Judge Rice Courtroom Lighting Project
Solicitation number
EQ5P2SS2P1-18-0005
Issued by

About this file

This amendment hereby incorporates responses to Request for Information and incorporates additional requirements. It also includes the pre-proposal agenda and sign-in sheet for the conference held on May 17th. The solicitation due date is Friday, June 15th by 4:00pm (Eastern Time).

View the file

Other files

File Type Posted
Amendment_02-edited.pdf PDF
Signed_Amendment_01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED 16C. DATE SIGNED

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

5P1QCC

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Request for Proposal-EQ5P2SS2P1-18-0005-Judge Rice Courtroom Lighting Project at the Dayton Federal Building and US Courthouse, 200 West Second Street, Dayton OH. 45402

This amendment hereby incorporates responses to Request for Information and incorporates additional requirements.

It also includes the pre-proposal agenda and sign-in sheet for the conference held on May 17th. Please see attached. The solicitation due date is Friday, June 15th by 4:00pm (Eastern Time).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

N

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

5P1QCC

General Services Administration Acquisition Management Division 230 South Dearborn, Room 3500 Chicago, IL. 60604

Same as Box 6

EQ5P2SS2P1-18-0005

EQ5P2SS2P1-18-0005

3. EFFECTIVE DATE

06/11/2018

05/09/2018

X X

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice; Properly destroy documents when no longer needed

General Services Administration Public Buildings Service

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR

SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED

Project: Judge Rice Courtroom Lighting Date: 6/5/2018 RFI Questions and Answers

- What is the performance period? 90 days performance period as stated in the RFP.

- How often would work stop do to loud noise? As directed in the courts. It does not happen very often, but it is important to note that court does take place on the same floor. All known loud activities should happen after hours.

- Dumpster location? The building will provide a space in the dock area big enough for one 30 yard dumpster. All other equipment the contractor wishes to be stored at the dock must fit in that foot print. No other space is available on the dock.

- Asbestos abatement? We are in the process of having materials above ceiling tested. If those results come back prior to the bid due date we will share. If not assume that no hazardous materials exist.

- Secondary site visit? Needs to be coordinated and would be an organized visit with all bidders requesting one on one.

- Projected start date? We are estimating the project award around 7/27/2018, with the onsite notice to proceed around 9/14/2018, giving time for security clearances and submittals between award and onsite NTP.

- Security clearance time frame? Typically 6 weeks for a full tier 1 clearance. There are other clearance options that have a shorter timeframe, but those are for people that will not be required to be onsite for the duration of the project.

- Contractor parking? Offsite parking for construction employees. No onsite parking will be provided. Drop offs at the dock for tools and materials are allowed.

- If a person is cleared with EPA is that compatible with GSA? Other agency badges are separate from GSA and will need to go through the GSA security clearance process.

People that are cleared with GSA will still need to submit a CIW to update their working record.

- Storage of material will be on project material? There is limited storage space in building.

The jury assembly room can be utilized for storage as long as it is returned to the exact condition it was at the start of the project.

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice; Properly destroy documents when no longer needed

General Services Administration Public Buildings Service

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR

SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED

- Is the courtroom humidified? As well as the rest of the building. No excess humidity has been found.

- Is the judge set on these fixtures? What is the basis of design so everyone is bidding the same? Any approved equal fixtures shall be submitted prior to bidding so everyone is bidding the same fixtures. Otherwise bid the basis of design fixture.

- What is the ADA height for the light switches? Should be in the specs, but leave that for construction.

- Artwork, who is the curator that could safely remove the artwork? The courts will contract the courts curator for the removal of the artwork. This is no longer in the contractor’s scope for this bid. The courts prefer Patterson Chase Co. Mark Steinke, Director of Marketing for Patterson Chase, 937-293-8766 (store), 937-269-7557 (cell)

- How far is it from the dock to the freight elevator? Approximately 150 feet

- Can the historical lamps be removed for protection versus building a box around them?Yes, but it will be the responsibility of the contractor to remove and protect throughout removal and reinstallation.

- Will the wood walls need to be protected throughout construction? Yes.

- What is the “control station” for lighting? Switch plate sized slave unit.

- Can the design rendering be shared to show final intent? Yes, they will be issued with question responses.

- Evening & Weekend Work, for Noise Activities and Other Allowed without additional cost to GSA. A change order for a price increase will not be allowed due to unexpected labor to occur after hours. Your proposed price should include the possibility of after-hours work.

- Bid Addressee is Johanna N? or Jordan W? If submitting electronically, email Jordan.waldschmidt@gsa.gov and CC johanna.nieves@gsa.gov. If submitting by US Mail, address to Jordan Waldschmidt.

- Please specify any light switches or receptacles that need to be moved, within walnut wood paneling, hopefully this will be considered and “as is” condition and not be required. All existing switch and outlet covers will remain as is unless noted otherwise in the construction documents.

- Will the government consider extending the bid date? Yes as required to inform all bidders of RFI answers. A formal notice will be sent out in that event.

mailto:Jordan.waldschmidt@gsa.gov mailto:johanna.nieves@gsa.gov

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice; Properly destroy documents when no longer needed

General Services Administration Public Buildings Service

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR

SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED

- What are the standard business hours of the facility? 6 am – 6 pm

- Please confirm whether we are to salvage the existing speakers or provide new? Provide new speakers – refer to sheet E100.

- (A100 General note B) How far is the existing deck above the ceiling? Deck is approximately 20’-0” AFF.

- (A100 General note B) What are the specifications or basis of design on the existing fire proofing? None available – FP contractor to provide patch material to comply with deck rating requirements.

- (A100 Keynote line item 1) Extend plaster to provide hard edge to acoustical ceiling? This is not shown on detail A/301. Please confirm your exact requirements together with a specification for the plaster? This is shown in detail 3/A301. Contractor can use gypsum board and finish compound.

- (G001 Line item E) Please confirm based on drawing G001 line item E – remove all loose furnishings. Please confirm a location for the storage of all these items. Per discussion in pre-bid meeting, loose furnishings are to be stored in courtroom in areas where work is not being performed. Some small items may be able to be stored in the adjacent Jury Room.

- (G001 Line item E) Please confirm that any wall protection will require fire rated poly sheeting. Protection materials are contractor’s responsibility – all materials used must meet interior finish flame spread and smoke development requirements.

- (MED100) Drawing MED100 drawing notes 11 existing camera to be relocated. Is there an approved contractor that we have to use for this work? No.

- Please confirm the required number of coats of paint required on the new and existing plaster? Paint is a 3-coat system (prime, intermediate and top coat) for new and existing plaster. Use gypsum board paint system in paint specs.

- Please confirm the specification for the stain of the new millwork and including the number of coats? Match color and finish of stain on existing woodwork on walls. Number of coats as required to achieve matching.

- Please confirm that we can use the owner’s freight elevator? Confirmed. All use needs to be coordinated with property management

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice; Properly destroy documents when no longer needed

General Services Administration

Public Buildings Service

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR

SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED

- Please confirm for work stoppage for adjacent court rooms? Will there be a minimum time for a notice? What construction trades will not be allowed during adjacent court rooms in session periods? Work will proceed as if no shut down will be required. There is a chance loud or noisy work during the day could be shut down without advanced notice. Noisy work shall be determined by the contractor’s best judgement. An occasional loud noise is acceptable. Sustained loud noise will most likely be shut down if court is in session.

- Please confirm all partition walls are fire rated in the area of work and what level are the partitions? Assume exiting walls are fire rated 1-hour

- Please confirm that the superintendent can multi role as the safety and health officer and waste management officer. Confirmed.

- Please confirm what are the waste management requirements for this project? See spec section 017419

- Please confirm whether there is a citizenship requirement on this project? An employee has to have lived in the US for 3+ years if they are a non US Citizen to qualify for a Tier 1 long term clearance otherwise they can only get a SAC, 6 month clearance. Of course this employee must be in this country legally, and legally able to work.

- Please confirm what the badging requirements are and how long it will take? Who pays for the badging requirements? See Spec section 015930. Full clearances take approximately 6 weeks to complete, though there are shorter clearance options depending on the trade.

This time is built into the project schedule during material procurement and submittal phase. The clearance process cost is paid for by the government except for the employee’s time.

- Please confirm there are no fire alarm requirements in this project. There is no fire alarm scope within this project.

- If fire alarm work is required, please provide the basis of design and any required installers. N/A

- Are there any fire rating requirements for the gypsum board tile ceiling. No.

- Is insulation required above the gypsum board tile ceiling? No.

Use corner bead with gypsum finishing compound.

Provide blocking or adjust framing spacing as required to provide required attachment substrate while maintaining the noted dimension

COA Library Office Additions Potter Stewart Courthouse Cincinnati, OH

PRE-PROPOSAL CONFERENCE

AGENDA

Judge Rice Courtroom Lighting Dayton Federal Building

200 W. 2nd Street Dayton, OH

Thursday, May 17, 2018 – 10:00PM (EST)

Welcome

GSA Introductions

Matt Bucker – Technical Rep / Project Manager Scott Day – Supervisory Property Manager Johanna Nieves – Contracting Officer Jordan Waldschmidt – Contracting Specialist Victoria Kahle – District Court Project Manager

Please make sure you sign in on the sheet which is circulating.

Disclaimer: No oral statement made by a government representative during the pre-proposal conference, nor any written record of such oral statements as may be made and subsequently furnished to the offeror, will be deemed to have the effect of adding to, modifying, or otherwise varying from the written provisions of the request for proposal (RFQ) including, but not limited to, specifications and written amendments to the solicitation. In the event discussion or questions are raised during this meeting to indicate a need to modify the RFQ, an amendment to the solicitation will be issued in writing and must be acknowledged in the same manner and under the same conditions as all other written amendments to the RFQ.

Project Overview The intention of this project is to renovate the ceiling in the courtroom including but not limited to the replacement of ceiling, constructing new ceiling, replace all lighting and lighting system, and provide new speaker system.

General Information

This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.

Cincinnati, OH

Your proposal package should consist of the following:

1. Standard Form 18 Bid Pricing Page Acknowledgement of all Amendments – When signing and returning amendments be sure to complete the address block (Item 8) with your company information. Include acknowledgement of any possible amendments.

Bonding is required.

Receipt of Offers: email to jordan.waldschmidt@gsa.gov.

Bids Due: Friday June 15, 4:00pm (ET)

Request For Information All RFI’s are requested in writing to the Project Manager no later than Friday, June 1, close of business. Responses will be forwarded to all contractors on or about Wednesday, June 6th close of business.

Period of Performance The Contractor shall be required to (a) commence work under this task order within (1) calendar day after the Contractor receives on-site notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work within 90 calendar days. The time stated for completion shall include final cleanup of the premises. See FAR 52.211-10

Working Hours Work shall be performed during Government Occupied Hours (6:00am – 6:00pm). The Contractor shall verify and coordinate time with COR. Provide not less than 72 hours’ notice of activities that will affect operations of occupied space and building.

Liquidated Damages If the Contractor fails to complete the work within the time specified in the task order, the Contractor shall pay liquidated damages to the Government in the amount of $182.65 for each calendar day of delay until the work is completed or accepted. See FAR clause 52.211- 12.

Contractor Performance Assessment Reporting System (CPARS) Contractor Performance Assessment Reporting System (CPARS) is the secure, confidential, information management tool to facilitate the performance evaluation process. The system enables a comprehensive evaluation by capturing comments from both GSA and the contractor throughout the construction.

Within 30 days of award, the contractor may receive an email that contains user account information, as well as the applicable contract number(s) and evaluation module assigned. The contractor will have one user account. Contractors are encouraged to visit http://www.cpars.csd.disa.mil/allapps/cpartrng/webtrain/webtrain_all.htm to sign up for free online Contractor Overview training when these sessions are offered.

Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used by Federal Agencies to support future award decisions.

Cincinnati, OH

Key Sustainable Products Initiative (KSP) Replaces the old Affirmative Procurement Program forms (APP/CPG) - Effective immediately – The KSP standards are mandatory for all contracts and task or delivery orders for (a) supplies and (b) services and construction performed on GSA owned or leased property, even if funded by a customer agency.

Upon award, Key Sustainable Product (KSP) forms will be provided.

Contractor Questions???