVERNMENT WILL RESPOND WITHIN 30 DAYS AFTER RECEIPT
OF AIE.
THE CONTRACTOR SHALL NOTIFY THE RESPONSIBLE GOVERNMENT
TECHNICAL AGENCY WITHIN A MINIMUM OF 30 DAYS PRIOR
TO ACCEPTANCE (PROVE OUT) TESTING.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CORL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 7 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 REQUEST FOR VARIANCE (RFV)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80640E (SEE BLK 16) SECTION C NA WCWD (D434200)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ASREQ (SEE16) ASREQ (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
a. ADDRESSEE Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 4: DELETE PARAGRAPH 2B AND 2C AND INCLUDE ADEQUATE
0 1 0
DATA/ANALYSIS/TESTING TO SUPPORT THE REQUEST IN THE
0 1 0 CONTENT OF THE RFV. THE CONTRACTOR SHALL PREPARE AND
SUBMIT A RFV FOR EACH VARIANCE ON DD FORM 1694, LOCATED AT:
NA WCWD (D434200)
AFLCMC/EBHCB
AFLCMC/EBHEC
CCRI-AMM
SFAE-AA-JB 0 1 0
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm (SEE BLK 16)
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE
EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE
22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT
OF 1979, AS AMENDED (TITLE 50, U.S.C, APP 2401 ET SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENAL TIES. DISSEMINATION OF THIS DOCUMNET IS
CONTROLLED UNDER DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE - DESTROY BY ANY METHOD THAT WILL
PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 5 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources.
gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 ENGINEERING CHANGE PROPOSAL (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639E (SEE BLK 16) SECTION C NA WCWD (D434200)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ASREQ (SEE 16) ASREQ (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
a. ADDRESSEE Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 4: DELETE PARA GRAPH 2B AND 2C. SUBMIT TEXT FILES IN
GOVERNMENT COMPATIBLE MICROSOFT WORD AND VIEW FILES IN
0 1 0
GOVERNMENT COMPATIBLE ADOBE ACROBAT. FOR DRAWINGS, 0 1 0
SUBMIT PDF VIEW FILES IN GOVERNMENT COMPATIBLE ADOBE
NA WCWD (D434200)
AFLCMC/EBHCB
AFLCMC/EBHEC
CCRI-AMM
SFAE-AA-JB 0 1 0
ACROBAT. (SEE BLK 16)
THE CONTRACTOR SHALL PREPARE AND SUBMIT AN ECP ON DD
FORM 1692, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/ dd/ ddforms 1500-1999 .htm
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
ONLY: EXPORT CONTROLLED: 03 DEC 2020. OTHER REQUESTS SHALL
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE
EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE
22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT
OF 1979, AS AMENDED (TITLE 50, U.S.C, APP 2401 ET SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENAL TIES. DISSEMINATION OF THIS DOCUMNET IS
CONTROLLED UNDER DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE - DESTROY BY ANY METHOD THAT WILL
PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 5 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 NOTICE OF REVISION (NOR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80642E (SEE BLK 16) SECTION C NA WCWD (D43200)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ASREQ (SEE 16) ASREQ (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
a. ADDRESSEE Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 4: DELETE PARA GRAPH 2B AND 2C. SUBMIT IN CONJUNCTION 0 1 0
WITH CDRL A006 (ECP).
0 1 0
FOR EACH DRAWING, ASSOCIATED LIST, OR OTHER REFERENCED
NA WCWD (D434200)
AFLCMC/EBHCB
AFLCMC/EBHEC
CCRI-AMM
SFAE-AA-JB 0 1 0
DOCUMENT WHICH REQUIRES REVISION, THE CONTRACTOR SHALL (SEE BLK 16)
PREPARE AND SUBMIT NOR ON DD FORM 1695, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE
EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE
22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT
OF 1979, AS AMENDED (TITLE 50, U.S.C, APP 2401 ET SEQ.).
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENAL TIES. DISSEMINATION OF THIS DOCUMNET IS
CONTROLLED UNDER DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE - DESTROY BY ANY METHOD THAT WILL
PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE
DOCUMENT.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 5 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008 TEST/INSPECTION REPORT FIRST ARTICLE TEST REPORT (FATR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B- NOTICE 2 SECTION E AMJM-QAP
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ONE/R(SEE 16) 270 DAC (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED 0 1 0
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS 0 1 0
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
0 1 0 BE REFERRED TO PMA-201, NAS PATUXENT RNER, MARYLAND.
0 1 0
BLK 10, 12: THE FIRST ARTICLE TEST (FAT) REPORT SHALL BE 0 1 0
SUBMITTED WITH QAR FINDINGS ON DD FORM 1222. FAT REPORT
0 1 0
SHALL BE SUBMITTED 270 DAYS AFTER CONTRACT AW ARD. THE
GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE
a. ADDRESSEE
AMJM-QAP
NA WCWD (D434200)
NSWC (MS-21)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB
(SEE BLK 16)
FAT REPORT WILL BE PROVIDED THROUGH THE PCO. FAT MUST BE
APPROVED PRIOR TO PRODUCTION.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HA VE 15 DAYS TO GENERA TE REVISIONS AND THE
GOVERNMENT SHALL HA VE 15 DAYS TO REVIEW AND RESPOND.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 7 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of 1 8 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 TEST/INSPECTION REPORT LOT ACCEPTANCE TEST REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B NOTICE 2 SECTION E DCMA-MCWB (QAR)
(SEE BLK 16
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ASREQ (SEE 16) ASREQ (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 4: LOT ACCEPTANCE TEST (LAT) REPORTS SHALL CONTAIN ALL
INSPECTION RECORDS OF CLASSIFIED CHARACTERISTIC SAMPLES
0 1 0
AND ANY OTHER TESTS REQUIRED FOR EACH LOT PER THE
a. ADDRESSEE
DCMA- M CWB (QAR)
WARP
CCRI-AMM
SFAE-AA-JB 0 1 0
CONTRACT. (SEEBLK 16)
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
BLK 10, 12, 13: SUBMISSION OF LAT REPORTS AND PRODUCTION
ACCEPTANCE TEST REPORTS SHALL BE NO LATER THAN 30 DAYS
AFTER LAT. THE QAR WILL PROVIDE DISPOSITION OF
LOT/PRODUCTION ACCEPTANCE TEST REPORTS.
BLK 14: LAT REPORTS SHALL BE SUBMITTED BY ACCESSING THE
WORLDWIDE AMMUNITION DATA CARD REPOSITORY PROGRAM
(WARP) WHICH IS LOCATED ON THE MUNITIONS HISTORY PROGRAM
(MHP) WEBSITE AT: https://mph.redstone.army.mil/.
SUBMIT ELECTRONICALLY UNLESS OTHERWISE SPECIFIED.
15. TOTAL 0 4 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _9_ of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the lime for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organiution. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A0lO AMMUNITION DATA CARD
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80043B- NOTICE 2 SECTION C, MIL-STD-1168 DCMA-MCWB (QAR)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO ASREQ (SEE 16) ASREQ (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION a. ADDRESSEE Final
NIA ASREQ (SEE 16)
Draft
NIA Reg Repro
16. REMARKS DCMA-MCWB (QAR) 0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED W ARP 0 1 0
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS LOT SHIPMENT* 0 2 0
ONLY: EXPORT CONTROLLED 30 AUG 21. OTHER REQUESTS SHALL
MAIL TO DEST** 0 2 0 BE REFERRED TO PMA-201, NAS PATUXENT RNER, MARYLAND
(SEEBLK 16)
BLK 10, 12, 13: AMMUNITION DATA CARDS (ADC) SHALL BE
PREPARED IA W MIL-STD-1168, SECTION C, AND BY ACCESSING THE
WORLDWIDE AMMUNITION DATA REPOSITORY PROGRAM (WARP),
WHICH IS LOCATED AT https:llmhp.redstone.army.mil.
BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)
IN ACCORDANCE WITH ATTACHMENT FOR CDRL DISTRIBUTION LIST.
*HARD COPY ADC PROVIDED WITH LOT SHIPMENTS SHALL BE
GENERATED FROM THE W ARP PROGRAM AND SIGNED AND DATED
BY THE GOVERNMENT AGENCY RESPONSIBLE FOR ACCEPTANCE
(GARA).
**WHEN BALLISTIC TESTS ARE REQUIRED, ONE HARD COPY
GENERATED FROM THE W ARP PROGRAM SIGNED AND DATED BY THE
GARA SHALL BE SENT TO THE PROVING GROUND WITH SAMPLE
SHIPMENT, PLUS AN ADDITIONAL SIGNED HARD COPY PROVIDED TO
THE PROVING GROUND BY MAIL.
15. TOTAL 0 6 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 10 of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3.SUBTITLE
A011 FAILURE SUMMARY AND ANALYSIS REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80255B Attachment 0005 - QAP 923AS900 AMJM-QAP
7. DD250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ASREQ (SEE 16) ASREQ (SEE 16) b.COPIES
B.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 5: THE FAILURE SUMMARY AND ANALYSIS REPORT SHALL BE IN 0 1 0
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED 0 1 0
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS 0 1 0
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL
0 1 0
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
a. ADDRESSEE
AMJM-QAP
NA WCWD (D434200)
NSWC (MS-21)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB
(SEE BLK 16)
BLK 10, 12, 13: CONTRACTOR SHALL NOTIFY NA WCWD (QA),
NA WCWD (D434200) AMJM-QAP, AND THE PCO VIA EMAIL WITHIN 24
HOURS AFTER THE OCCURRENCE OF A FAILURE DURING
ACCEPTANCE TESTING; INCLUDING, BUT NOT LIMITED TO, ANY
FAILURES DURING FAT/LAT AND ANY DESTRUCTIVE OR NON-
DESTRUCTIVE TEST FAILURES. FORMAL SUBMITTAL SHALL BE NO
LATER THAN lODAYS AFTER REPORTED FAILURE. FINAL REPORT
SHALL BE SUBMITTED NO LATER THAN 30 DAYS AFTER
DETERMINING/CONDUCTING ROOT CAUSE FAILURE ANALYSIS.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 7 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 11 of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to Iha above organization. Sand completed form to Iha Government Issuing Contracting Officer for Iha Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 TEST PROCEDURE PHOSPHATE COATING PRE-PRODUCTION
PROCEDURE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80603A SECTION E NAWCWD(QA)
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ONE/R(SEE 16) 150 DAC (SEE 16) b.COPIES
B.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
0 1 0 TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL 0 1 0
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND.
0 1 0
BLK 10, 12: THE PHOSPHATE PROCEDURE SHALL BE SUBMITTED NO LATER 0 1 0
THAN 150 CALENDAR DAYS AFTER CONTRACT AW ARD. THE GOVERNMENT 0 1 0
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION IS PROVIDED THROUGH THE
a. ADDRESSEE
NAWCWD(QA)
NA WCWD (D434200)
AMJM-QAP
NSWC (MS-21)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB 0 1 0 PCO. IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HA VE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT SHALL (SEE BLK 16)
REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF RECEIPT. THE TEST
PLANIPHOSPHATE COATING PRE-PRODUCTION PROCEDURE SHALL BE
APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO INITIATION OF
PRODUCTION.
PANELS SHALL BE SUBMITTED PER TT-C-490 TO THE FOLLOWING ADDRESS:
NAWCWD
1900 N. KNOX RD, MS6213
BUILDING 02466, ROOM 1250
CHINA LAKE, CA 93555-6106
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL PRIOR TO
PRODUCTION.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https://safe.apps.mil/).
15. TOTAL 0 8 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 12 of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to Iha above organization. Sand completed form to Iha Government Issuing Contracting Officer for Iha Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A013 GOVERNMENT FURNISHED MATERIAL (GFM)
CONSUMPTION REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80438B- NOTICE 1 SECTION C, SOW AMJM-CDP
(SEE BLK 16
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO MTHLY DFDEL (SEE 16) b.COPIES
8.APP CODE NIA 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final Draft
NIA NIA ASREQ (SEE 16) Reg Repro
0 1 0
0 1 0
AMJM-SPB
CCRI-AMM
SFAE-AA-JB 0 1 0
(SEE BLK 16)
16. REMARKS
BLK 4: CONTRACTOR FORMAT ACCEPTABLE, DELETE PARAGRAPHS
2.1-2.3, 2.8, 2.9, 2.11, 2.16. SHALL BE SUBMITTED IN ELECTRONIC
FORMAT IN EITHER RICH TEXT FORMAT (RTF) OR ASCII AND INCLUDE
DESCRIPTION/NSN; TOTAL OF GOVERNMENT FURNISHED MATERIAL
(GFM) ON CONTRACT VS. TOTAL DELIVERED AS OF THE CURRENT
MONTH; RECEIPTS, CUMULATIVE VS. CURRENT MONTH; CONSUMED,
CUMULATIVE VS. CURRENT MONTH; REJECTED/DAMAGED
MATERIAL, LOT NUMBERS AND SERIAL NUMBERS OF GFM; AND LAP
CLINS, CONTRACT QUALITY VS. DELIVERED QUANTITY.
BLK 12: WITHIN 14 DAYS OF CONTRACTOR RECEIPT OF FIRST
SHIPMENT OF GFM.
BLK 13: SUBMIT 10 WORKING DAYS FOLLOWING REPORTING MONTH.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR DOD-SAFE (https:llsafe.apps.mil/).
15. TOTAL 0 3 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21 04 AUG 22
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 13 of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organia:ation. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
2. TITLE OF DATA ITEM 3.SUBTITLE 1. DATA ITEM NO.
A014
CONFERENCE AGENDA &
DRAFT PRESENTATION SLIDES
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81249B SECTION C CCRI-AMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO ASREQ ASREQ (SEE 16) b.COPIES
B.APP CODE NIA 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Final Draft
NIA NIA ASREQ (SEE 16) Reg Repro
0 1 0
0 1 0
0 1 0
0 1 0
0 1 0
0 1 0
a. ADDRESSEE
CCRI-AMM
NA WCWD (D434200)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
AMJM-QAP
SFAE-AA-JB
(SEE BLK 16)
16. REMARKS
BLK 12: CONTRACTOR SHALL SUBMIT AN AGENDA AND
PRESENTATION SLIDES FOR ALL PROGRAM MANAGEMENT
REVIEWS, 30 DAYS PRIOR TO MEETING, FOR GOVERNMENT
REVIEW AND COMMENTS.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CORL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https:llsafe.apps.mil/).
15. TOTAL 0 6 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21 04 AUG 22
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 14 of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3.SUBTITLE
A015
CONFERENCE MINUTES &
FINAL PRESENTATION SLIDES
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81250B SECTION C CCRI-AMM
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO ASREQ ASREQ (SEE 16) b.COPIES
8.APP CODE NIA 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Final Draft
NIA NIA ASREQ (SEE 16) Reg Repro
0 1 0
0 1 0
0 1 0
0 1 0
0 1 0
0 1 0
16. REMARKS
BLK 12: CONTRACTOR SHALL SUBMIT MINUTES FROM ALL
PROGRAM MANAGEMENT REVIEWS NLT THAN 10 DAYS AFTER
MEETING OR REVIEWS.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CDRL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https:llsafe.apps.mil/).
a. ADDRESSEE
CCRI-AMM
NA WCWD (D434200)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
AMJM-QAP
SFAE-AA-JB
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 15 of 18 Pages
The public reporting burden for this collection of infonnation is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of infonnation, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A016 OPERATIONS SECURITY (OPSEC) PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80934C- NOTICE 1 SECTION H AMJM-QAP
7. 00250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT ONE/R ASREQ (SEE 16) b.COPIES
8.APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
A NIA ASREQ (SEE 16) Reg Repro
16. REMARKS
0 1 0
0 1 0
BLK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS
0 1 0
ONLY: EXPORT CONTROLLED: 30 AUG 21. OTHER REQUESTS SHALL 0 1 0
BE REFERRED TO PMA-201, NAS PATUXENT RIVER, MARYLAND 0 1 0
0 1 0
BLK 10: GOVERNMENT REQUIRES 10 CALENDAR DAYS FOR REVIEW
0 1 0
AND APPROVAL. IF REVISIONS ARE REQUIRED, RESUBMIT 10
CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
a. ADDRESSEE
AMJM-OPP
AMJM-QAP
NA WCWD (D434200)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
CCRI-AMM
SFAE-AA-JB
(SEE BLK 16)
BLK 12: CONTRACTOR SHALL SUBMIT OPSEC PLAN 30 CALENDAR
DAYS AFTER THE CONTRACTING OFFICER PROVIDES THE LIST OF
KNOWN CRITICAL INFORMATION (CI)/THREAT INFORMATION.
BLK 13: ANNUAL SELF-ASSESSMENT AND CHECKLIST ARE DUE ON
THE ANNIVERSARY OF THE CONTRACT AWARD DATE.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CORL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE {https:/ /safe.apps.mi!L).
IN ADDITION SUBMIT TO usarmy.ria.jmc.mbx.opsec-fd@mail.mil.
15. TOTAL 0 7 0
G. PREPARED BY H.DATE I. APPROVED BY J. DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 16 of 18 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response. including the time for reviewing instructions. searching existing data sources, gathering and maintaining the data needed. and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FIN ASSY, BOMB, BSU-33 C/B W52P1J-22-R-0010
2. TITLE OF DATA ITEM 3. SUBTITLE 1. DATA ITEM NO.
A017 PRODUCTION / SHIPPING PROGRESS REPORTS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
SECTION I CCRI-AMM
7. DD 250 REQ 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION 9.DIST STATEMENT
REQUIRED
NO MTHLY SEE 16 b.COPIES
8.APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
(SEE 16) SUBMISSION
Final
Draft
NIA NIA SEE 16 Reg Repro
0 1 0
0 1 0
0 1 0
0 1 0
0 1 0
0 1 0
a. ADDRESSEE
CCRI-AMM
AMJM-QAP
NA WCWD (D434200)
AFLCMC/EBHCB
DCMA-MCWB (QAR)
SFAE-AA-JB
(SEE BLK 16)
16. REMARKS
BLK 4: SUBMIT PRODUCTION/SHIPPING PROGRESS REPORT ON THE
PROVIDED SPREADSHEET (ATTACHMENT 0012). PRODUCTION
PROGRESS DATA WILL INCLUDE CLIN LEVEL INFORMATION, SUCH
AS: DODIC, MODEL/NOMENCLATURE, DELIVERY ORDER, CLIN,
MILSTRIP, SHIP TO ADDRESS (DODAAC), MILSTRIP QTY, AND
ACTUAL SCHEDULE FOR A ROLLING 12 MONTH PERIOD. SHIPPING
PROGRESS DATA WILL INCLUDE DODIC, MODEL/NOMENCLATURE,
DELIVERY ORDER, CLIN, DD250/SHIPMENT NUMBER, LOT NUMBER,
MILSTRIP, SHIP TO ADDRESS (DODAAC), SHIPMENT QTY, DD250
DATE, SHIPMENT REQUEST/SIR SUBMIT AND SIGN DATE.
BLK 12, 13: FIRST SUBMITTAL IS DUE 30 DAYS PRIOR TO
PRODUCTION COMMENCEMENT TO INCLUDE CLINS THAT ARE
CONTRACTUALLY SCHEDULED TO BE PRODUCED WITH A
ROLLING 12 MONTH PERIOD. SUBSEQUENT SUBMISSIONS ARE
DUE MONTHLY, 10TH WORKING DAY OF EACH MONTH.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT FOR CORL
DISTRIBUTION LIST VIA EMAIL OR DOD-SAFE (https:llsafe.apps.mil/).
15. TOTAL 0 6 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
PAWS, TPO 30 AUG 21
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 17 of 18 Pages
SEE 16
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the lime for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP
D. SYSTEM/ITEM E. CONTRACT/PR NO.
W52P1J-22-R-0010FIN ASSY, BOMB, BSU-33 C/BI
1.
DATA ITEM NO. 2. TITLE OF DATA ITEM
TM --- OTHER MISC
F. CONTRACTOR
3.SUBTITLE
AO18 MANAGEMENT PLAN 2-D BAR CODE LABEL VERIFICATION
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
DI-MGMT-80004 (Current Revision) Section: C & D
7. DD250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
LT
REQUIRED
ONE/R ASREQ
8.APP CODE
NIA
11. AS OF DATE 13. DATE OF SUBSEQUENT
A NIA
SUBMISSION
NIA
16. REMARKS
2-D BAR CODES SHALL BE PREPARED IAW MIL-STD-129 AND MIL-
PRF-61002, SUBMITTED AND APPROVED PRIOR TO ANY PRODUCT
BEING SUBMITTED TO THE U.S. GOVERNMENT FOR ACCEPTANCE.
BLKS 12 & 14: PRIOR TO FORMAL SUBMISSION OF PRODUCT TO
THE GOVERNMENT FOR ACCEPTANCE, A FIRST TIME SAMPLE OF
THE SUPPLIER'S 2-D BAR CODING LABEL, COMPRISING OF TWO
(2) EACH OF THE EXTERIOR PACK LABEL AND TWO (2) EACH OF
THE PALLET LABEL, SHALL BE SUBMITTED AND APPROVED. A
MATERIAL CERTIFICATION (CoC) SHALL ALSO BE SUBMITTED
THAT IDENTIFIES THE LABEL BEING USED CONFORMS TO THE
SPECIFICATIONS OF MIL-PRF-61002. 2-D BAR CODE SAMPLES
AND LABEL CoC SHALL BE SENT TO:
HQ, US ARMY JMC, 2695 RODMAN AVENUE, ROCK ISLAND, IL 61299
ATTN: AMJM-QAP/O, "Enter PQM name"
WITHIN FIFTEEN CALENDAR DAYS, THE SUPPLIER WILL BE
NOTIFIED ELECTRONICALLY OF THE APPROVAL, CONDITIONAL
APPROVAL, OR DISAPPROVAL OF THE SUBMITTED 2-D BAR CODE
LABEL.
G. PREPARED BY H.DATE I. APPROVED BY
DD FORM 1423-1, AUG 96 (EG) PREVIOUS EDITION MAY BE USED.
6. REQUIRING OFFICE
AMJM-QA
14. DISTRIBUTION
b.COPIES
a. ADDRESSEE Final Draft
Reg Repro
0 1 0
15. TOTAL .
0 2 0 .
J. DATE
Page of Pages Designed using Perforiii"Pro,WHS71JioR, Aug 96
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
AMSJM-OPP
AFLCMC/EBHEC
SFAE-AA-JB
DCMA-MCWB (QAR)
CCRI-AMM
(SEE BLK 16)
04 MAY 2022 04 AUG 22
18 18
File details come from the government source that posted it. Updated .