Waste Management Template

View the file

Other files for this federal contract opportunity

Other files attached to USAO Secure Processing Room Project, newest first.
File Type Posted
Amendment_05.pdf PDF
Amendment_04.pdf PDF
Amendment_03.pdf PDF
Amendment_02.pdf PDF
Amendment_01.pdf PDF
SF24-16.pdf PDF
Pre-proposal_minutes.docx DOCX document
Attendance_List.pdf PDF
14_Pre-proposal_Registration_Notice.pdf PDF
RFP_EQ5P2SS1P-18-0038.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Report Project Waste Management Plan : split report into 2? anticipated and actual?

-Steve Scavo - PMCBSubmittal Type:Waste Diversion Plan (Anticipated) :XWaste Diversion Report (Final) :
(to be filled out by GSA)
Project Name:ECC:$Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :
(to be filled out by Contractor)
Anticipated Waste Diversion Plan
To be filled out and submitted Pre-Construction (with final Construction Documents)Actual Waste Diversion Report
To be submitted during Project Close-OutDiversion

Rate

Material
(see weight conversion factors below)DiversionWaste not DivertedDiverted Materials all methodsWaste not DivertedTotal Diverted + Landfilled lbs
ReuseRecycleCompostEstimate % of each material divertedVendor / FacilityLandfillEstimate % of landfill materialDiverted lbsVendor / FacilityLandfilled lbs
Asphalt
Concrete
Soil, Rock, Land Clearing Debris
Cardboard
Carpet, Padding/Foam
Brick, Masonry, and Tile
Metals
Sheetrock (not painted)
Clean Wood
Ceiling tile
Painted wood, painted drywall, plywood0
Reusable items(complete Reuse List below)
Roofing
Other Debris:
Other Debris:
Other Debris:
Total:0000
Reuse List: Reusable items such as cabinets, built-ins, framing lumber, siding, etc. are encouraged to be reused on-site or off-site. Please list accordingly.
ItemUse locationOff-Site Benefactor or Deconstruction Company
On-siteOff-site
On-siteOff-site
On-siteOff-site
On-siteOff-site
On-siteOff-site
Weight Conversion Factors
Use the following conversion factors to help you with your estimated diversion for the Waste Diversion Plan. The Waste Diversion Report is a record of your actual diversion and disposal. The Waste Diversion Report and receipts from landfills, processing facilities, and recyclers must be available for review at project close-out.
Asphalt paving, crushed = 1,380 lbs / cubic yardConcrete , scrap, loose = 1,855 lbs / cubic yard
Asphalt/shingles comp, loose = 418.5lbs / cubic yardEarth, loose = 2,052 lbs / cubic yard
Brick, laid flat = 20 lbs/square foot flatFiberglass insulation, loose = 17lbs / cubic yard
Brick, loose = 120 lbs / cubic foot, 3,200 lbs / cubic yardSheetrock scrap , loose = 393.5 /cubic yard
Ceramic tile, scrap , loose = 1,214 lbs / cubic yardRock, crushed = 2,570 lbs / cubic yard

Instructions

Instructions
If you are completing this Worksheet, fill in the Waste Diversion Plan (pink-shaded) portion of the document prior to starting your project and the Waste Diversion Report (green shaded) portion of the document prior to final inspection. The following descriptions, resources, and examples will help you complete the Worksheet.

-- Material: Typical construction debris types are listed in the column labeled “Material”. If you have a significant quantity of a material that is not listed, use “Other Debris” and specify material. Hazardous materials are exempt from diversion.

-- Anticipated Diversion: Insert an X under the appropriate column (“Reuse”, “Recycle”, or “Compost”) depending on how you plan on diverting the type of debris listed. For example, sheetrock scrap can be broken down and reused as a soil amendment on-site, in which case you would enter an X for compost. More than one use can apply. If the material listed is not a debris type on your site, enter an NA

-- Estimated % of Each Material Diverted: Estimate the percent of the total of each material type that you plan to divert. For example, under Brick, Masonry and Tile, you may have brick that you plan to reuse on-site, but need to dispose of old tile flooring and mortar bed. If you estimated brick as half of the combined total of the material type Brick, Masonry and Tile, then you would enter “50%” in the estimated per centage in the Waste column.

-- Vendor/Facility: Enter the anticipated vendor or facility that will be receiving your diverted debris. If you are reusing a material on-site, enter “on-site”. To find vendors that recycle specific C&D materials as well as processing facilities that accept mixed C&D materials consult the local state vendor directoy lists.

-- Anticipated Waste: Enter an X under “Landfill” for materials to be landfilled even if only a portion of the material will be landfilled.

-- Estimated % of Landfill Material: Estimate the percent of the total of each material type that you plan to landfill.

-- Diverted Pounds: Enter the total number of pounds for the material category actually diverted. This should include the weight of the specific material type reused, recycled, and composted. Conversion tables below can be used to estimate weight if receipts are in cubic yards.

-- Vendor/Facility: Enter the actual vendor or facility that received your diverted debris. If more than one vendor is used, enter both. If you are reusing a material on-site, enter “on-site”. Save receipts from each vendor.

-- Actual Waste not diverted: .Enter the total number of pounds for the material category not diverted.

-- Vendor/Facility: Enter the actual vendor or facility that received your diverted debris. If more than one vendor is used, enter both. If you are reusing a material on-site, enter “on-site”. Save vendor receipts.

-- Actual Waste: No more than 50% of the combined total of materials of construction waste should be sent to landfill.

-- Total Diverted + Landfilled lbs

-- Diversion Rate: At the bottom of column K, enter the sum of the diverted items. In Column N enter the sum of the waste items. Divide the total amount diverted (K) by the total debris (K+N) and multiply by 100 to get your diversion percentage. (K/(K+N))x100=diversion%

-- Reuse List: Fill out as noted.