Event_18622_Exhibit_D_-_Price_Schedule.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 2000018622
- Issued by
- Minnesota
About this file
This is a Price Schedule exhibit for a Request for Proposal issued by the Minnesota Department of Transportation through the Department of Administration for E-ZPASS Toll Lane System Equipment and Installation services. The project involves procuring Radio Frequency Identification (RFID) technology and installation services to implement a new Minnesota E-ZPASS Express Lanes roadside system on I-35E and I-394. The system must support Minnesota's current SeGo RFID protocol as well as both TDM and 6C protocols to enable Electronic Toll Collection interoperability. Responders must provide pricing for all line items including RFID reader hardware and software, antenna lane kits, maintenance support at multiple tier levels, traffic control, spare parts, documentation deliverables, factory acceptance testing, training, and comprehensive installation and support services for both corridor locations. Questions and clarifications must be submitted in writing to the designated Acquisitions Management Specialist by September 24, 2026, and all responses must be submitted electronically through the SWIFT Portal. The resulting contract is designated as Master Contract M-564 and will be established on an ongoing basis to support Minnesota E-ZPASS operations.
Responders must submit unit prices for all line items to be considered for award. Pricing is requested for individual components such as RFID readers, antennas, GPS modules, and power supplies on a per-unit basis, as well as labor rates for Tier 1 hourly support and Tier 2 daily support with fully loaded rates. Line items 15 and 16 request lump-sum pricing for complete installation and support services at the two corridor locations, each including all labor, hardware, equipment, maintenance of traffic, travel expenses, permits, licenses, bonds, protocol configuration, commissioning and operational testing, and delivery of operations and maintenance documentation. Maintenance support services will be provided on a time-and-materials basis, while Tier 2 direct expenses are limited to non-local travel and will include lodging and meal costs incurred during on-site work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 - Unit Price Detail (Transp) Event G0210-2000018622
| Price Shedule A |
| Minnesota Department of Transportation |
| E-ZPASS Toll Lane System Equipment and Installation Transponders |
| Responders must provide a price for all line items on the Price Schedule in order to be considered for an award. | |||||
| ITEM | DESCRIPTION | COMMENT | QTY | UNIT | UNIT PRICE |
| RFID Reader Hardware & Software | ||||
| 1 | Multi-Protocol RFID AVI Reader w/ Required Protocol Licenses for Contractor Proposed Protocol, SeGO, 6C and TDM (E-ZPass) | 1 | EA | |
| 2 | Antenna Lane Kit | 1 | EA | |
| Maintenance Support* | ||||
| 3 | Tier 1 Hourly Labor Rate | Fully Loaded Hourly Rate | 1 | HR |
| 4 | Tier 2 Daily Labor Rate | Fully Loaded Daily Rate | 1 | Day |
| 5 | Tier 2 Daily Direct Expense** | All Inclusive Daily Rate for Direct Expenses. | 1 | Day |
| 6 | Traffic Control | Per lane restriction/closure | 1 | EA |
| 7 | Bucket Lift Truck (including driver) | Daily | 1 | Day |
| Spare Parts | ||||
| 8 | GPS Module; if needed | 1 | EA | |
| 9 | Reader Power Supply - 120 VAC operation | 1 | EA | |
| 10 | Antenna Multiplexer (if needed) for reversible lane antennas | 1 | EA | |
| Documentation | ||||
| 11 | Pre-Installation Deliverables: | 1 | LS | |
| - RFID Interface Control Document | ||||
| - RFID Reader & Antenna Operators Manual | ||||
| - Test Plan(s) and Script(s) | ||||
| - Training Plan | ||||
| Professional Services | ||||
| 12 | Factory Acceptance Testing | 1 | LS | |
| 13 | Factory Acceptance Testing - Travel Costs for MnDOT Staff | 1 | LS | |
| 14 | Training | 1 | LS | |
| Installation & Support Services | ||||
| 15 | Labor, Hardware, Equipment and Maintenance of Traffic (MOT) | 1 | LS | |
| Includes all labor, maintenance of traffic, travel expenses, permits, licenses, Payment and Performance Bonds, RFID Equipment, tools and ancillary devices to complete the replacement corridor installations for I-394.C36 Includes all protocol configuration, Commissioning Testing, 30-Day Operational Testing and any required protocol license as specified in the contract.* Includes delivery of approved Operations & Maintenance Manual and As-Built Drawings | ||||
| 16 | Labor, Hardware, Equipment and Maintenance of Traffic (MOT) | 1 | LS | |
| Includes all labor, maintenance of traffic, travel expenses, permits, licenses, Payment and Performance Bonds, RFID Equipment, tools and ancillary devices to complete the replacement corridor installations for I-35E. Includes all protocol configuration, Commissioning Testing, 30-Day Operational Testing and any required protocol license as specified in the contract.* Includes delivery of approved Operations & Maintenance Manual and As-Built Drawings | ||||
| * Maintenance Support to be provided on a time and materials basis. See Exhibit C: Specifications, Duties, and Scope of Work. | ||||
| ** Direct Expenses for Tier 2 support shall include all travel, lodging and meal expenses required for each day of travel while on-site. Direct Expenses will only be allowed for non-local travel. See Exhibit C: Specifications, Duties, and Scope of Work. |
Name of Responding Contractor (company/entity name)
File details come from the government source that posted it. Updated .