Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

EQ10PME-16-5017-0001

General Services Administration Environmental & Energy Branch, 10PME 400 15th Street SW Auburn, WA 98001-6599

9A. AMENDMENT OF SOLICITATION NUMBER

EQ10PME-16-5017

03/09/2017

03/03/2017

See attached.

1. The purpose of this solicitation amendment is to change the date of the site visit, delete the instruction to request to attend the site visit, post the current contract value, correct 52.219-1, and add the equipment list.

2. The site visit is changed to 03/15/2017 at 10:00 AM.

3. The preproposal conference portion can be accessed using the following link https://meet.gsa.gov/r6g6iv42aqf/

GSA Meeting Space Audio Profile

US (Toll): 1-719-325-2013

US (Toll Free): 1-866-928-2008

Participant Code: 792705

4. The instruction “If there are no requests to attend the site visit received by 2:00 PM on 02/24/2017 the site visit will be cancelled” is deleted.

5. The current contract value is - $24,813 per month. The scope changed so make sure your proposal reflects the current requirements.

6. FAR clause 52.219-1 is changed to reflect the correct NAICS of 561210, with a size standard of $38.5 million.

7. Part III – Section J – List of Attachments, J.5. Building Information Sheet, is changed to reflect the right building.

8. The equipment list is attached. Ensure your proposal encompasses the whole requirements and not just the equipment list.

9. Offerors must acknowledge this amendment in their proposal.

10. All other terms and conditions remain unchanged.

Part III – Section J - List of Attachments

J.1. Quality Assurance Surveillance Plan (QASP)

J.2. Green Purchasing Report

J.3 Equipment Failure Report

J.4. Summary of Environmentally Preferable Product Attributes

J.5. Building Information Sheet Richland Federal Building & U.S. Courthouse

(WA0063ZZ)

825 Jadwin Avenue, Richland, WA 99352

J.6. Monthly Report Template

J.7. Building Operating Plan Template

J.8. Smart Building

J.9. Water Treatment

J.10. Energy & Water Operational Performance Targets

- Appendix A Building Energy Use History

- Appendix B Building Water Use History

J.11. Energy & Water Efficiency Use Plan (Reserved)

J.12. Energy And Water Efficiency Monthly Report

- Attachment 1 – Energy And Water Efficiency Reporting Template

- Attachment 2 – Clarification For Completing Monthly Energy And Water Efficiency Report

- Sample Data Report – Energy

- Attachment 3 – Example Energy And Water Efficiency Report – Contractor Input

- Energy And Water Efficiency Monthly Reporting Sample

J.13. Annual Energy & Water Efficiency Report

J.14. Qualifications Of Electrical Testing Technicians (Ett)

J.15. Miscellaneous Best Practices (Reserved)

J.16. Inventory/Cmms

J.17. Preventive Maintenance Schedule

J.18. Solid Waste And Recycling Report (Reserved)

J.19. DOL Wage Determination -

EXHIBIT B– EQUIPMENT INVENTORY LIST

Building: RICHLAND FEDERAL BUILDING Date: 10-1-2010

F re q /Y e a r

M a rc h

A p ri l

M a y

J u n e ly g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u ry

F b ru

Bldg #: WA0063ZZ Prepared by: Fred Moorehead

Field Office: RICHLAND PMT

PM Guide Description Qty Location

Page ACT #

A-01 AIR DRYER, REFRIGERATED 3 BUILDING

A-01 AIR DRYER, DESICCANT 2 BUILDING

A-04 INLINE DRYERS 1 BUILDING

A-04 AIR COMPRESSOR/FIRE SYSTEM 1 BUILDING

A-04 AIR COMPRESSOR 4 BUILDING

A-06 AIR CONDITIONING PACKAGE UNIT 5 TON 1 ELEV. RM.

A-08 WALL AIR CONDITIONER 1 BUILDING

A-11D AIR HANDLER 30001-50000 CF 10 BUILDING

A-11C AIR HANDLER 15001-30000 CF 4 BUILDING

A-11B AIR HANDLER 5000-15000 CFM 5 BUILDING

A-11A AIR HANDLER 1-4999 CFM 2 BUILDING

A-15 AFTER COOLER SEPARATOR 1 BUILDING

B-01 BATTERY CHARGER For Generator in room 1 BUILDING

B-01 BATTERY CHARGER 1 BUILDING

B-02F BOILER, OVER 1000 MBTU'S 3 BUILDING

B-03 BURNER, GAS 3 BUILDING

B-06 BOILER INSTRUMENTS/CONTROL 3 BUILDING

C-02 REMOTE AIR INTAKE DAMPERS 7 BUILDING

C-03 COILS, PREHEAT, REHEAT 1 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

PM Guide Description Qty Location

Page ACT #

C-04 CENTRAL MINI COMPUTER HVAC 1 BUILDING

C-05 A/C/HEAT CONTROL UNITE ASBE 749 BUILDING

C-06 CONTROLS, THERMOSTATS 748 BUILDING

C-06 CONTROLS, CENTRAL SYSTEM 120 BUILDING

C-07 CONDENSATE OR VACUUM PUMP 4 BUILDING

C-08 CENTRAL CONTROL PANEL HVAC 1 BUILDING

C-09B COOLING TOWER, 50-500 TONS 2 BUILDING

C-10B COOLING TOWER, CLEANING 50 2 BUILDING

C-24C CONDENSING UNIT/REF CRIT 1 3 BUILDING

D-01 DOOR, POWER OPERATED 8 BUILDING

D-03 DRAIN, ROOF, GUTTER 1 BUILDING

D-04 DOOR AUTOMATIC 9 BUILDING

D-05 MAIN ENTRANCE 42 BUILDING

D-06 DRAINS, AREA, DRIVEWAY, STREET 2 BUILDING

D-07 SEDIMENT BASIN 5 BUILDING

E-17 EXPANSION JOINTS, PIPES 9 BUILDING

E-19 EMERGENCY LIGHTS (CLOSED S) 73 BUILDING

E-20 INDUCT/DISC OVER CURRENT R 12 BUILDING

E-21 OVER AND/OR UNDER VOLT REL 2 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

E-26 L VOLT MLDED CIR BRKR +400 4 BUILDING

E-27 L VOLT POWER CIR BREAK 50+ 23 BUILDING

E-28 CUTLER HAMMER 480V 316 FLA 2 BUILDING

E-28 CUTLER HAMMER 480V 203 FLA 1 BUILDING

E-30

SWITCHBOARD (PER CUBICLE), MEDIUM

VOLTAGE

3 BUILDING

E-30A

SWITCHBOARD (PER CUBICLE), LOW

VOLTAGE(108)

1 BUILDING

E-32A H VOLT POWER OIL TYPE TRAN 4 BUILDING

E-34 DISCONNECT (ISOLATING SWITCH) 5 BUILDING

E-34A DISCONNECT (ISOLATING SWITCH 200-) 29 BUILDING

E-35 MOTOR CONTROL CENTER 17 BUILDING

E-36 AUTOMATIC TRANSFER SWITCH 6 BUILDING

E-37

BUS DUCT, METAL ENCLOSED,

DISCONNECT

1 BUILDING

E-37 BUS DUCT, METAL ENCLOSED, 10’ SEC. 15 BUILDING

E-38 H VOLT AIR CIRCUIT BREAKER 3 BUILDING

E-40

EMERGENCY GENERATOR ELECTRIC GAS

ENGINE 100KW (Annual)

1 BUILDING

E-40

EMERGENCY GENERATOR ELECTRIC GAS

ENGINE 100KW (Quarterly)

1 BUILDING

E-41 EMERGENCY GAS ENIGINE 1 BUILDING

E-42

EMERGENCY GENERATOR ELECTRIC GAS

ENGINE 100KW (Weekly)

1 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

E-42 EMERGENCY GENERATOR TESTING 1 BUILDING

E-43 LEAD ACID BATTERY 2 BUILDING

E-43A LEAD ACID BATTERY SEALED TYPE GELL 6 BUILDING

E-51 MOTOR STARTER, 5-100 HP 1 BUILDING

E-56 DIMMER/CONTROL LIGHTING 1 BUILDING

E-57 LOW VOLT DRY TRANSFORMER/3 25 BUILDING

F-01 ALARM CHECK VALVE & ACCESS 7 BUILDING

F-02 DRY PIPE DELUGE & PREACTION 3 BUILDING

F-04 FIRE CONTROL VALVE, 4 INCH. 17 BUILDING

F-05 FIRE PUMP, MOTOR/ENGINE DR 2 BUILDING

F-09 FIRE DEPT HOSE CONN., STPE 23 BUILDING

F-10 FIRE DEPT PUMPER CONN. 14 BUILDING

F-11 FIRE DOORS-STAIRWELLS/EXIT 87 BUILDING

F-13 FIRE SUPERVISORY SIG TESTING 46 BUILDING

F-14A SMOKE DETECTOR 53 BUILDING

F-14B HEAT DETECTOR 46 BUILDING

F-14C WATER FLOW 24 BUILDING

F-15 FIRE ALARM MAIN CONTROL PANELS 1 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

F-15A FIRE ALARM CONTROL PANELS SPECIAL 9 BUILDING

F-16D FIRE ALARM SYSTEM, REMOTE AMPLIFIER 16 BUILDING

F-17 FIRE ALARM BOX MANUAL-UNCO 70 BUILDING

F-18 FIRE AND SMOKE DAMPERS ASB 1 BUILDING

F-20 SPRINKER HEAD (PER 1000SQ.) 100 BUILDING

F-22 FIRE EXTING PRESSURE W/GUN (161) 161 BUILDING

F-23 FIRE EXTING GAS CARTR, NO (32) 32 BUILDING

F-24 FIRE EXT DRY CHEMICAL

BUILDING

F-25 FIRE EXTINGUISHER HYDROSTATIC 193 BUILDING

F-26 FIRE EXTINGUISHING SYSTEM 1 CAFÉ SYSTEM

F-27A RF-12 SHELDON 4,950 CFM 1HP 1 BUILDING

F-27A EF-1 EXIT-AIRE 2,180 CFM 1/3 HP 1 BUILDING

F-27A EF-2 SHELDON 240 CFM 1/8 HP 1 BUILDING

F-27A EF-2A EXIT-AIRE 240 CFM 1/8 HP 1 BUILDING

F-27A EF-3 EXIT-AIRE 670 CFM 1/16 HP 1 BUILDING

F-27A EF-4 SHELDON 3,000 CFM 3/4 HP 1 BUILDING

F-27A EF-5 SHELDON 950 CFM 1/2 HP 1 BUILDING

F-27A EF-6 SHELDON 1,850 CFM 1/2 HP 1 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

F-27A EF-7 SHELDON 950 CFM 1/2 HP 1 BUILDING

F-27A EF-8 SHELDON 3,600 CFM 3/4 HP 1 BUILDING

F-27A EF-9 SHELDON 450 CFM 1/4 HP 1 BUILDING

F-27A EF-10 EXIT-AIRE 400 CFM 1/4 HP 1 BUILDING

F-27A EF-11 SHELDON 260 CFM 1/4 HP 1 BUILDING

F-27A EF-12 SHELDON 260 CFM 1/8 HP 1 BUILDING

F-27A EF-13 SHELDON 900 CFM 1/4 HP 1 BUILDING

F-27A EF-16 SHELDON 2,105 CFM 1/4 HP 1 BUILDING

F-27A EF-19 EXIT-AIRE 975 CFM 1/4 HP 1 BUILDING

F-27A EF-20 EXIT-AIRE 1,455 CFM 1/2 HP 1 BUILDING

F-27A EF-21 EXIT-AIRE 230 CFM 1/4 HP 1 BUILDING

F-27A FF-1 ELEC. VENT. CO. 2,100 CFM 1/3 HP 1 BUILDING

F-27A EF-23 EXIT-AIRE 1,825 CFM 1/4 HP 1 BUILDING

F-27A EF-24 EXIT-AIRE 1,955 CFM 1/4 HP 1 BUILDING

F-27A EF-29 SHELDON 1,650 CFM 1/3 HP 1 BUILDING

F-27A EF-32 SHELDON 860 CFM 1/4 HP 1 BUILDING

F-27A EF-33 SHELDON 2,100 CFM 1/3 HP 1 BUILDING

F-27A EF-34 SHELDON 425 CFM 1/16 HP 1 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

F-27A EF-35 SHELDON 175 CFM 1/8 HP 1 BUILDING

F-27A EF-36 SHELDON 900 CFM 1/4 HP 1 BUILDING

F-27A EF-37 SHELDON 3,500 CFM 3/4 HP 1 BUILDING

F-27A EF-38 SHELDON 900 CFM 1/4 HP 1 BUILDING

F-27A EF-39 SHELDON 3,735 CFM 3/4 HP 1 BUILDING

F-27A EF-40 SHELDON 175 CFM 1/8 HP 1 BUILDING

F-27B EF-42 SHELDON 1,600 CFM 1/2 HP 1 BUILDING

F-27B RF-14 SHELDON 9,775 CFM 5 HP 1 BUILDING

F-27B RF-15 SHELDON 6,400 CFM 2 HP 1 BUILDING

F-27B EF-25 EXIT-AIRE 5,680 CFM 3/4 HP 1 BUILDING

F-27B EF-26 SHELDON 8,280 CFM 1 HP 1 BUILDING

F-27B EF-27 SHELDON 5,240 CFM 3/4 HP 1 BUILDING

F-27B EF-41 SHELDON 8,000 CFM 1.5 HP 1 BUILDING

F-27C RF-11 SHELDON 12,400 CFM 3 HP 1 BUILDING

F-27C RF-21 SHELDON 12,500 CFM 5 HP 1 BUILDING

F-27C EF-30 SHELDON 14,300 CFM 1 HP 1 BUILDING

F-27D SF-16 SHELDON 18,000 CFM 7.5 HP 1 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

F-27E RF-8 SHELDON 21,000 CFM 7.5 HP 1 BUILDING

F-27G RF-1 SHELDON 33,200 CFM 10 HP 1 BUILDING

F-27G RF-2 SHELDON 33, 040 CFM 10 HP 1 BUILDING

F-27G RF-5 SHELDON 31,030 CFM 10 HP 1 BUILDING

F-27G RF-6 SHELDON 31,800 CFM 10 HP 1 BUILDING

F-27G RF-7 SHELDON 32,300 CFM 10 HP 1 BUILDING

F-27H RF-3 SHELDON 36,200 CFM 10 HP 1 BUILDING

F-27H RF-9 SHELDON 36,200 CFM 15 HP 1 BUILDING

F-27H RF-10 SHELDON 39,800 CFM 15 HP 1 BUILDING

F-27H RF-13 1 BUILDING

F-29 FILTER, ROLL TYPE, DIS AS 42 BUILDING

F-30 FILTER, VISCOUS TYPE 12 BUILDING

F-31 FILTER, ROLL TYPE/MOTOR A 42 BUILDING

F-32 FILTER, THROW-AWAY 55 BUILDING

F-34U FLURES. FIX, DIFUSER 3 LA (14,600) 14,600 BUILDING

F-36 FAN, PROPELLER, OVER 24 IN. 2 BUILDING

F-39 CAFE EXHAUST HOOD PER FT. 40 BUILDING

F-49 FILTER CONTROL AIR 1 BUILDING

F re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

PM Guide Description Qty Location

Page ACT #

G-02 GREASE TRAP 1 BUILDING

G-03 GATES/FENCES/SECURITY/ACCESS 5 BUILDING

H-01 HOT WATER CONVERTER 2 BUILDING

H-06 GAS HEATER 2 BUILDING

H-14 HOIST LIGHTING 1 BUILDING

H-15 HOIST ELECTRICT 1 BUILDING

K-101

KITCHEN EQUIPMENT, DISHWASHING

MACHINE. ELECT.

1 BUILDING

K-102 KITCHEN EQUIPMENT, FRYER 1 BUILDING

K-103 KITCHEN EQUIPMENT, GRILL 1 BUILDING

K-105 KITCHEN EQUIPMENT, ICE MAKER 1 BUILDING

K-107 KITCHEN EQUIPMENT, OVEN 1 BUILDING

K-109

KITCHEN EQUIPMENT,

REFRIGERATORS/FREEZER/WALK-IN

13 BUILDING

K-110

KITCHEN EQUIPMENT,

BOILER/GENERATOR, STEAM

1 BUILDING

L-02 LOADING RAMP, ADJUSTABLE 2 BUILDING

L-03 LIGHTING, SPECIAL FIXTURE 1528 BUILDING

L-04 LIGHTING, OUTSIDE INCANDESCENT (72) 72 BUILDING

L-05 LAWN SPRINKLER (PER NOZZLE) 394 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

L-08 SPOTLIGHTS, FIXED & PORT 3 BUILDING

M-01 MANHOLE, ELECTRICAL 1 BUILDING

M-03A MOTOR, 1-7.5 HP 38 BUILDING

M-03B MOTOR, 7.5-50 HP 28 BUILDING

M-03C MOTOR, 50 HP AND OVER 8 BUILDING

M-04 MANHOLE, WATER/STEAM/FUEL 1 BUILDING

M-07 MATERIAL HANDLING EQUIPMENT 1 BUILDING

P-04A PUMP, CENTRIFUGAL 1-25 HP 9 BUILDING

P-04B PUMP, CENTRIFUGAL 25.5-100 HP 7 BUILDING

P-06 PUMP VACUUM 1 BUILDING

R-02 ROOF INSPECTION PER SQ. 266 BUILDING

R-05C REFRIG/MACH, CENTTRIGUGAL 250 TO 500 3 BUILDING

R-08 CONTROL PANEL CENTRAL REFRIG 1 BUILDING

R-09 RADIATION BASEBOARDS/CONV 281 BUILDING

R-11 REFRIG CONTROLS CENTRAL SYST. 3 BUILDING

R-13 NON-DESTRUCTIVE CHILL TUBE 3 BUILDING

R-14 HIGH EFFICIENCY PURGE UNIT 3 BUILDING

S-06 SEWAGE EJECTOR SUMP TYPE 2 BUILDING

F re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

PM Guide Description Qty Location

Page ACT #

S-07 SUMP PUMP SINGLE OR DUPLEX 4 BUILDING

S-08 STRAINER, Y-TYPE 3 BUILDING

S-09A STRAINER, BOLTED 6-14 BOLT 12 BUILDING

T-01 TANKS, WATER (ALL TYPES) 4 BUILDING

T-03 TANK, FUEL OIL ABOVE GRD 1 BUILDING

T-05 TRASH COMPACTOR 1 BUILDING

T-08A TRAPS, ALL TYPES HIGH PRES 75 BUILDING

U-01 UNIT HEATER (STEAM AND HOT) 1 BUILDING

V-02 VALVE, SAFETY RELIEF 5 BUILDING

V-03 VALVE, REGULATING 63 BUILDING

V-05 CRITICAL VALVS & OTHER AREAS 2" (118) 118 BUILDING

V-06 VALVE, MOTOR OPERATED 3 BUILDING

V-07 VALVE HYDRAULIC/PNEUMATIC 6 BUILDING

V-08 VALVE, CRITICAL CHECK 11 BUILDING

V-09A BACKFLOW PREVENTER UP TO 1 4 BUILDING

V-09B BACKFLOW PREVENTER 11/2 TO 3 BUILDING

V-09 BACKFLOW PREVENTER 3 1 IRRIGATION

V-09E BACKFLOW PREVENTER 4 TO 6 1 BUILDING

W-02 EMERGENCY EYE WASH 2 BUILDING

re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

W-03 WATER SOFTNER 2 BUILDING

W-04 FILTER, WATER 2 BUILDING.

W-08 WATER TREATMENT FOR COOLING 1 BUILDING

W-09 WATER TREATMENT FOR HEATING 1 BUILDING

X-23 HEATER UNIT, ELECTRIC 5 BUILDING

X-26 SOLAR HEATING SYSTEM (Solar Collectors) 1 BUILDING

X-26A SOLAR HEATING SYSTEM (Solar Collectors) 1 BUILDING

X-37 EMERGENCY SHOWER 1 BUILDING

X-42C

METAL ENCLOSED BUSS DUCT PER

DISCONNECT (INDOOR)

1 BUILDING

X-42D

METAL ENCLOSED BUSS DUCT 10"

SECTION (INDOOR)

14 BUILDING

X-50 VARIABLE SPEED FREQUENCY DRIVE 16 BUILDING

X-70 REFRIGERATED WATER FOUNTAIN

BUILDING

F re q /Y e a r

M a ri l

M g u s t

S e p te m b e r O c to b e r

N o v e m b e r

D e c e m b e r

J a n u b ru

PM Guide Description Qty Location

GS-10P-01-LSC-0013, Mod PS23 Operations & Maintenance Services Hatfield USCH/Pioneer USCH Portland, Oregon

Page 62-11 ACT #P88334374