ESBD_File_341180_RFP 24-11 Elevator Maintenance Services, ESBD.pdf

PDF 140 KB Posted

Attached to
Elevator Maintenance Services
Solicitation number
RFP24-11
Issued by
Harris County, Pasadena City, Texas

About this file

This document is a Request for Proposals (RFP) issued by the San Jacinto Community College District (SJCCD) in Texas to solicit bids from qualified firms to provide elevator maintenance services district-wide. The RFP outlines the scope of work, which includes maintaining the entire vertical transportation systems, performing all necessary engineering, labor, testing, and inspections. The maintenance work must be conducted by the Contractor's technicians and mechanics who are directly employed and supervised. The proposed solicitation schedule provides key dates, including the RFP issuance on October 31, 2023, a non-mandatory pre-proposal meeting on November 8, 2023, a deadline for questions and clarifications on November 13, 2023, and the proposal submission deadline on November 21, 2023. The contract award is expected to be approved in January 2024.

The RFP specifies additional requirements, warranty terms, contractor performance standards, work hours, response times, and service call reporting. The College also requires supplier diversity reporting. The contract opportunity covers the jurisdictions of Harris County and the City of Pasadena in Texas. No other pricing, set-aside, or funding details are provided in the document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 24-11 Elevator Maintenance Services 1

REQUEST FOR PROPOSALS (RFP) #24-11

Elevator Maintenance Services

PROPOSED SOLICITATION SCHEDULE

This schedule may be modified or changed at the sole discretion of SJCCD.

DATE ACTION

October 31, 2023 RFP issued.

November 8, 2023

Pre-Proposal Meeting (Non-Mandatory)

Non-mandatory pre-proposal meeting 10:00 a.m. Central Time, San Jacinto College Central Campus, 8060 Spencer Hwy, Bldg.

C1.230, Pasadena, Texas 77505

November 13, 2023

Questions and/or Clarifications Deadline

Requests for questions and clarifications regarding RFP documents shall be submitted through the Questions tab in IonWave by 5:00 p.m. Central Time to be considered.

November 15, 2023 Issuance of final addendum, if necessary.

November 21, 2023

Proposal Submission Deadline

All proposal documents shall be submitted before 2:00 p.m. Central Time in IonWave.

Proposals will be digitally opened immediately following time due.

January 2024 Recommendation of award and approval to enter into contract.

Award will be announced after approval received.

IonWave:

https://sanjac.ionwave.net

PROCUREMENT CONTACT

Genie Scholes, Facilities Buyer

281-998-6349 genevieve.scholes@sjcd.edu https://sanjac.ionwave.net/ mailto:genevieve.scholes@sjcd.edu

RFP 24-11 Elevator Maintenance Services 2

SCOPE OF WORK AND SPECIFICATIONS

1. General

San Jacinto Community College District (“SJCCD” or “College”) is soliciting sealed proposals from qualified firms to provide elevator maintenance service district-wide.

All work performed must be in compliance with existing federal, state and local codes, statutes and requirements.

SJCCD is a public community college district organized under Chapter 130 of the Texas Education Code and is tax exempt in the State of Texas.

2. Scope of Work

This scope of work covers the requirements to provide SJCCD with elevator maintenance service, which shall include, but is not limited to the following:

2.1 The entire vertical transportation systems shall be maintained as hereinafter described, in accordance with the following detailed terms. Contractor’s trained employees shall use all reasonable care to keep the systems in proper adjustment and in safe operating condition, in accordance with all applicable codes, ordinances, standards and regulations. Terms and requirements are specified in the singular with the understanding that all provisions shall be applicable to all units indicated unless otherwise specified.

2.2 With the exception of only those items specifically identified as being performed by others, specifications are intended to include all engineering, material, labor, testing, and inspections needed to achieve the work specified.

2.3 Maintenance work shall be performed only by technicians and mechanics directly employed and supervised by the Contractor, who are experienced and skilled in maintaining vertical transportation units similar to those to be maintained at SJCCD and shall not be assigned or transferred to any agent or subcontractor without the express consent of the College.

1. General
2. Scope of Work
16 Additional Requirements
17 Warranty Requirements
18 Contractor Performance
19 Work Hours
20 Response Time
21 Service Call Report
22 Supplier Diversity Reporting
23 Special Requirements

File details come from the government source that posted it. Updated .