Enclosure 0-PWS South Campus HVAC.pdf
PDF 241 KB Posted
- Attached to
- J041--HVAC South Federal contract opportunity
- Solicitation number
- 36C26220Q0907
About this file
This sources sought announcement from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 seeks information from contractors interested in providing preventive maintenance services for HVAC systems and building automation at VA facilities in Los Angeles, California. Services required include technical assistance and routine service for a Siemens Apogee building automation system, preventive maintenance for mechanical HVAC systems including chillers and cooling towers, and supply of air filters and other consumables. Interested contractors were requested to provide company information, size status and representations, pricing for market research, and a capability statement by March 18, 2020 to peter.kim33@va.gov. The VA intends to consider a total SDVOSB set-aside but may pursue an alternate set-aside or full and open competition depending on responses received. No subcontracting is anticipated.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Enclosure 3-South Campus HVAC Equipment 2-5-2020.xlsx | XLSX spreadsheet | |
| Enclosure 1-CSS HVAC South.docx | DOCX document | |
| Enclosure 2-CSS HVAC South.docx | DOCX document | |
| 36C26220Q0907.docx | DOCX document | |
| Enclosure 4-VA GLA Air Filter schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
HVAC Preventive Maintenance Services
GLAHS-WLA South Campus
1. General. It is the intent of the Government to enter into a single award contract for performance-based PMI services on Government Owned HVAC equipment and Siemens Apogee Building automation System in accordance with the terms and conditions contained herein.
1.A. Background. With the implementation of the Siemens Apogee Building Automation system it has been proven to be effective to have a comprehensive solution to the maintenance of the entire HVAC system because all the elements of the system are integrated. The objectives of this contract are to:
1.A.1. Provide a clean and healthy atmosphere which is compliant with all hospital regulatory agencies such as the Joint Commission, CAP, CARF, OMI.
1.A.2.Maintain continuous operation of the HVAC and building automation system 24/7/365 days.
1.A.3.Maintain efficient operation of equipment.
1.A.4.Control temperatures through-out the building to satisfy facility requirements.
1.A.5.Control Air Pressures relationships and air exchange rates to meet facility requirements.
1.A.6.Ensure operation of HVAC equipment 24/7/365.
1.B. Scope. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items to perform HVACR service as defined in this Performance Work
Statement. The Contractor shall perform on-site maintenance, repair, calibration, performance verification and quality assurance to keep the equipment covered by this contract in optimum operating condition. Services are to be proactive in nature and shall include continual updating, maintenance and surveillance of the Siemens Apogee
Building Automation System for optimal performance in controlling the building HVAC systems.
1.C. Specific Tasks. Contractor will conduct a site survey and perform initial inspection of all systems covered under this contract. Contractor will provide written report within the first 120 days of services performed, inspection findings, actions taken, and recommendations for any further actions.
1.C.1. HVACR Systems. The contractor shall provide services for Preventive maintenance of the HVACR systems in the buildings listed below:
Brief Description of Service* Building Location
HVAC PMI / Apogee System PMI 304
HVAC PMI / Apogee System PMI 345
HVAC PMI / Apogee System PMI 401
HVAC PMI / Apogee System PMI 402
HVAC PMI / Apogee System PMI 500
HVAC PMI / Apogee System PMI 501
HVAC PMI / Apogee System PMI 507
HVAC PMI / Apogee System PMI Fisher House
HVAC PMI / Apogee System PMI Distant Patient Lodging (525)
HVAC PMI / Apogee System PMI 506
HVAC PMI / Apogee System PMI 114
HVAC PMI / Apogee System PMI 337
1.C.1.A. Preventive maintenance shall be performed in accordance with the terms and conditions contained herein and the manufacturer’s recommended maintenance procedures. It is the sole responsibility of the servicing contractor to schedule and perform all preventive maintenance inspections at the intervals specified, at a time mutually agreeable with the Contracting Officers Representative (COR). The VA Greater Los Angeles
Healthcare System does not assume any responsibility for reminding the servicing contractor that a preventive maintenance inspection is due. A copy of the PM inspection shall be provided to the COR at the completion of each inspection.
1.C.1.B. The Contractor shall perform system testing periodically. The Contractor shall inspect and test all systems to ensure the proper efficiency, reliability, and the safe performance of all equipment. Work shall be in accordance with applicable codes, equipment manufacturer’s recommendations, and the specifications herein.
1.C.1.C. All tests shall be a part of a Master Schedule. A copy of the Master schedule shall be provided to the
COR within the first 30 days of award of the contract. The Contractor shall confirm these test dates to the COR seven (7) days prior to the test. Tests that are disruptive to normal utilization of the building system such as electrical, heating, cooling, etc., shall be performed on weekends or during off hours on workdays at no additional cost to the government. The COR may exercise the option of witnessing these tests.
1.C.1.D. All inspections, tests, cleaning, routine repairing, and other preventive maintenance activities shall be performed in accordance with schedules required by the manufacturer’s recommendations, operating history, and
Facility requirements.
1.C.1.E. Contractor shall furnish all labor, materials, parts, tools, equipment software, firmware, and supervision to clean, inspect, test, adjust, diagnose, and maintain all items and components associated with the Apogee
Automation System (The Building Automation System, BAS) located throughout the VAGLAHS South Campus.
1.C.1.F. Contractor shall perform on site preventive maintenance inspections. Preventive maintenance shall be inclusive of all O.E.M. recommended checklists for all HVAC and Automation related equipment. These tasks include but are not limited to:
1.C.1.F.A. Annual battery replacement.
1.C.1.F.B. Monthly panel memory checks
1.C.1.F.C. Monthly panel programming unresolved code check
1.C.1.F.D. Semi-Annual network diagnostic communication test and report
1.C.1.F.E. Weekly failed points check
1.C.1.F.F. Weekly operator override check
1.C.1.F.G. Weekly server error report check
1.C.1.F.H. Semi-Annual seasonal loop tuning
1.C.1.G. Contractor shall at a minimum perform monthly checks to ensure the automation controls are in calibration, working optimally, and properly reflect any changes in the configuration of the building, system and varying climatic conditions. Checks will be performed more often if needed, as determined by the COR.
1.C.1.H. Analysis and Optimization will be performed on the software, network, automation controls and control loops a minimum of twice per year. A full report of the tests run, deficiencies found, and corrections and adjustments made will be provided to the COR. Optimization will be performed in May and November, or more frequently to assure optimum operation of the Apogee Building Automation System. A report will be provided within 5 working days of the optimization work being completed.
1.C.1.H. The contractor shall furnish and install INSIGHT software updates to maintain or improve present performance within the functional capabilities of this system. INSIGHT software updates shall be installed within
90 days of new version availability. Documentation will be provided for all updates in both hard copy and digital formats.
1.C.1.I. The contractor shall install all firmware updates as they become available and notify the COR of the updates having been made.
1.C.1.J. Software licenses shall be updated on an annual basis during the contract period. The update shall include the latest revision on INSIGHT, which is available for the Apogee Automation System. The contractor shall have updated the software to the latest revision level available from the manufacturer (if not already current).
The contractor shall coordinate the software update with the COR to accommodate any revision GLAHS may wish to make.
1.C.1.K. In the event of hardware failure, the contractor shall reload the graphics database and system file from its current backup copy.
1.C.1.L. All Siemens Apogee Insight workstation software and field panel databases will be backed up a minimum of twice per year to contractor provided resources of storage of the database. The database remains the intellectual property of the VA. The contractor shall back-up the INSIGHT graphics database monthly. In the event of catastrophic failure, the stored backup copy will be provided, and the system reprogrammed and tested within twenty-four hours.
1.C.1.M. VAGLAHS shall provide an IP address for a site to site connection to allow the contractor to connect to the BAS to correct deficiencies. The IP number shall be given to the contractor once the contract is awarded.
1.C.1.N. The contractor shall offer 24 hours of off-site diagnostic services. The contractor, from his facility, must be able to access the system via modem/computer access control to perform system evaluation and operation as part of this contract..
1.C.2. Mechanical Systems.
1.C.2.A. Contractor will perform routine maintenance services during normal business hours. The technicians shall provide inspection and analysis, preventive maintenance, assure continuous operation, repair services and simple modification and improvements.
1.C.2.B. All typical repair and maintenance materials are included in this contract. All materials or parts specified to be replaced during routine services according to manufacturer’s service guidelines shall be included as part of this contract.
1.C.2.C. Contractor shall provide a written plan to replace or upgrade mechanical systems and subsystems to maintain the buildings HVAC systems in an optimal state when economy of repair and efficiencies are no longer reasonable. Reasonable is determined when the cost of repair exceeds 35% of the replacement cost. The plan will include both a simple scope of work and a magnitude of cost. The final decision to implement suggested improvements shall be made by the Contracting officer and the COR.
1.C.2.D. Visually inspect, clean, tighten, adjust, replace worn components annually or more frequently as needed to assure optimum performance.
-Fan assemblies -Heat exchangers
-Belts & sheaves -Condensing sections
-Motor mounts & vibration pads -Compressor sections
-Electrical connections & contactors -Heating sections
-Heating & cooling coils -Humidifiers & strainers
-Filter media & racks -Seals & packaging
-Sight glass condition -Condensate drains & pans
-Bearings -Flame composition
-Spray nozzles & pans -Crankcase heaters
-Ignitor & flame assembly -Motor Starters and Drives
1.C.2.E. Physically check and/or test the following.
-lubrication requirements -damper operation
-oil sump, heaters, & temperatures -motor voltage & amperages
-starters operation -external interlocks
-water flows -refrigerant charges
-alignment on couplings -system(s) leaks
-motor operation conditions -oil & fluid levels
-suction & discharge pressures -pressure & temperatures
-flow switch operation -outside air intakes
-control interlocks -refrigerant pump down
-flue stack assembly
1.C.2.F. During preventive maintenance the following the checks will be completed at annual intervals
Calibration:
-temperature control -transmitter & receiver gauges
-operation & safety controls -economizer controls
-humidity & pressure controls -electrical connections
Secure and Tighten:
-motor terminals -equipment panels
-control terminals -motor mounts
-piping clamps -vibration pad nuts & bolts
-line fittings -damper sections
-mounting hardware
Adjustments:
-refrigerant charge -chemical feed equipment
-purge system(s) -gas pressure regulators
-superheat -combustion air ratios
-damper & valve linkages -set points
-unloaders -ignitor & flame red assembly
-belts tensions -sump floats
-fan rpm’s -tower basins
Alignment:
-open drive couplings -pulleys
-belt sheaves -coil fins
-belt drives
Vibration:
-damper linkages -pumps
-fan bearings -motors
-axial vane drives
Cleaning:
-control devices -heat exchangers
-electrical contactors -ignitors
-condenser & evaporator coils -nozzles & passages
-fan blades & impellers -equipment areas
-pilot & burner orifices -burner orifices
Painting and surface preparation as required, to prevent corrosion and deterioration of exterior equipment surfaces
Equipment tasking:
-Zone Boxes, VAV, and CAV Operating Inspection (as needed)
-Check operation of thermostat, adjust as necessary
-Check calibration of thermostat, adjust as necessary
-Check operation of damper(s), clean and lubricate damper linkages
-Verify maximum and minimum airflow parameters
-Make any needed repairs required
Pumps, In Line Circulator Operating Inspection
-Check equipment operation
-Check for leaks
-Check voltage and amperage
-Check for any unusual vibration
Cooling Towers Operating Inspection
Inspect unit visually
Check belts
Lubricate tower components
Check water flow and makeup valve
Monitor monthly chemical water treatment
Check operational controls
Check float valve operation
Check motor and drive condition
Service the tower filter system Weekly or as often as required to ensure proper operation
Adjust water distribution and maintain nozzles and orifices for even flow
Monitor the VFD and fan controls at least monthly to ensure that all fans are operating in synchronization
1.C.2.G. Basic Building system Mechanical repairs shall include but are not limited to:
1.C.2.G.1. Chilled Water Piping: Insulation repairs of rubber or foil/paper/Plastic covered/ faced fiberglass insulation replacement up to 4” diameter pipe, where repair materials will match those of original. Hard pipe insulation such as Polyisocyanurate with metal or paper jacketing is not included in this contract.
1.C.2.G.2. Field Piping- Building heating system: Contractor is responsible for piping between the last isolation valve and the point of use in the HVAC system, such as between the isolation valve and the terminal re-heat unit, including the electronic control valve, strainer, related parts, and the return line to the isolation valve.
1.C.2.G.3. Electrical: Contractor is responsible for complete PMI and service of the electrical portion of the
HVAC system from the Load Terminals of the disconnect switch controlling the HVAC equipment. The VA is responsible to provide power to the line side of the disconnect switch and the disconnect switch mechanism.
1.C.2.G.4. Duct work: Contractor is responsible for maintaining all duct work in a secure condition with minimal leakage. Damage caused to ductwork over 12” will be addressed on a case by case basis and is outside the scope of this contract. No new or replacement duct will be permitted to have insulation exposed to the airstream. The duct insulation will either be external or fully encapsulated, for example: Astrofoil, double wall duct or similar.
1.C.2.G.5. Contractor is responsible for controlling and monitoring the operating performance of the chillers and related equipment. Any abnormality in operation of this equipment is to be brought to the attention of the COR immediately.
1.C.3. Air Handling Units, Solar Inverters and Refrigeration Equipment. Air Filters: Filter service to be performed according to the type and frequency as described in the attached VA GLA Air Filter schedule for filter specification and frequency of service. Refrigeration Equipment: Includes all refrigerators, freezers, Nutrition and
Food Service equipment, reach in coolers, cold stations.
1.C.3.A. Operation Inspection:
• Lock out and tag out equipment as required
• Check all electrical connections. Tighten as needed
• Check all motor starter contactor surfaces for wear
• Lubricate air handling unit motor bearings and fan bearings if bearings are not sealed type.
• Check belt tension and sheave alignment. Adjust as required
• Check and vacuum clean evaporator coils for excessive dirt and debris
• Check and vacuum clean condenser coils
• Check and clean condensate drains and pans, ensure proper drainage
• Inspect air handling unit fan assembly
• •Check structural integrity of unit
• Check all mounting hardware
• Check Delta T’s
• Check Delta P’s
• Check operating controls for proper operation
1.C.3.B. Annual Inspection:
• Lock out and tag out equipment as required
• Check al electrical connections. Tighten as needed
• Check all motor starter contactor surfaces for wear
• Clean electrical controls enclosures
• Lubricate air handling unit motor bearings and fan bearings
• Check belt tension and sheave alignment. Change belt as required
• Clean evaporator coils as required
• Check and clean condensate drains and pans
• Inspect air handling unit fan assembly
• Check structural integrity of unit
• Check all mounting hardware
• Check operation of crankcase heater
• Meg-Ohm motor from starter and record
• Contractor shall replace the Motor contactor/starter with new OEM every time a motor is replaced, including refrigeration compressors, condenser fan motors, AHU motors etc.
1.C.4. Chiller Maintenance. Contract shall provide preventive maintenance service and inspection to chillers in bldg. #213, 215 and 501 VAGLAHS 11301 Wilshire Blvd. Los Angeles, CA 90073. Services will be performed during normal working hours of 6AM-4PM
The following services are to be performed on the following equipment
Centrifugal Chiller 1 Trane CVHF128NAW L97L07119
Centrifugal Chiller 1 Trane CVHF128NAZ L98D02586
Centrifugal Annual Inspection (Service 2) 1 annual inspection per year contractor shall perform the following:
Centrifugal Annual Inspection Description
• Customer Notification
• Initial Site Inspection
• Review Diagnostics
• Oil Level And Temperature Check
• Lock Out Tag Out Chiller
• Review Purge Report
• Oil Analysis Per Circuit
• Vane Linkage And Oil Valve Lubrication
• Centrifugal Oil Filter Change
• Purge Maintenance And Operation
• Purge Plus Expiration Date Check (High Performance)
• Compressor Starter Inspection - Centrifugal
• Meg Compressor Motor
• Control Panel Electrical Inspection – Centrifugal
• Calibration Check-Control Panel
• Close Panel Doors
• Rupture Disc Vent Line Drain
• Condenser Tube Brushing with Dropping Head-Annual
• Leak Check with Electric Heated Water - Evap and Condenser
• Pre-Start Chiller Check
• Remove Lock Out Tag Out
• Start Chiller o Manual Log with Hand-Held Device o Vibration Analysis Included
Centrifugal Operational Quarterly Inspection shall be performed quarterly (three times per year) with no less than 80 days between intervals and not more than 100 days between intervals
Centrifugal Operational Quarterly Inspection Description
• Initial Site Inspection
• Purifier Purge Maintenance
• Oil Level and Temperature Check-PCV
• Manual Chiller Log
• Purge Report Review
• HFC134a Engineered Conversion Package for CVAC
1 Trane PCV5BR00 N97K06756
Centrifugal Annual Inspection (Service 1) 1 annual inspection per year contractor shall perform the following:
Service 1: Centrifugal Annual Inspection Description
• Customer Notification
• Initial Site Inspection
• Oil Analysis
• Lock Out Tag Out (Generic)
• Purge Report Review
• Purge Maintenance and Operation
• Purge Plus Expiration Date Check (High Performance)
• Lubricate and Test Vane Linkage
• Remove Oil Filter wo/Rotary Drain Valve
• Replace Oil Filter -PCV, CVHA, CVHB
• PCV Compressor Starter Inspection
• Meg Motor at Motor Terminals
• Control Panel Electrical Inspection-PCV
• Calibration Check-Control Panel
• Close Panel Doors
• Rupture Disc Vent Line Drain
• Condenser Tube Brushing with Dropping Head-Annual
• Leak Check with Electric Heated Water - Evap and Condenser
• Pre-Start Chiller Check
• Remove Lock Out Tag Out
• Start Chiller
• Manual Log with Hand-Held Device
• Vibration Analysis Included
Centrifugal Operational Quarterly Inspection shall be performed quarterly (three times per year) with no less than
80 days between intervals and not more than 100 days between intervals
Service 3: Centrifugal Operational Quarterly Inspection Description
• Initial Site Inspection
• Purifier Purge Maintenance
• Oil Level and Temperature Check-PCV
• Manual Chiller Log
• Purge Report Review
130-400 Ton Air-Cooled Chiller - Series R(TM)
1 Trane RTAA1254XF U96D34287
130-400 Ton Air-Cooled Chiller - Series R(TM)
1 Trane RTAA1554XM U97A09202
RTAA Annual (Water Coil Cleaning) (Service 5) 1 annual inspection per year contractor shall perform the following:
Service 5: RTAA Annual (Water Coil Cleaning) Description
• Customer Notification
• Initial Site Inspection
• Review Diagnostics
• Lock Out Tag Out At Main Disconnect
• Compressor Starter Inspection (Wye-Delta Closed Transition) Series R Air Cooled
• Electrical Inspection (RTA*)
• Leak Test Inspection (Positive Pressure)
• Condenser Coil Check
• Remove Lock Out Tag Out at Main Disconnect
• Flow/Differential Mechanical Switch Check
• Compressor and Oil Separator Heater Check
• Compressor Check (HeliRotor Compressors)
• Oil Level Check Per Compressor
• Condenser Fans Check RTA* Per Circuit
• Oil Analysis Per Compressor
• Control Panel Calibration Check
• Low Temperature Sensor Calibration
• Start Unit
• Complete Required Paperwork
• Coil Cleaning Water (Applied)
• Manual Log with Hand-Held Device
• Vibration Analysis Included
RTAA Operational Quarterly Inspection (Service 6) 3 Centrifugal Operational Quarterly Inspection shall be performed quarterly (three times per year) with no less than 80 days between intervals and not more than 100 days between intervals.
Service 6: RTAA Operational Quarterly Inspection Description
• Customer Notification
• Initial Site Inspection
• Review Diagnostics
• Condenser Coil Check
• Condenser Fans Check RTA* Per Circuit
• Lock Out Tag Out (Generic)
• Visual Electrical Inspection
• Complete Required Paperwork
• Remove Lock Out Tag Out
• Start Unit
20-60 Ton Packaged Air-Cooled Chiller
1 Trane CGAFC304AHA1000D00000
C04J08125
Air Cooled Scroll Annual Maintenance (Service 8) 1 annual inspection per year contractor shall perform the following:
Service 8: Air Cooled Scroll Annual Maintenance Description
• Customer Notification
• Lock Out Tag Out Chiller
• Electrical Inspection
• Initial Site Inspection
• Control Panel Calibration Check
• Remove Lock Out Tag Out and Restore Power
• Manual Log
• Compressor Oil Level Check
• Acid Test
• Condenser Coil Cleaning w/Backflush
Air Cooled Scroll Quarterly Maintenance (Service 9) 3 Centrifugal Operational Quarterly Inspection shall be performed quarterly (three times per year) with no less than 80 days between intervals and not more than 100 days between intervals
Service 9: Air Cooled Scroll Quarterly Maintenance Description
• Customer Notification
• Compressor Oil Level Check
• Initial Site Inspection
• Manual Log with Hand-Held Device
• Brush condenser tubes, including dropping condenser heads, on water cooled chillers.
• Clean condenser coils on air cooled chillers.
• Perform Vibration Analysis on three centrifugal and two rotary chillers.
The following describes the service packages required for the various chillers listed:
Service 1: Centrifugal Annual Inspection Description
• Customer Notification
• Initial Site Inspection
• Oil Analysis
• Lock Out Tag Out (Generic)
• Purge Report Review
• Purge Maintenance and Operation
• Purge Plus Expiration Date Check (High Performance)
• Lubricate and Test Vane Linkage
• Remove Oil Filter wo/Rotary Drain Valve
• Replace Oil Filter -PCV, CVHA, CVHB
• PCV Compressor Starter Inspection
• Meg Motor at Motor Terminals
• Control Panel Electrical Inspection-PCV
• Calibration Check-Control Panel
• Close Panel Doors
• Rupture Disc Vent Line Drain
• Condenser Tube Brushing with Dropping Head-Annual
• Leak Check with Electric Heated Water - Evap and Condenser
• Pre-Start Chiller Check
• Remove Lock Out Tag Out
• Start Chiller
Service 2: Centrifugal Annual Inspection Description
• Customer Notification
• Initial Site Inspection
• Review Diagnostics
• Oil Level And Temperature Check
• Lock Out Tag Out Chiller
• Review Purge Report
• Oil Analysis Per Circuit
• Vane Linkage And Oil Valve Lubrication
• Centrifugal Oil Filter Change
• Purge Maintenance And Operation
• Purge Plus Expiration Date Check (High Performance)
• Compressor Starter Inspection - Centrifugal
• Meg Compressor Motor
• Control Panel Electrical Inspection - Centrifugal
• Control Panel Calibration Check
• Drain Rupture Disc Vent Line
• Low Temperature Sensor Calibration
• Start Chiller
• Condenser Tube Brushing Including Head Removal
• Pre-Start Chiller Check
• High Side Leak Check Inspection
• Leak Check with Hot Water/Electric
Service 3: Centrifugal Operational Quarterly Inspection Description
• Initial Site Inspection
• Purifier Purge Maintenance
• Oil Level and Temperature Check-PCV
• Manual Chiller Log
• Purge Report Review
Service 4: Centrifugal Operational Quarterly Inspection Description
• Review Diagnostics
• Review Purge Report
• Oil Level and Temperature Check
• Run Service Report from Kestrel View
• Manual Chiller Log (Applied)
Service 5: RTAA Annual (Water Coil Cleaning) Description
• Initial Site Inspection
• Review Diagnostics
• Lock Out Tag Out At Main Disconnect
• Compressor Starter Inspection (Wye-Delta Closed Transition) Series R Air Cooled
• Electrical Inspection (RTA*)
• Leak Test Inspection (Positive Pressure)
• Condenser Coil Check
• Remove Lock Out Tag Out at Main Disconnect
• Flow/Differential Mechanical Switch Check
• Compressor and Oil Separator Heater Check
• Compressor Check (HeliRotor Compressors)
• Oil Level Check Per Compressor
• Condenser Fans Check RTA* Per Circuit
• Oil Analysis Per Compressor
• Control Panel Calibration Check
• Low Temperature Sensor Calibration
• Start Unit
• Complete Required Paperwork
• Coil Cleaning Water (Applied)
Service 6: RTAA Operational Quarterly Inspection Description
• Initial Site Inspection
• Review Diagnostics
• Condenser Coil Check
• Condenser Fans Check RTA* Per Circuit
• Lock Out Tag Out (Generic)
• Visual Electrical Inspection
• Complete Required Paperwork
• Remove Lock Out Tag Out
• Start Unit
Service 7: SD REFRIGERANT MONITOR INSPECTION Description
• Report in with customer representative
• Record and report abnormal conditions
• Check chassis mounting in enclosure
• Check operation of clear language display.
• Replace sampling filter element / elements at sensing points.
• Provide zero and span calibration to accuracy within 1 ppm.
• Visually check photo-acoustic sensing device.
• Check periodic re-zeroing (if applicable).
Service 8: Air Cooled Scroll Annual Maintenance Description
• Lock Out Tag Out Chiller
• Electrical Inspection
• Initial Site Inspection
• Control Panel Calibration Check
• Remove Lock Out Tag Out and Restore Power
• Manual Log
• Compressor Oil Level Check
• Acid Test
• Condenser Coil Cleaning w/Backflush
Service 9: Air Cooled Scroll Quarterly Maintenance Description
• Compressor Oil Level Check
1.C.5. Air Compressor Maintenance: Full services are to be performed, includes all parts, labor and equipment:
Lubricant and oil filter changes, air filter changes, oil separator changes, filter mat changes, electrical system checks, filter cartridge replacement, safety control system check, differential pressure check, scavenger line filter check and change, V belt tension check/replace, minimum pressure check valve, inspect and clean coolers, switch over driers, and precoolers semiannually and any other manufacturer recommended preventive maintenance services. All services should be performed at quarterly, semiannual and annual intervals in accordance with manufacturer’s recommendations. Equipment is in buildings B295 and B501. Each building is a restricted access building and advanced notification is required for entry. Hearing protection is required in each building.
Building Manufacturer Model/Serial Number
B295 Powerex AD0755S5577870 H01/22/14-5577870-996
B295 Powerex AD0755S5577870 H01/22/14-5577870-990
B295 Parker PRD75 31761405
B295 Parker PRD75 31740204
B501 Atlas Copco GA18VSD API434286
B501 Atlas Copco GA18VSD API434181
B501 Ultra Air QT100AC Unk.
1.C.5.A. Operations and Air Flow Testing, Monitoring, and Reporting: Contractor shall perform regular testing, trend data and prepare reports on a regular basis including but not limited to monitoring spaces such as Negative pressure rooms, Operating rooms, procedure rooms and any space of interest as requested by the facility.
Pressurized (positive and negative) rooms shall be smoke tested for directional air flow and documented in the first week of February, March, May, June, August, September, November, December. Incorrect air flow will be reported to the COR and corrected as soon as possible by the contractor. A report of the results and any corrections required shall be turned in to the COR by the 15th of each month listed, or the next business day following the 15th.
1.C.5.B. Quarterly Space Differential Air Pressure Testing. Contractor shall provide certified reports for air flow and differential pressure according to the attached schedule. Spaces for this testing schedule may change according to the facility requirements. The facility shall be provided 3 bound copies of each report. Differential
Air Flow reports shall be provided within 7 calendar days after completion of testing. Testing shall be performed according to the standards published by the Associated Air Balance Council.
1.C.5.C. Annual Crucial Area Validation: The Crucial Area Validation reports shall contain detailed diagrams including the values of each supply and return/exhaust grill, a drawing of the area being tested with the differential air pressure value and a directional arrow indicating air flow. Differential pressure for every door in the subject space shall be tested and documented. The facility shall be provided 3 bound copies of the reports of areas tested within 7 calendar days of completion of the testing. Testing shall be performed according to the standards published by the Associated Air Balance Council.
1.D. Contractor Qualifications:
1.D.1. Apogee Building Automation System Field Service personnel must be factory trained and certified with a minimum of three years’ experience servicing and maintaining Apogee systems.
1.D.2. Contractor must be able to provide all manufacturer software updates, flashes and other software.
1.D.3. The contractor shall ensure that all employees performing maintenance and repair services are fully qualified, competent Field Service Engineers (FSE) who have been trained to perform work on the specific equipment in accordance with the OEM’s PMI/ repair procedures. “Fully qualified” is defined as factory-trained or equivalent and experienced to work on the equipment assigned.
1.D.4. Contractor personnel performing work under this contract must have a favorable basic security check at time of the proposal submission and must maintain the level of security required for the life of the contract.
1.D.5. Site FSE’s will be fully versed in the operation and maintenance of the Siemens Apogee Building automation system as well as all common industrial HVAC equipment. All site engineers will function at the journeyman level and must be graduates of an accredited trade school and / or a certified apprenticeship program.
1.D.5. Contractor shall have provided similar services to other customers of similar size and scope for at least 5 years.
1.E. Deliverables. The contractor shall provide the following reports.
Deliverable Frequency # of Copies Medium/Format Submit To
Initial Inspection and site survey with recommendations
Within first 120 days 3 copies Bound copy and digital
COR
Quarterly Differential Air
Pressure testing
Quarterly, within 7 business days of completion of testing
3 copies Bound Copies COR
Annual Crucial Area Test
Reports
Annually, within 7 business days of completion of testing
3 copies Bound Copies COR
Trend reports as requested such as Operating Room conditions
Weekly, first business day of each week for the previous week conditions.
1 copy Electronic- Email COR
Filter service reports and magnehelic readings of before and after changes.
within 7 business days of completion of testing.
3 copies Bound Copies COR
Deliverable Frequency # of Copies Medium/Format Submit To
Optimization reports of
Apogee System.
Semi-Annually May and
Nov
2 copies Printed and bound, and electronic
COR
1.E.1. Documentation and Quality Assurance: The contractor shall document each on-line and on-site service call and furnish the VA with a copy showing time, date, and a brief description of activity. Contractor shall meet with the VA monthly to evaluate system performance and VA satisfaction with the quality of service that is being provided under the contract.
1.E.2. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services, and include a plan when staff is out due to illness/vacation.
1.F. Equipment: The Contractor shall maintain Government provided computers, servers and work-stations for the Apogee system. All Computers and system components shall meet VA requirements.
1.G. General Requirements
1.G.1. Physical Security. The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.G.2. Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality
Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.G.2.A. In the event keys, other than master keys, are lost or duplicated, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the
Contractor.
1.G.2.B. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.G.3. Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
These procedures shall be included in the Contractor’s Quality Control Plan.
1.H. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference(s) convened by the contracting officer or COR in accordance with Federal Acquisition Regulation
Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.J. Contractor Personnel: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are
Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor employees will wear government furnished ID badges at all times while on the facility. Contractor employee will wear uniforms with company name/logo on the shirt
1.J.1. The follow personnel are considered key personnel by the government: Contractor Manager, Field Service
Engineer Lead Technician, Field Service Engineers. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer and COR. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7am to 4:30pm, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
Qualifications for all key personnel are listed below:
1.J.1.A. Contract Manager: A thorough understanding of the Joint Commission and Environment of Care requirements in addition to a thorough knowledge of HVACR maintenance and repairs.
1.J.1.B. Lead Service Engineer: Able to ensure all scheduled maintenance is performed and documented on time, reports are provided to the COR on time.
1.K. Government Furnished Items and Services. All items furnished to the contractor by the government will be used only in direct support of this contract.
1.K.1. The Government will provide telephone, office space, a parts cage/area for storage of necessary parts and supplies, electricity and air conditioning, keys for access, and internet access. Parking is provided in the
Employee parking lot. Except for delivery or pickup of tools or materials, parking in the area immediately south of Building 500 and Building 501 is strictly prohibited for the contractor and their sub-contractors
1.K.2. Utilities: All utilities in the facility will be available for the contractor’s use in performance of tasks outlined in this PWS The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
1.L. Smoking is strictly prohibited on the grounds of any VHA facility. Per VHA Directive 1085 dated March 5, 2019, it is VHA policy that all VHA health care facilities, including hospitals, community clinics, administrative offices and Vet Centers, will be smoke-free for patients, visitors, contractors, volunteers, and vendors effective
October 1, 2019. There will no longer be designated smoking areas.
1.M. Normal Working Hours. Normal working hours are 6am-4pm Monday through Friday. Service hours on the 1st Wednesday of each month shall be from 5am to 4pm to provide support for monthly emergency generator testing at building 501/500. Emergency on-call service shall be provided twenty-four hours per day, seven days per week including holidays.
1.M.1. Any overtime or holiday pay that may be entitled to the Contractor’s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.
1.M.2. The Contractor is not required to provide service on the following U.S. Government holidays nor shall the
Contractor be paid for these days:
1.M.3. National Holidays:
New Year’s Day January 01
Martin Luther King’s Birthday Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Independence Day July 04
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25
1.M.4. If the holiday falls on a Sunday, the following Monday will be observed as a National holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.
1.N. Insurance Coverage.
1.N.1. The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and
Employee’s Public Liability Insurance in accordance with Federal and State of California and/or Nevada laws. The
Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.
1.N.1. The Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.
1.N.1. Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR
Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.
1.N.2. Contractor is required to provide copies of proof of Workers Compensation and Employee Public Liability
Insurance within fifteen (15) calendar days after notification of contract award.
1.O. Contractor is responsible for repairing damages incurred during performance of this scope of work to include removal/installation or moving materials and tools in and out of the work area.
1.P. Changes. The awarded Contractor is advised that only the Contracting Officer acting within the scope of the contract has the authority to make changes which affect the contract in terms of quality, quantity, price or delivery. In the event the
Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment shall be made in the contract price to cover any increase in costs incurred as a result thereof.