Everglades_Filters.pdf
PDF 351 KB Posted
- Solicitation number
- 140P5424Q0021
About this file
This document consists of the requirements specifications for purchasing membrane filters for the wastewater treatment plants at Everglades National Park, as well as a related federal contract opportunity.
The National Park Service is seeking to procure 57 Membrane Bioreactor (MBR) filters for the Pine Island and Flamingo wastewater treatment plants in Everglades National Park. The required filters are DuPont MBR B40N SPT or equal, and must be delivered within 120 days of contract award. This solicitation is a 100% small business set-aside, and quotes are due by 4:30 PM EST on May 17, 2024. The contract will be awarded by the Department of the Interior National Park Service Southeast Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5424Q0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVERGLADES NATIONAL PARK
Requirement Specifications
Membrane Bioreactor (MBR) Filters
NATIONAL PARK SERVICE
BACKGROUND
This project is for purchasing the membrane filters at the Flamingo and Pine Island wastewater treatment plants. Everglades National Park (ENP) is required by State of Florida’s Department of Environmental Protection (DEP) for the treatment of wastewater collected, processed and discharged back to the environment. This wastewater must be treated and processed. A major part of that process is filtration. The Membrane Bioreactor (MBRs) use specialized filters to clarify the treated wastewater to the required standards.
SITE LOCATION
NOTE: Two locations within Everglades National Park (call park's point of contact for delivery logistics, if needed).
Pine Island District Wastewater Treatment Plant: (PIWWTP) Everglades National Park 40001 State Road 9336 Homestead, FL 33034 Location: 25°23'01.8"N 80°35'40.0"W
Flamingo Wastewater Treatment Plant: (FLWWTP) Everglades National Park 40001 State Road 9336 Homestead, FL 33034 Location: 25°09'00.1"N 80°55'30.8"W
CONTRACTOR REQUIREMENTS
The contractor will supply the filters to the park. The park’s utilities crew will remove the old filters and install the new units.
Provide Filters:
Dupont MBR B40N SPT Modules or equal Quantity Required:
21 filters - Pine Island PIWWTP 36 filters - Flamingo FLWWTP
Total: 57 filters
DELIVERABLES
The contractor will provide the noted filters and quantity within 120 days or sooner of contract award.
Delivery hours: Monday through Friday, from 8:00 AM to 3:30 PM .
File details come from the government source that posted it. Updated .