Exhibit A - CDRLS W91CRB-20-R-5018.docx

DOCX document 146 KB Posted

Attached to
Iraq Network Operations Center (NOC) Federal contract opportunity
Solicitation number
W91CRB-20-R-5018
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document outlines the Contract Data Requirements List (CDRL) for the Iraq Ministry of Defense Communications Equipment, Services and Training contract. Key details include:

  • The CDRL identifies 12 status reports, test plans, training materials, system design descriptions, and other data items the contractor must deliver. Delivery dates and review processes are specified for each item.

  • The contractor must provide monthly program performance reports, training completion status reports, and other documentation to verify services. Test plans and results are required before and after testing.

  • Training materials like plans and videos are due 30 days before training. System designs are due 20 days after design reviews. Configuration management and program management plans are submitted on defined schedules.

  • Deliverables will be exchanged electronically using specified formats. The government requires review periods before final acceptance for each item. Pricing will be included in the contract sections as most items are not non-priced contract line items.

View the file

Other files for this federal contract opportunity

Other files attached to Iraq Network Operations Center (NOC), newest first.
File Type Posted
Attachment 0001 PWS - W91CRB-20-R-5018.pdf PDF
Request for Proposal - Iraq NOC - W91CRB-20-R-5018.pdf PDF
Attachment 0002 - DUALNOCPRICE - W91CRB-20-R-5018.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

List of CDRLs Iraq Ministry of Defense (MoD) Communications Equipment, Services and Training Performance Work Statement

CDRL#
AUTHORITY
EXHIBIT
PWS PARA
TITLE
PURPOSE
A001
DI-ADMN-81505
A
4.3.4; 4.3.6; 4.5.1
Report, Record of Meeting Minutes
Meeting Documentation
B001
DI-CMAN-80858B
B
4.5.2; 4.5.3.2
Contractor's Configuration Management Plan
Configuration Management
C001
DI-ILSS-80872
C
3.3.1; 3.3.3.3
Training Materials
Training Plan and Materials
D001
DI-IPSC-81432A
D
3.2.4; 4.5.1; 4.5.3.2
System/Subsystem Design Description (SSDD)
System Design
E001
DI-MGMT-80368A
E
4.3.2
Status Report
Program Performance Report
E002
DI-MGMT-80368A
E
4.7.2.1
Status Report
Antiterrorism Level I Training Completion
E003
DI-MGMT-80368A
E
4.7.2.3
Status Report
iWatch Training Completion
E004
DI-MGMT-80368A
E
4.7.3.2
Status Report
Operations Security Training Completion
E005
DI-MGMT-80368A
E
4.7.4
Status Report
TARP Training Completion
E006
DI-MGMT-80368A
E
4.7.5.1
Status Report
ATCTS Registration Verification
E007
DI-MGMT-80368A
E
4.7.5.2
Status Report
Cybersecurity Awareness Training Completion
E008
DI-MGMT-80368A
E
4.17
Status Report
DD250/WAWF Documentation
E009
DI-MGMT-80368A
E
4.18.1
Status Report
Certificate of Completion
E010
DI-MGMT-80368A
E
4.18.2
Status Report
Services Completion Verification
E011
DI-MGMT-80934C
E
4.7.3.1
Operations Security (OPSEC) Plan
OPSEC Plan
E012
DI-MGMT-81117
E
4.2.1; 4.2.2; 4.3.1; 4.3.3, 4.4
Technical and Management Work Plan
Program Management Plan
F001
DI-MISC-80508B
F
3.2.1
Technical Report Study/Services
Site Survey Report
G001
DI-NDTI-80566A
G
4.5.3.1; 4.5.3.2; 4.11
Test Plan
Test Plan
G002
DI-NDTI-80809B
G
4.5.3; 4.5.3.1; 4.5.3.2; 4.5.3.3
Test/Inspection Report
Test Results
H001
DI-SESS-80639D
H
4.5.2
Engineering Change Proposal
Engineering/baseline Changes
J001
DI-TMSS-80527C
J
3.1.1.5
Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data
Tech Manuals

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AE, 0001AH, 0003AB, 0003AF, 0003AJ

B. EXHIBIT

A

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Report, Record of Meeting Minutes

3. SUBTITLE

Meeting Documentation

17. PRICE GRP

4. AUTHORITY

DI-ADMN-81505

5. CONTRACT REFERENCE

PWS Para 4.3.4; 4.3.6; 4.5.1

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
N/A
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.3.4; 4.3.6; 4.5.1. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 7 working days prior to the meeting. PWS para 4.5.1 submission shall be 45 working days after start of base/option period. The Government requires 3 working days for review and comments. The Contractor shall provide a final copy 2 working days after the Contractor acknowledges receipt of Government comments. The final submission shall be 1 day before the meeting.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

18Apr19

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AD, 0001AE,0001AG, 0003AE, 0003AF, 0003AH

B. EXHIBIT

B

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Contractor’s Configuration Management Plan

3. SUBTITLE

Configuration Management

17. PRICE GRP

4. AUTHORITY

DI-CMAN-80858B

5. CONTRACT REFERENCE

PWS Para 4.5.2; 4.5.3.2

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraphs 4.5.2; 4.5.3.2. The document shall be submitted and exchanged electronically using Microsoft ® Office Suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 15 working days after the Critical Design Review, System Acceptance Test and each baseline change. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AB, 0001AJ, 0003AA, 0003AB, 0003AC, 0003AK

B. EXHIBIT

C

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

Training Materials

3. SUBTITLE

Training Plan and Materials

17. PRICE GRP

4. AUTHORITY

DI-ILSS-80872

5. CONTRACT REFERENCE

PWS Para 3.3.1; 3.3.3.3

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

Once

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 3.3.1; 3.3.3.3. The document shall be submitted and exchanged electronically using Microsoft ® Word format and Contractor digital video format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 30 working days after the start of the base/option period for the training plan; 35 working days after the start of the option period for the training logistics plan; and 20 working days for the training materials prior to training period of performance start date for each phase. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments. Submission for all videos shall be 5 working days after each training course completion.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AD, 0001AE, 0003AE, 0003AF

B. EXHIBIT

D

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

D001

2. TITLE OF DATA ITEM

System/Subsystem Design Description (SSDD)

3. SUBTITLE

System Design

17. PRICE GRP

4. AUTHORITY

DI-ILSS-80872

5. CONTRACT REFERENCE

PWS Para 3.2.4; 4.5.1; 4.5.3.2

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

See blk 16

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 3.2.4; 4.5.1; 4.5.3.2. The document shall be submitted and exchanged electronically using Microsoft ® Word format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 10: Required after each Critical Design Review (CDR) and each System Acceptance Test (SAT)

BLK 12: The first submission shall be 20 working days after the CDR and the SAT. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E001

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Program Performance Report

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.3.2

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

Monthly

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.3.2. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 10 working days after the reporting month ends. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the period of performance ends.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E002

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Antiterrorism Level I Training Completion

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.7.2.1

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.7.2.1. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after the completion of the training. The Government requires 7 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Security Officer
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E003

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

iWatch Training Completion

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.7.2.3

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.7.2.3. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after the completion of the training. The Government requires 7 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Security Officer
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E004

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Operations Security Training Completion

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.7.3.2

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.7.3.2. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after the completion of the training. The Government requires 7 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Security Officer
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E005

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Threat Awareness and Reporting Program Training Completion

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.7.4

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.7.4. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after the completion of the training. The Government requires 7 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Security Officer
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E006

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Army Training Certification Tracking System Registration Verification

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.7.5.1

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.7.5.1. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after the completion of the registration. The Government requires 7 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E007

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Cybersecurity Awareness Training Completion

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.7.5.2

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.7.5.2. The document shall be submitted and exchanged electronically using the Microsoft ® Office product suite format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after the completion of the training. The Government requires 7 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002, 0004

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E008

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

DD250/WAWF Documentation

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.17

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.17. The document shall be submitted and exchanged electronically using PDF format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after final invoicing is complete in WAWF. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0003

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E009

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Certificate of Completion

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.18.1

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.18.1. The document shall be submitted and exchanged electronically using Microsoft ® Word format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 5 working days after final invoicing is complete in WAWF. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0003

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E010

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Services Completion Verification

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS Para 4.18.2

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

As Req.

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.18.2. The document shall be submitted and exchanged electronically using Microsoft ® Word format.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 10 working days prior to invoicing in WAWF. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Representative
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E011

2. TITLE OF DATA ITEM

Operations Security (OPSEC) Plan

3. SUBTITLE

OPSEC Plan

17. PRICE GRP

4. AUTHORITY

DI-MGMT-80934C

5. CONTRACT REFERENCE

PWS Para 4.7.3.1

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

Once

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information required by PWS paragraph 4.7.3.1. The document shall be submitted and exchanged electronically using the Microsoft ® Word format, or PDF format if applicable.

BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.

BLK 12: The first submission shall be 90 calendar days after contract award. The Government requires 5 working days for review and comments. The Contractor shall provide a final copy 5 working days after the Contractor acknowledges receipt of Government comments.

BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.

BLK 14: Name and electronic address of Government shall be specified at time of contract award

Government SAMD Security Officer
1*
1*
1*
* - Each submission.
15. TOTAL
1*
1*
1*

G. PREPARED BY

Dimitra Bairaktaris, 609-552-5943

H. DATE

18Apr19

I. APPROVED BY

Melvin Leary, Contracting Officer’s Representative 443-395-6909

J. DATE

DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA, 0001AH, 0003AB, 0003AJ

B. EXHIBIT

E

C. CATEGORY:

TDP___ TM____ OTHER ILSS X

D. SYSTEM/ITEM

Iraq Military Communications System

E. CONTRACTOR/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

E012

2. TITLE OF DATA ITEM

Technical and Management Work Plan

3. SUBTITLE

Program Management Plan

17. PRICE GRP

4. AUTHORITY

DI-MGMT-81117

5. CONTRACT REFERENCE

PWS Para 4.2.1; 4.2.2; 4.3.1; 4.3.3, 4.4

6. REQUIRING OFFICE

CECOM

18. ESTIMATED

TOTAL PRICE

Insert in Sect B

7. DD 250

DD

9. DIST STMT

REQUIRED

10 FREQ

See Blk 16

12. DATE OF

FIRST SUBMSN

See Blk 16

14. DISTRIBUTION

8. APP CD
N/A
11. AS
13 DATE OF

b. COPIES

A

OF DATE
SUBS SUBMSN
a. ADDRESSEE

Final

N/A
See Blk 16
Draft
Req
Repr

16. REMARKS

This document shall provide information…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .