EvaluationCriteria.pdf
PDF 275 KB Posted
- Attached to
- B-2 Landing Gear Valve, Regulation, FL
- Solicitation number
- FA820325Q0003
About this file
This document is an Evaluation Criteria for Award for Solicitation FA8203-25-Q-0003, using a Lowest Price Technically Acceptable (LPTA) methodology. The solicitation requires a B-2 Landing Gear Valve, Regulation, FL, with evaluation based on two primary factors: Price and Technical Acceptability. For pricing, only the "Unit Price" for CLIN 0001AB (Production Article) will be evaluated, ensuring fairness for vendors with and without First Article requirements. Technical acceptability comprises three subfactors: (a) Approved Source, with seven pre-approved manufacturers including KDL Precision Molding Corp and Thomas Instrument Incorporated, (b) Required Delivery Schedule conforming to solicitation timelines, and (c) Subcontracting Plan for large businesses, which must meet FAR and DFAR requirements. The document notes that in the event of a post-award MICAP upgrade, delivery schedules may be expedited via bilateral contract modification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA820325Q0003 Contract ACPS.pdf | ||
| ENGINNER DATA LIST.pdf | ||
| MQR.pdf | ||
| PACKAGING REQUIRMENTS.pdf | ||
| Bid Set.pdf | ||
| CDRL FA REPORT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION CRITERIA FOR AWARD
SOLICITATION: FA8203-25-Q-0003
For purposes of award, offers will be evaluated based on the Lowest Price Technically Acceptable
(LPTA).
Factor 1 - Price The “Unit Price” for “CLIN 0001AB – Production” will be evaluated as the Total Evaluated Price (TEP). Note, this DOES NOT include the extended price (i.e. unit price x quantity) – only the “Unit Price” for “CLIN 0001AB – Production”. This is necessary to ensure integrity, balance and fairness in the competition considering some offerors may be required to complete a First Article and other offerors may have a First Article waiver approved. This process will neither penalize or favor a proposal based on whether a First Article is required or waived because ALL offerors are required to complete the “CLIN 0001AB – Production” requirements. Therefore, the lowest “Unit Price” for “CLIN 0001AB – Production” is determined to represent the best value to the Government. An example of the TEP evaluation is provided below for reference.
CLIN DESCRIPTION PROPOSED “UNIT PRICE”
0001 1680016917833LE $ N/A
0001AA First Article Test Report $ N/A 0001AB Production Article $ (unit price only)
TOTAL EVALUATED PRICE $
Note: In the event the priority of the basic award and/or option(s) is upgraded to a MICAP post-award, the Government may require the delivery schedule to be expedited. The expedited delivery schedule and any resulting price increase will be negotiated and established via a bi-lateral contract modification.
Factor 2 – Technical Acceptability Technical Acceptability will consist of three subfactors – (a) Approved Source, (b) Required Delivery Schedule, (c) Subcontracting Plan.
(a) Subfactor 1 - Approved Source:
Technical Acceptability will be evaluated by the offeror being listed as an approved source. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. List of approved source(s) is provided below.
Approved Source(s) Cage Code
KDL Precision Molding Corp 0n9z9 DA/ Pro Rubbing Inc 19332 DA/ Pro Rubbing Inc 3A4T2 Thomas Instrument Incorporated 50lp4 Duro-Flex Products Inc. 53481 Number, Inc. 54297 Thomas Instrument Incorporated 5H860
Alternate sources shall refer to the attached “Manufacturing Qualification Requirements (MQR)” for procedures that must be satisfied to become an approved source for this requirement. Award of the subject solicitation MAY NOT BE DELAYED due to alternate sources notifying the appropriate government contracting office of intent to qualify as an approved source for this requirement.
(b) Subfactor 2 - Required Delivery Schedule:
Technical Acceptability will be evaluated by the offeror submitting as part of their proposal a delivery schedule for the basic award (and options if applicable) that is “on or before the required delivery schedule” identified in the “Schedule” (i.e. CLINs) of the solicitation.
(c) Subfactor 3 –Subcontracting Plan:
Technical Acceptability, in the event the offeror is considered a large business, will be evaluated by the offeror submitting as part of their proposal a Subcontracting Plan that is deemed acceptable. The Government Contracting Officer (CO) will evaluate the plan for adequacy IAW FAR and DFAR requirements. The Subcontracting Plan will be incorporated into the resulting contract upon award.
File details come from the government source that posted it. Updated .