Engineering Data List.pdf

PDF 55 KB Posted

Attached to
Fuel Starter
Solicitation number
SPRHA126Q0999
Issued by

About this file

This Engineering Data List (EDL) provides technical documentation for an F-16 Power System component, specifically a Fuel Control Assembly manufactured by Hamilton Sundstrand Corporation. The document is dated 09 SEP 2025, revision 14, and includes two line items: a Fuel Control Assembly (drawing number 5901030) and a Unique Identification (UID) Label (drawing number 200733803). The document is associated with CAGE code 99167, NSN 2910011355681RP, and originated from the 429 SCMS / GUMACA organization. A critical note indicates that release of this data to a foreign-owned, controlled, or influenced company requires approval from the Foreign Disclosure Office. The document was generated using PRPS with Jasper Reports and includes a legend explaining various furnished method codes for document distribution and availability.

View the file

Other files

File Type Posted
Packaging Statement of Work.pdf PDF
SPRHA126Q0999 CUI SSI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING DATA LIST

DATE:

09 SEP 2025

REVISION: 14 *HISTORY*

CAGE:

99167

PAGE:

NSN:

2910011355681RP

DATA TECH:

Sagen, Gregory G

END ITEM:

F-16 POWER SYSTEM

ORGANIZATION/OFFICE SYMBOL:

429 SCMS GUMACA/

MANUFACTURER NAME:

HAMILTON SUNDSTRAND CORPORATION

REFERENCE NUMBER:

5901030C

NOUN:

FUEL CONTROL,STARTI

LINE/

SUB CAGE

ENG DRAWING NUM/ ACCOMP

DOC NUM REV

NR

SHEETS

FURN

CODE

DIST

CODE NOUN REMARKS

L 99167 5901030 P S D FUEL CONTROL ASSEMBLY

L 98747 200733803 D S D LABEL, UNIQUE

IDENTIFICATION (UID)

Sagen, Gregory G 09 SEP 2025

W/ EO'S: 10A1433-H, 10A1486-H

NAME: DATE:

STANDARD ENGINEERING TEXT

Sagen, Gregory G 09 SEP 2025

RELEASE OF THIS DATA TO A FOREIGN OWNED, CONTROLLED OR INFLUENCED COMPANY IS DEPENDENT UPON THE APPROVAL OF THE FOREIGN DISCLOSURE OFFICE.

NAME: DATE:

C - CLASSIFIED DOCUMENT.

S - FURNISHED WITH SOLICITATION.

M - STABLE BASE DRAWING REQUIRED; FURNISHED WITH

CONTRACT AWARD.

X - DATA SUPPLIED (NOT IN JEDMICS).

R - FURNISHED BY PCO UPON REQUEST.

P - PARTIAL DOCUMENT FURNISHED.

V - VENDOR DRAWING; (NOT PROVIDED).

G - GOV'T DOCUMENT.

O - OTHERS, CONTRACTOR MUST ACQUIRE.

A- DATA NOT AVAILABLE.

FURNISHED METHOD CODE LEGEND:

Page 1 of 1EDL Version 14Generated by PRPS using Jasper Reports on 31 Oct 2025

File details come from the government source that posted it. Updated .