EXHIBIT 2 SignedPSEPlanSet.pdf
PDF 15 MB Posted
- Attached to
- S&H Bridge Replacement
- Solicitation number
- 12837120R0022
About this file
This government file contains information for a federal contract solicitation to replace an existing timber bridge. The solicitation seeks a contractor to remove the existing 16'-10" timber bridge and abutments, and install a new 24'-1" span by 6'-6" rise aluminum box culvert. The culvert will be designed by the manufacturer, along with the headwall and wingwalls. The contractor will also construct reinforced concrete footings, install riprap protection around the structure, build a new road embankment over the existing road and new culvert, lay aggregate surfacing on the new road, install permanent signage, and barricade boulders to control user traffic. The solicitation was issued by the Department of Agriculture Forest Service R3-Southwestern Region as number 12837120R0022 for the S&H Bridge Replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DANNY
MONTOYA
Digitally signed by DANNY
MONTOYA
Date: 2020.04.06 09:11:27 -06'00'
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/6 /20
:1
1 P
ET
ER
LA
NE
C
:\U
SE
RS
\P
ET
ER
LA
NE
\D
OC
UM
EN
TS
\U
C
AR
SO
N
NF
B
RI
DG
ES
\S
AN
DH
\P
LA
NS
\20
S
H
PL
AN
S
RE
V.
DW
G;
R3
SOUTHWESTERN REGION
S&H ROAD BRIDGE
CARSON
NATIONAL FOREST
CAMINO REAL RANGER
DISTRICT
3/5/2020
JOHNSTON / LANE
J. JOHNSTON
P. LANE
G-01
NOTES
GENERAL NOTES
SPECIFICATIONS: THE WORK SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION
OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP 14 - US CUSTOMARY UNITS) AS MODIFIED FOR THIS
CONTRACT.
DESIGN: THIS STRUCTURE TO BE DESIGNED FOR HL-93 LOADING IN ACCORDANCE WITH AASHTO LFRD BRIDGE
DESIGN SPECIFICATIONS 8TH EDITION (REFER TO SPECIFICATION SECTION 603). THE CULVERT MANUFACTURER IS
RESPONSIBLE TO CONFIRM THAT THE CULVERT THICKNESS, AND MINIMUM COVER SHOWN MEET THEIR
REQUIREMENTS FOR THE HL-93 LIVE LOAD. STRUCTURAL BACKFILL ZONES IN ACCORDANCE WITH MANUFACTURER'S
DESIGN AND MINIMUM VALUES SHOWN ON DRAWINGS.
THE DESIGN DATA ARE AS FOLLOWS:
· BEARING PRESSURE WITH GEOGRID: 4000 PSF
· STRUCTURAL BACKFILL AND NATIVE SOIL UNIT WEIGHT: 140 PCF
· STRUCTURAL BACKFILL AND NATIVE SOIL ANGLE OF INTERNAL FRICTION: 30°
· ROADWAY DESIGN SPEED: 20 MPH
· DESIGN BOX CULVERT FOR MINIMUM COVER UNDER TRAFFIC = 1.4'
GEOTECHNICAL: SUB-SURFACE SOIL INVESTIGATION WAS LIMITED TO EXCAVATION OF TEST PITS. SEE SHEET C-01
FOR RESULTS OF TEST PIT ANALYSIS. OVEREXCAVATE ALL CLAY ENCOUNTERED AT FOUNDATION LEVEL AND
REPLACE WITH BACKFILL MATERIAL. SEE ALLOWANCE IN PAY ITEM 20850.
UTILITIES: THERE ARE NO KNOWN UTILITIES AT THIS SITE.
IN-STREAM WORK WINDOW: JUNE 15 - SEPTEMBER 30
HOURS OF OPERATION : NO FED HOLIDAYS OR WEEKENDS UNLESS APPROVED BY THE CO.
NOXIOUS WEED CONTROL: ALL CONSTRUCTION EQUIPMENT SHALL BE CLEANED AND POWER WASHED AND FREE OF
DIRT & DEBRIS PRIOR TO ENTRY ON NATIONAL FOREST LANDS.
ARCHEOLOGICAL SITES: SHOULD ARCHEOLOGICAL OR PALENTOLOGICAL REMAINS OR SPECIMENS BE DISCOVERED, SUSPEND OPERATIONS AT THE DISCOVERY SITE AND NOTIFY THE CO.
CLEARING LIMITS: CLEARING LIMITS ARE 10 FEET BEYOND CONTOURS OR EDGE OF IMPROVEMENTS SHOWN.
SALVAGE: ALL EXISTING MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED
FROM NATIONAL FOREST LAND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS.
EXCAVATION: THE CONTRACTOR MAY USE EXCESS EXCAVATION IF THE MATERIAL MEETS THE REQUIREMENTS OF
THE APPLICABLE STANDARD AND SUPPLEMENTAL SPECIFICATIONS. ANY EXCESS AND UNSUITABLE EXCAVATION
SHALL BE REMOVED FROM NATIONAL FOREST LAND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS.
REMOVAL IS INCIDENTAL TO 20801.
TOPSOIL: PRIOR TO EXCAVATION OR EMBANKMENT, TOPSOIL SHALL BE STRIPPED FROM THOSE AREAS TO A
MINIMUM DEPTH OF 4" AND STOCKPILED AS DIRECTED BY THE CO. FINISHED SLOPES SHALL RECEIVE 2"-3" OF
TOPSOIL TO THE EXTENT ALLOWED BY EVEN DISTRIBUTION OF THE STOCKPILE.
FOUNDATION FILL: REFER TO SPECIFICATION 208.
DEWATERING AND EROSION AND SEDIMENT CONTROL PLAN: SUBMIT BOTH DEWATERING AND EROSION AND
SEDIMENT CONTROL PLANS TO THE CO FOR APPROVAL AT LEAST 30 DAYS PRIOR TO BEGINNING THE WORK. SEE
SECTION 157 OF THE SUPPLEMENTAL SPECIFICATIONS FOR DETAILS. DO NOT PUMP WATER FROM EXCAVATIONS
DIRECTLY INTO THE LIVE STREAM.
· EROSION CONTROL DEVICES: LOCATIONS OF EROSION CONTROL DEVICES AND SEDIMENT BASINS SHALL BE
APPROVED BY THE CO. REFER TO SUPPLEMENT SPECIFICATION SECTION 157.
· SEEDING: SEED AND MULCH ALL DISTURBED SOIL NOT WITHIN TRAVELED WAY OF ROAD OR STREAMBED. USE
APPROVED SEED MIX AS REQUIRED IN SECTION 625 OF THE SPECIFICATIONS.
STAGING AREAS: STAGING AREAS SHALL BE APPROVED BY THE CO.
SHOP DRAWINGS: INCLUDE THE FOLLOWING: LOADING CRITERIA, MATERIAL PROPERTIES, MINIMUM AND MAXIMUM
COVER, AND INSTALLATION REQUIREMENTS. CO APPROVAL OF THE SHOP DRAWINGS IS FOR QUALITY ASSURANCE
PURPOSES. THE CONTRACTOR IS RESPONSIBLE FOR THE CONFORMANCE OF ALL MATERIALS AND WORKMANSHIP
WITH CONTRACT REQUIREMENTS.
TRAFFIC CONTROL: CONTRACTOR SHALL UTILIZE R11-2 SIGN MOUNTED ON A TYPE III BARRICADE AT THE BEGINNING
OF ROAD 478 TO BLOCK TRAFFIC DURING CONSTRUCTION OPERATIONS.
CONCRETE: USE CLASS A(AE) CONCRETE FOR CAST-IN-PLACE MEMBERS. THE REQUIRED 28-DAY COMPRESSIVE
STRENGTH (F'c) IS 4,500 PSI WITH AN ENTRAINED AIR CONTENT OF 5% ± 1%. FINISH ALL PRECAST ELEMENTS WITH AN
ORDINARY SURFACE FINISH. MAKE ALL CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. CHAMFER ALL
EXPOSED EDGES OF CONCRETE 3/4".
REINFORCING STEEL: USE REINFORCING STEEL OF THE DEFORMED TYPE CONFORMING TO AASHTO M31 (ASTM
A615) GRADE 60. CUT AND BEND REINFORCING STEEL IN CONFORMANCE WITH ACI 315. LAP SPLICE BARS 2' MIN.
HARDWARE AND STRUCTURAL STEEL: HARDWARE SHALL MEET ASTM A307 OR ASTM 449 AND BE GALVANIZED
ACCORDING TO ASTM A123.
HYDROLOGY AND HYDRAULICS: THESE STRUCTURES ARE DESIGNED TO PASS THE 100-YEAR FREQUENCY FLOOD.
FLOW DATA IS SHOWN ON THIS SHEET.
PAY ITEM NOTES
15201: BRIDGE SURVEY AND STAKING FOR BOX CULVERT INCIDENTAL AND IN ACCORDANCE WITH TABLE 152-1
20407: CLEARING AND GRUBBING AND CONSERVING TOPSOIL INCIDENTAL
20850: ALLOWANCE, SEE GEOTECHNICAL NOTE THIS SHEET
25102: GEOTEXTILE INCIDENTAL
27250: BACKFILL WITH AASHTO M43 #67 AND GEOTEXTILE INCIDENTAL
60305: HEADWALLS AND WINGWALLS INCIDENTAL
62502: MULCH INCIDENTAL
File details come from the government source that posted it. Updated .