Gov ContractsLibrarySubscription-JOFOC signedredacted _Redacted.pdf
PDF 163 KB Posted
- Attached to
- Government Contracts Library Plus Subscription
- Solicitation number
- EQWPHCD-21-0004
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION FOR OTHER THAN
FULL AND OPEN COMPETITION
41 U.S.C. 253(c)
In accordance with Federal Acquisition Regulation 13.106-1(b) (1), I hereby determine that the
Government Contracts Library Subscription on EQWPHCD-21-0004 is required through a sole source procurement and competition is precluded for the reasons indicated below.
Please select the appropriate statutory authorities in accordance with FAR Part 6.302, Circumstance
Permitting Other Than Full and Open Competition:
X FAR 6.302-1 Only one responsible sources and no other supplies or services will satisfy agency requirements;
FAR 6.302-2 Unusual and Compelling Urgency;
FAR6.302-3 Industrial Mobilization; Engineering, Development, or Research Capability;
or Expert Services;
FAR 6.302-4 International Agreement;
FAR 6.302-5 Authorized or Required by Statute;
FAR 6.302-6 National Security; or
FAR 6.302-7 Public Interest.
1. Identification of the Agency and the Contracting Activity
This requirement is in support of the General Services Administration (GSA), Public Buildings
Services (PBS), Office of Acquisition Management Policy and Programs, 1800 F Street, NW
Washington, D.C. 20005.
2. Nature and/or description of the action being approved
Pursuant to the authority of the Competition In Contracting Act (CICA) as implemented by
Federal Acquisition Regulation (FAR) Subpart 6.302 and GSA Acquisition Manual (GSAM)
506.3 for justifying other than full and open competition, the GSA intends to award a contract to
Wolters Kluwer.
3. A description of the supplies or services required to meet the agency’s needs (including the estimate value)
Government Library Contracting membership will be established by PBS Office of Acquisition
Management Policy and Programs division. This membership will allow selected regional 1102’s access to the Cheetah ™ system for acquisition research.
The membership plan is at a cost of $ for the base year and
$ for Base year: 10/01/21 - 9/30/22
$ for Option Year 1: 10/01/22 - 9/30/23
$ for Option Year 2: 10/01/23 - 9/30/24
$ for Option Year 3: 10/01/24 - 9/30/25
$ for Option Year 4: 10/01/25 - 9/30/26
4. An identification of the statutory authority permitting other than full and open competition
In accordance with 41 U.S.C. 253(c) and/or 10 U.S.C. 2304(c), GSA has determined that the procurement requires a sole source in order to satisfy the Agency’s need. Specifically, the basis for other than full and open competition is that GSA in accordance with FAR 6.302- Only one responsible source and no other supplies or services will satisfy agency requirements.
5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited
Wolters Kluwer as an exclusive provider of the Government Contracts Library and all rights and privileges associated with the membership shall belong to the General Services Administration (GSA) and not individual employees. All GSA employees chosen as representatives under the member-level membership will have the right to participate in the GSA member-level membership.
6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable. Including whether a notice was or will be publicized as required by
Subpart 5.2 and, if not, which exception under 5.202 applies
This is a membership to a group within Wolters Kluwer. We can only buy this membership from Wolters
Kluwer and therefore no other Offerors are practical to solicit for this need. Notice of the intent of award will be published via FBO and the JOFOC will be attached.
7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable
The IGE costs of represent a fair and reasonable value to the government based on market research. The total contract value for the base year and four subsequent option years is $
8. A description of the market research conducted (see part 10) and the results or a statement of the reason market research was not conducted
The following steps were performed in order to conduct market research before sole sourcing:
Internet research and GSA schedule search was conducted and no other sources were found.
9. Any other facts supporting the use of other than full and open competition
N/A
Washington, DC signature
10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition
11. A statement of actions, if any, that agency may take to remove or overcome any barriers to competition before any subsequent for the supplies or services required
***NOTE: If sole sourced procurements need to be recompeted in the future, Federal regulations prevent the Contracting Office from reprocuring these requirements through means of a sole source during the recompete.***
Program/Technical Official Certification:
I hereby certify and accept the responsibility that any and all supporting data provided above or used to justify the above requested for a sole source procurement (e.g., verifying the Government’s minimum needs, schedule requirements, and/or other rationale for other than full and open competition) is accurate and complete to the best of my personal knowledge and belief.
Digitally signed by James Gregory
DN: CN=James Gregory, E=james.gregory@gsa.gov Reason: I am the author of this document Location: your signing location here Date: 2021.09.17 11:38:52-04'00' Foxit PhantomPDF Version: 10.1.3
James Gregory Date
Project Manager
PBS Office of Acquisition Management Policy and Programs
Contracting Officer’s Certification
I hereby certify that the information contained in this Justification for Other than Full and Open
Competition, is accurate and complete to the best of my knowledge.
Laurie Schimmel
Laurie Schimmel I am approving this document with my legally binding
2021.09.20 16:14:21-04'00'
Laurie Schimmel Date
Contracting Officer
James Gregory mailto:E%3Djames.gregory@gsa.gov
| X FAR 6.302-1 Only one responsible sources and no other supplies or services will satisfy agency requirements; |
| FAR6.302-3 Industrial Mobilization; Engineering, Development, or Research Capability; or Expert Services; |
| FAR 6.302-5 Authorized or Required by Statute; FAR 6.302-6 National Security; or |
| 1. Identification of the Agency and the Contracting Activity |
| 3. A description of the supplies or services required to meet the agency’s needs (including the estimate value) |
| 5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited |
| 6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable. Including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies |
| 7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable |
| 8. A description of the market research conducted (see part 10) and the results or a statement of the reason market research was not conducted |
| Internet research and GSA schedule search was conducted and no other sources were found. |
| 10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition |
| 11. A statement of actions, if any, that agency may take to remove or overcome any barriers to competition before any subsequent for the supplies or services required |
File details come from the government source that posted it. Updated .