RFI_-1.docx

DOCX document 17 KB Posted

Attached to
R & R floor tile at Rodino Federal contract opportunity
Solicitation number
EQ2PSNN-18-0030
Issued by
General Services Administration Public Buildings Service Region 2

View the file

Other files for this federal contract opportunity

Other files attached to R & R floor tile at Rodino, newest first.
File Type Posted
DOL_Service_Act.pdf PDF
SOWelevatortile_replacement_6-18.pdf PDF
Request_for_Proposal_-_Rodino_Floor_tile.pdf PDF
SF18-_Floor_tile_at_Rodino.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI #1 R & R floor tile in 11 elevator at Rodino

1) Do you have specifications/data for the new tile to be installed?

Tile to be selected by GSA , however if contractor would like to submit a tile sample that will also be okay.

2) Has existing tile been tested for asbestos?

No Asbestos in elevators flooring.

3) Is a drawing/floor plan available for the elevators?

Contractor to tour building for measurements.

4) Will elevators be Locked out and Returned to service by the Building Manager?

Locked out by on duty elevator mechanic.

5) Tile is a very generic term for flooring. Do you mean Vinyl Composition Tile, Luxury Vinyl Tile, Ceramic Tile, or other?

GSA would like a heavy duty Vinyl Composition Tile or moulioum flooring for each elevator (all one piece)