JOFOC_-_cife.pdf

PDF 294 KB Posted

Attached to
Center for Integrated Facility Engineering (CIFE) Organizational Membership
Solicitation number
EQIPSA-16-5063
Issued by

About this file

CIFE JOFOC

View the file

Other files

File Type Posted
CIFE_2016_Requirements_Doc.pdf PDF
Req._Doc_-_CIFE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR OTHER THAN

FULL AND OPEN COMPETITION

41 U.S.C. 253(c) and 10 U.S.C. 2304(c)

In accordance with Federal Acquisition Regulation 13.1061(b) (1), I hereby determine that the CIFE (Center for Integrated Facility Engineering) on <Insert Procurement Request Number> is required through a sole source procurement and competition is precluded for the reasons indicated below.

Please select the appropriate statutory authorities in accordance with FAR Part 6.302, Circumstance Permitting Other Than Full and Open Competition:

X FAR 6.3021 Only one responsible sources and no other supplies or services will satisfy agency requirements; FAR 6.3022 Unusual and Compelling Urgency; FAR6.3023 Industrial Mobilization; Engineering, Development, or Research Capability; or Expert Services; FAR 6.3024 International Agreement; FAR 6.3025 Authorized or Required by Statute; FAR 6.3026 National Security; or FAR 6.3027 Public Interest.

1. Identification of the Agency and the Contracting Activity This requirement is in support of the General Services Administration (GSA), Public Buildings Services (PBS), PB ITS, 1800 F Street, NW Washington, D.C. 20005.

2. Nature and/or description of the action being approved Pursuant to the authority of the Competition In Contracting Act (CICA) as implemented by Federal

Acquisition Regulation (FAR) Subpart 6.302 and GSA Acquisition Manual (GSAM) 506.3 for justifying other than full and open competition, the GSA intends to award a contract to Stanford University.

3. A description of the supplies or services required to meet the agency’s needs (including the estimate value)

CIFE organizational membership will be established by Central Office PBS Program Offices. This membership will allow Facilitated Recruiting of Graduate Students, Summer Program (6 Tuitionfree days), Discounted Rates for CIFE Conferences, Discounted Group Rate for VDC Certificate Program, Web Site Access (PasswordProtected Sections), Member Bulletin, Technical Reports, Membership on Technical Committees (TAC) for up to 3 people, and Membership on the Industry Advisory Board (IAB) for one person.

Although the use of miniinternships and a visit from a faculty or staff member is available at this level of membership, this agreement specifically excludes the use of miniinternships and a visit from a faculty member. However, the overall benefits of the CIFE membership still warrant membership at the "Member" level.

The membership plan is at a cost of $35,000 for the base year and $35,000 for each of three subsequent option years, for a total contract value of $140,000:

$35,000 for Base year: 9/30/2016 – 9/29/2017 $35,000 for Option Year 1: 10/1/2017 – 9/30/2018 $35,000 for Option Year 2: 10/1/2018 – 9/30/2019 $35,000 for Option Year 3: 10/1/2019 – 9/30/2020

4. An identification of the statutory authority permitting other than full and open competition In accordance with 41 U.S.C. 253(c) and/or 10 U.S.C. 2304(c), GSA has determined that the procurement requires a sole source in order to satisfy the Agency’s need. Specifically, the basis for other than full and open competition is that GSA in accordance with FAR 6.302 Only one responsible source and no other supplies or services will satisfy agency requirements.

5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited Stanford University’s Center for Integrated Facility Engineering (CIFE) is an academic research center and all rights and privileges associated with the membership shall belong to the General Services Administration (GSA) and not individual employees. All GSA employees chosen as representatives under the memberlevel membership will have the right to participate in the GSA memberlevel membership, including the use of prototype software, online training, publications, discounted rates to membership events, and participation in advisory groups.

6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable. Including whether a notice was or will be publicized as required by Subpart

5.2 and, if not, which exception under 5.202 applies This is a membership to a group within Stanford University. We can only buy this membership from Stanford University and therefore no other Offerors are practical to solicit for this need. Notice of the intent of award will be published via FBO and the JOFOC will be attached.

7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable The IGE costs of $35,000 represents a fair and reasonable value to the government based on market research, historical procurement data, and/or specific industry knowledge by the technical representative. The total contract value for the base year and three subsequent option years is $140,000.

8. A description of the market research conducted (see part 10) and the results or a statement of the reason market research was not conducted The following steps were performed in order to conduct market research before sole sourcing:

Internet research was conducted and no other sources were found.

9. Any other facts supporting the use of other than full and open competition

N/A

10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition N/A

11. A statement of actions, if any, that agency may take to remove or overcome any barriers to competition before any subsequent for the supplies or services required N/A

***NOTE: If sole sourced procurements need to be recompeted in the future, Federal regulations prevent the Contracting Office from reprocuring these requirements through means of a sole source during the recompete.***

Program/Technical Official Certification:

I hereby certify and accept the responsibility that any and all supporting data provided above or used to justify the above requested for a sole source procurement (e.g., verifying the Government’s minimum needs, schedule requirements, and/or other rationale for other than full and open competition) is accurate and complete to the best of my personal knowledge and belief.

X

Jon Owens Date Program Expert

PB ITS

Contracting Officer’s Certification

I hereby certify that the information contained in this Justification for Other than Full and Open Competition, is accurate and complete to the best of my knowledge.

<Name> Date Contracting Officer

File details come from the government source that posted it. Updated .